This is the attitude that winds people up and you have done it plenty of times so far by dropping in little comments like the child in hospital one.
Only matching that of the hyenas.
--- old post above --- --- new post below ---
Unfortunately this is the heart of the problem. You ignore the parts of reports you don't like, cherry pick the numbers that look good and dismiss people who present any conflicting advice.
You absolutely will not be able to build the line for £40m. For a GRIP level business case you will need much more detail than the ARUP report provided and a higher level of optimism bias.
The 0.6 from ATOC and 1.3 from ARUP are very similar business cases benefits wise but ATOC assume a higher capital cost.
So to achieve a positive business case you either need more benefits or less costs.
I'd suggest very large scale housing development (5,000 houses+) as the most likely source of both of these.
You will need NYCC on board though and at present they don't seem enthusiastic.
Certainly have not cherry picked. The hyenas don't read my posts carefully enough and take them in. It is quite the opposite.
I know how to improve BCR thank you. That is why a through route is being looked at as the professionals, as opposed to certain posters on here, have suggested BCR will be improved having a through route as at Bicester-Oxford and Plymouth-Okehampton-Exeter.
Ah, are these the phantom houses that miraculously increase BCR? Not in Ripon I am afraid. Too much gypsum around for more than a 2,000 houses.
There are plans on hold for a new town of 25,000 inhabitants about 6 miles north of Ripon near where the old Ripon-Northallerton trackbed crosses the A1M. Could be the reason for NYCC included Harrogate-Northallerton in its Local Transport Plan two months ago.
NYCC told me they had identified an opportunity but would say no more than that.
I think I stated £45-£55m for Ripon-Harrogate as an extended siding but let us wait and see for an update on cost later this year.
Borders rail was quoted in the Scotsman only this week as costing £294m for 31 miles so strip out the double track, 6 stations and full signalling an that would make Ripon-Harrogate no more than £60m.
NYCC have estimated Harrogate-Northallerton at £192m and upgrade of Leeds-Harrogate for a 15 minute journey time non-stop (again criticised by the hyenas as not possible non-stop) for the new KX-Harrogate EC services introduced in 2018/19.
--- old post above --- --- new post below ---
It could be possible, given the right circumstances, to provide a new line and reduce the national subsidy to rail. However that would mean looking to build relatively short lines (say 5 miles) which link to lines which are relatively lightly used. In doing so the fixed costs of the lightly used lines are spread over more passengers with the variable costs being fairly small in comparison (i.e. it doesn't cost double the cost to NR if 2 tph run over an existing line that currently only has 1 tph).
Although doubling the frequency wouldn't double passenger numbers in it's own right, with an additional destination or two served it could be enough so that the TOC sees it as viable.
Obviously long single track routes probably may not be overly suitable for such a scheme (unless the cost of passing places is included in the cost and it is still good value), however double track lines with 2 tph or 3 tph on them could likely be good candidates.
West Yorkshire PTE wanted 4tph between Leeds and Harrogate instead of 2tph. I wanted 2tph Ripon-Leeds in the 2006 study. Separately they would be loss makers but join them together and the additional footfall feed from Ripon makes the Harrogate-Leeds portion profitable even if Ripon-Harrogate isn't. The same subsidy would be required but 9 miles would be added to the rail network.
4tph Leeds-Harrogate is happening in 2017 so must be a loss maker initially without being fed by traffic from Ripon.
--- old post above --- --- new post below ---
So 'deltic08' decides to take his bat home because he has found some people who dare to disagree with him!
He also said he wouldn't come to my town because it didn't have a train service well that's tough in my eyes we shouldn't be deciding transport policy on that basis.
Anyway I believe that the combined population of my nearest towns eg Cleckheaton/Heckmondwike and the Spen Valley area actually have a higher population than Ripon and the track bed of the Bradford line is still intact so maybe that should have a higher priority than Ripon.
On the other hand it does have a good bus service to Leeds, Bradford and Dewsbury and has managed perfectly well without a train service for the past 50 years.
As I have said I think we should concentrate investment on the existing routes and if we are to look at reopening more lines maybe there needs to a coordinated look at those which should be the highest priority rather than which Rail Campaign group shouts the loudest, and lets try and look at those lines on the merits of the area they will serve rather than a diversionary justification, that should be separate consideration and only considered if its the best option for both purposes.
It would also seem to me that some areas that don't have train services also don't have very good bus services either, so maybe we also need to look at how bus services are funded as well, and would a good bus service be a more cost effective option for some area's, rather than the very high cost of reopening some Railway Lines.
Haven't taken my bat home just yet. Have one or two posters to correct first.
I said I wouldn't travel to a town by bus if there wasn't a railway station. If I couldn't go by car I just wouldn't go. What is wrong with that. Twisting my words again for your own argument. My choice, I believe, to do that unless we have become a dictatorship led by hyenas.
Ah, Spen Valley. I was on one of the last excursion trains to travel over the route about 1980. Very sad day. Not enough residents fought for it. Needed more than ever. I feel as strongly about reinstating a railway down the valley as I do about Ripon and Keswick.
Residents have managed but not managed perfectly well. I know many living there who want the line reinstating but to start a campaign there again is spreading myself too thinly. It would be easier to succeed here than the Ripon line as you say.
What have you personally done to make this happen? Nothing? Why not start a campaign and then you can be brutalised too. I would support and defend you though.
Bus services
are heavily subsidised in West Yorkshire by bus passes and other subsidised schemes. There were over 10m bus pass journeys in West Yorkshire in 2012. This will become less as bus passes are withdrawn from under 70 year olds by 2020.
--- old post above --- --- new post below ---
I think I have done a good job on this thread even though very few agree with me. You all know more about the Harrogate-Ripon-Northallerton line now than you did before even the hyenas who don't read my posts fully. Any publicity is good publicity.