New footbridge at Todmorden - arriving by rail?

Status
Not open for further replies.

strowger

Member
Joined
2 Sep 2013
Messages
184
Foundations are being dug for a new footbridge at Todmorden, to replace the crossing at the foot of Dobroyd Road (barely visible through the trees in this google maps link: https://goo.gl/maps/DsLQe)

It's said locally that the bridge itself will arrive by train. This is somewhat conceivable as the line is currently closed on Sundays anyway, and road access to the place in question is quite poor.

Does anyone know whether it's likely that the bridge will arrive by rail, and if so when this has been arranged for?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,933
Location
Exeter
the footbridge was built a few weeks ago and looks complete but it is still fenced off and the crossing still open. Anyone know what's going on?
 

strowger

Member
Joined
2 Sep 2013
Messages
184
There must be further works planned, if only to sort out the drainage situation on the "castle"/Dobroyd Road side, where quite significant amounts of water currently run down the hill and across the rails when it rains.

This started when the bridge works begun and there's noticeable deterioration in the state of the trackbed. If you stand and watch trains go past when the ground is wet, you can see sleepers next to the crossing "pumping" vigorously and spraying mud up into the air.
 