There are three bridges at New Pudsey railway station
1. The footbridge serving the station
2. The narrow road bridge allowing cars to access the railway station car park
3. The bridge that allows the A647 Ring Road to cross the railway line
Looking at bridge number 3, does there appear to be enough space to fit a public footpath down the Manchester bound side of the railway line at track level. Ignore the issues with getting round bridge 2.
I was asked to expand a suggestion for improving access to New Pudsey and this could be an option that saves building a footbridge over the A647 (although that is a preferred option).
1. The footbridge serving the station
2. The narrow road bridge allowing cars to access the railway station car park
3. The bridge that allows the A647 Ring Road to cross the railway line
Looking at bridge number 3, does there appear to be enough space to fit a public footpath down the Manchester bound side of the railway line at track level. Ignore the issues with getting round bridge 2.
I was asked to expand a suggestion for improving access to New Pudsey and this could be an option that saves building a footbridge over the A647 (although that is a preferred option).