I object to my takes being used to subsidise company car drivers and a host of other things, but there you go.
One man's tax break is another man's tax burden.
Will you stop peddling that lie - I've pointed out to you on several previous occasions that for 'perk' company car users (i.e. for those who do not need a car to do their job) the costs are pretty much break even, if not slightly more for having a company car - it's simply a case of whether the employee or employer holds the risk.
For people who have a car because their job dictates it i.e. travelling sales reps - the position is a bit different as the car is a tool needed to undertake the job.
Which "new" rail links are needed ? Well, where do you start, but thanks to Beeching travelling east-west in this country is a real problem, particularly in the Midlands, so I would suggest a new line from Bedford to Cambridge and a reopened/newbuild line from Peterborough to Northampton and Oxford.
Both cross areas of huge projected population growth and where there is no alternative to the car.
Bedford - Cambridge is being considered as part of EWR as well you know, however the BCR on that part is looking weaker than the Oxford - Bletchley element.
And once Bletchley - Oxford is in place, you don't need Northampton - Oxford, since that will be achieved by a single change at MKC or Bletchley. The only place of any size that was on the 'old' Northampton - Banbury (note, not Oxford) route of any size was Towcester and that's still a small place - certainly not big enough to justify a rail reinstatement.
You also continue to ignore the level of use that the current East-West links receive - both Bedford - Bletchley and Peterborough - Leicester are pretty much hourly services using 2 car DMUs - rarely if ever are these full to capacity aside the odd peak hour journey - to pretend or believe there is demand for more East West links in parallel to these is ignoring the reality of what is used now.
In the west, whole swathes of Dorset and Somerset were cut adrift by Beeching. A new line that enabled people to get to work in Bournemouth, Bath and Bristol, the main centres of employment, from towns formerly linked by the old S & D would be useful.
As for the S&D and its supposed "usefulness" - the only places of any size on the Bath - Bournemouth line which no longer has a rail service are - Blandford, which has a population of 11,000 and Shepton Mallet - also about 11,000 people.
To rebuild the S&D would result in a line almost 100 miles long - to put that in context, the Borders railway (which had a much, much better case) was only 35 miles and that cost about £ 350m to rebuild - to rebuild the S&D would probably cost £ 1,000m on that basis - hardly a sensible investment to put a couple of towns back on the rail network with a total population of about 40,000 people.
--- old post above --- --- new post below ---
Once East West Railway (western) is open it would be possible to travel between MK and Gatwick via Oxford and Reading by going around fairly easily (number of changes depends on how the timetables works, but is likely to be one or two).
Though you'd have to be nuts to consider making that journey using EWR.
There's already an hourly MKC - East Croydon service which means just one change to get to Gatwick. Or Bedford's less than 30 mins away (by coach) and will potentially be that quick once EWR has modernised the Bedford - Bletchley line, so change there onto Thameslink for Gatwick.
MK - Reading alone will be about 60 mins (on the basis they're quoting MK - Oxford as 40 mins).
--- old post above --- --- new post below ---
I would like to see a junction from HS1 near Ebbsfleet, a new line from there to Gatwick, on to Heathrow, then optionally a link up to HS2. This would open up a number of possible routes including Kent to Heathrow, Kent to the North avoiding London, And a much needed Gatwick to Heathrow link. This could significantly reduce demand on the M25, plus with some strategically placed interchanges with existing lines open up a wealth of possible journeys.
What demand is there for a Heathrow - Gatwick link?
People tend not to travel between airports.
As for linking HS1 to Gatwick - why? The whole purpose of HS1 was to provide a high speed link from London via the Channel Tunnel to Northern Europe (Paris, Brussels et al).
I think you fundamentally misunderstand who uses the M25 and why - many of the journeys undertaken are short hop (1 or 2 junctions) because the parallel A roads (particularly on the southern side) are poor to non-existent. A high speed rail line from Ashford to Gatwick and Heathrow will do absolutely nothing to alleviate that kind of traffic.
The other 'pull' the M25 has is for traffic travelling to the cross-channel ferry ports or Channel Tunnel - again, these suggested lines will do nothing to alleviate that because once on French soil, people are heading in many directions, not just to Paris.