dk1
Veteran Member
The Stranraer suggestion is confusing me. It seems a total lost cause. Very indirect routing and no longer serves as a ferry port. In fact it only handled a paltry 30,196 entries/exits in the 2024/25 financial year.
No just no. We dont need more people experiencing their horrific cancellations!Hello, this is pure speculation and what ifs. If Avanti could implement new routes where would they go to? Maybe Inverness or Aberdeen?
Absolutely. I believe it was introduced with the Ayrshire electrification and utilised stock that would otherwise have been stationary in Polmadie, so no additional stock was needed.Well, they ran a crowd-busting Ayr - Glasgow service that used the stock for the Royal Scot so advertised as a through service. Doubt Ayrshire -the South traffic would have made it viable.
Or better still, convert the Windermere branch to tram operation and street run them to the promenade at Bowness to connect with the ferries.There may well be other routes that could be bolted on at The start or end of day, though I do think Windermere is a great shout.
Just a frequent tram shuttle with passing loop between Oxenholme and Windermere would do!Or better still, convert the Windermere branch to tram operation and street run them to the promenade at Bowness to connect with the ferries.
If you bought Stadler Citylinks then there's no impact to journey times as the linespeed is 60mph which is the max speed of Citylink tram-trains. Given there are only limited through trains from Windermere to Manchester it would allow simplification of the service pattern although it's hard to tell where a depot would goJust a frequent tram shuttle with passing loop between Oxenholme and Windermere would do!
Absolutely. I believe it was introduced with the Ayrshire electrification and utilised stock that would otherwise have been stationary in Polmadie, so no additional stock was needed.
There may well be other routes that could be bolted on at The start or end of day, though I do think Windermere is a great shout.
Not to mention reopening and electrification of Skipton-Colne with a half-hourly service from Skipton to Euston via BurnleyAll Manchester trains start from a suburb, going through all compass directions. Re-engineer the Bury line back to heavy rail standards so Bury can can direct trains to London.
At the London end, have the 40-odd daily trains all reaching a unique destination on the coast, using the ELL, Thameslink, WLL as imaginatively as possible, and HS1 via the NLL. With selected extensions to Palermo via the Channel Tunnel, Paris RER, Cote d'Azure and the train ferry. A daily train to China when geopolitical conditions allow.
Have a fleet of all-mode loco-hauled coaching stock with tilt. And have every 2 carriages share an auxiliary self power unit so the coaches can self shunt in pairs, thus allowing maximum train-length flexibility for different times of the day.
Very droll…I almost believed this until you got to Palermo. You did not, however, advocate running through-London trains via the Acton-Northolt Line, nor did you advocate splitting trains, or getting HSTs back into service, so points deducted there.All Manchester trains start from a suburb, going through all compass directions. Re-engineer the Bury line back to heavy rail standards so Bury can can direct trains to London.
At the London end, have the 40-odd daily trains all reaching a unique destination on the coast, using the ELL, Thameslink, WLL as imaginatively as possible, and HS1 via the NLL. With selected extensions to Palermo via the Channel Tunnel, Paris RER, Cote d'Azure and the train ferry. A daily train to China when geopolitical conditions allow.
Have a fleet of all-mode loco-hauled coaching stock with tilt. And have every 2 carriages share an auxiliary self power unit so the coaches can self shunt in pairs, thus allowing maximum train-length flexibility for different times of the day.
Agreed.Bolton to London via Preston would not be the stupidest idea in the history of ideas. It is as valid as Blackpool to use a marginal time set.
Hopefully this is as serious a proposal as the Palermo one!Or better still, convert the Windermere branch to tram operation and street run them to the promenade at Bowness to connect with the ferries.
Needs the reversal on both legs at Preston though, eats significantly into it.Bolton to London via Preston would not be the stupidest idea in the history of ideas. It is as valid as Blackpool to use a marginal time set.
The other reversal location would be Platform 1 at Wigan North Western, uses less time but possibly misses an important interchange location at Preston.Needs the reversal on both legs at Preston though, eats significantly into it.
An Ayr service might work for similar reasons
I dream of the day they extend MIA, it would make turning 390's back to normal formation SO easyYes, Pendolino is 217m for a 9-carriage, whereas the platforms at Manchester Airport are only 200m long.
Whether the signalling allows trains to overhang the platform I am not sure. Even then, the front passenger door would not be platformed.
2028. Though I don't think it will fit an 11 car.I dream of the day they extend MIA, it would make turning 390's back to normal formation SO easy
Oh is it actually happening?!2028. Though I don't think it will fit an 11 car.
It won’t happen due to many difficulties, but I’d take Avanti off Scot-Birm and give it to X Country with hourly Gl-/Ed portions joining at Carl then onto Birm and then Plym/Reading. Use bi-modes and big enviro win, and huge increase in direct and faster journey oportunities for Scotland and WCML passengers.2028. Though I don't think it will fit an 11 car.
They already have a brewery that fails to get anyone inebriated. Please, no more services for XC to fail on.I’d take Avanti off Scot-Birm and give it to X Country
Avanti really need to take over the Glasgow/Edinburgh to Manchester Airport service and the Glasgow - Liverpool route. While it would waste rolling stock, they would be better buying more 807s for it and then move the 397s to somewhere else. 807s would mean a more uniform fleet for the operator, which should make maintenance and traction knowledge easier and save having a micro fleet.Avanti get Scot-Man and possibly 397s.
LNER don’t seem too bothered about having a uniform fleet after ordering 897s. Where would you send TPXs 397s?Avanti really need to take over the Glasgow/Edinburgh to Manchester Airport service and the Glasgow - Liverpool route. While it would waste rolling stock, they would be better buying more 807s for it and then move the 397s to somewhere else. 807s would mean a more uniform fleet for the operator, which should make maintenance and traction knowledge easier and save having a micro fleet.
That’s one heck of a long way round for very little extra revenue.I wonder whether some trains to Glasgow Central could be rerouted via Dumfries and Kilmarnock and stop there, even if not at other intermediate stations? Admittedly they would need a diesel loco fitted at Carlisle. Also, due to platform lengths this may limit how many carriages could be used at these stations.
My guess is nothing significant will change because the staff and trains will still be at the depots they currently are, and there'll be little appetite for disruptive change from either railway management or politicians, who will both be very risk averse.Avanti won’t exist under GBR.
Perhaps the thread would be better titled ‘new services run by the UK Government funded operator out of Euston’
My guess is that there will be some quite significant change in 2028/29.
Could they not do the Newcastle to Edinburgh shuttles?LNER don’t seem too bothered about having a uniform fleet after ordering 897s. Where would you send TPXs 397s?
I'm not convinced that would ever need a fleet of 12 trains.Could they not do the Newcastle to Edinburgh shuttles?
With maintenance and maybe giving some to LNER as they would have 897s, it could possibly work.I'm not convinced that would ever need a fleet of 12 trains.
They could but there are 12 of them which is rather an overkill for the two-hourly route currently operated by TPE.Could they not do the Newcastle to Edinburgh shuttles?