• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New signal Post at Middleton Top!

Status
Not open for further replies.

Bill EWS

Member
Joined
10 Feb 2006
Messages
673
Location
Didcot
Enjoyed a walk between Middleton Top and Highcliff over the High Peak Trail yesterday. I noted they had built a new signal post at the top of the incline. However, I quickly noticed a serious error! They appear to have erected the signal the wrong way round! The signal is for wagons ready to descend the incline.

1zf5qhg.jpg


15qdqwn.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,774
Location
St Albans
The signal was facing the other way in 2012, and was replaced by some time in 2015, judging by photos on the 'Geograph' website (see http://www.geograph.org.uk/gridref/SK2755 ).
Looking at my copy of "The Cromford and High Peak Railway" (by A Rimmer, Oakwood Press, 1998) the original signal is shown in several photos as being just a few yards further down the incline just before a catch-point - and facing towards the top of the incline. But according to the book, the signals soon went out of use. It is also the wrong sort - even in 1955 it was a lower quadrant signal, not the current LMS/BR(M) upper quadrent arm. Shame they didn't make a replica of the proper type!
 
Last edited:
Status
Not open for further replies.

Top