brad465
Veteran Member
Proposals for a third crossing to Anglesey have resurfaced, but there is no mention of rail being involved, even though the current railway crosses the Britannia bridge on a second deck as a single line. Should the new bridge offer to take the railway with it as a double-track setup? I think if there is demand for another road crossing here there must also be potential to increase rail patronage as well.
www.bbc.co.uk
M4 junction closures and new Menai crossing in plans to tackle congestion on Welsh roads
Welsh government will also re-examine the case for a new motorway in proposals announced today.
Junctions on the M4 in Newport could close, and a new bridge built across the Menai Strait, as part of Welsh government plans for two notorious transport bottlenecks.
It will also begin an 18-month project looking at a range of "roads-based" options for the M4, that could include a new motorway or expanding the Brynglas Tunnels.
Ministers are considering whether to close or partially close three junctions, potentially by 2028. However, a review has warned that closing them could cause increased congestion and noise on alternative routes.
It is not clear at this stage how anything would be paid for - the new Menai crossing could cost up to £700m and take up to 10 years to be built
...
The Welsh government said it would immediately recommence development work for a third Menai crossing.
Plans had been formally scrapped three years ago, although a year later the then Labour Transport Secretary Ken Skates suggested it was back on the agenda.
Officials believe a new crossing could cost around £670m, with development work taking up to two years. It would be at least eight to ten years before the crossing was built.
The A55 is currently carried over the Menai by the Britannia Bridge, and unlike the rest of the road it is a single carriageway.
The Menai Suspension Bridge has been restricted to vehicles under 7.5 tonnes since repair works began in October 2022.
The government has ruled out a three-lane tidal-flow operation on the Britannia Bridge after a review found significant safety and operational concerns.
Hooper said the government would invest in wind deflectors, variable speed limits and other improvements on the bridge.
But he said: "These measures will not replace the need for a third crossing."