North Clyde, Argyle and Cathcart Circle platforms are 6x20m long and it would be very challenging to extend enough of them to allow DOO. The new trains are 3-4x23m long so could not double up when necessary. There are plenty of electrified or soon-to-be-electrified routes that don't run through these platforms that they can find use on. Simultaneously, the existing 3x20m EMUs (minus the 314s) are to be kept and refurbished for continued use on their current lines. Putting new longer 160km/h trains on 140km/h routes with platforms too short for them and putting old shorter 140km/h trains on 160km/h routes with platforms that are being extended at great expense for them would be utter madness.
So where are the new units going to be used then? As I've stated before, there are going to be 70 of them, of which something between 35 to 40 will be required for E&G, Stirling, Dunblane, Alloa, etc. And the balance?