TrainBrain185
Member
Just a heads up that plans are being made to retire a small number of Pacer Units to become prototypes for a new generation of Raibus extending their lives up to a further 25 years of operation at least, some which are to be run on lease to a major European Rail Network. Due to the robustness of their support underframes, plans are being made up to totally re-engineer the complete running units. Plans drawn up include replacing the power unit to the latest Tier 5 emmission IVECO lean burn 240bhp Eco 9 Liter Engines. VoithTransmissions removed to be replaced by AC propulsion Axle End mounted Hybrid Motors on the prototypes. More flexible semi-steerable axles with air suspension all round. One Class 142 and one Class 143 to be the first test units to recieve a European Builder supplied "Bolt On" sloping fronted body with a greater impact compliance to the existing support underframes after complete re-engineering has been dealt with.