• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

New footbridge at Hoo Junction

Status
Not open for further replies.

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,398
Location
S Yorks, usually
Just noticed there's a new footbridge at Shornemead Crossing/Hoo Junction, replacing the foot crossing. Is it open yet (I think I glimpsed scaffolding)? Does it offer photo opportunities for the yards?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,426
Just noticed there's a new footbridge at Shornemead Crossing/Hoo Junction, replacing the foot crossing. Is it open yet (I think I glimpsed scaffolding)? Does it offer photo opportunities for the yards?
Last estimate I heard for opening was 'end of august'



MARK
 

z444z

Established Member
Joined
17 Apr 2022
Messages
1,219
Location
London
Will the road crossing remain open with the footbridge as an alternative, or is the level crossing being closed completely?
 

FR510

Member
Joined
20 Oct 2020
Messages
111
Location
Kent
Will the road crossing remain open with the footbridge as an alternative, or is the level crossing being closed completely?
I believe the level crossing has been closed for some time due to the level of misuse and near misses at that location.

The footbridge is replacing the level crossing to enable public right of way once again.
 

bishdunster

Member
Joined
9 Oct 2012
Messages
323
Location
Dunster
The parish council quotes "the long awaited stepped footbridge" sureley not in this day and age of disabled access, i also note that the opening was scheduled for today, did this happen?
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,398
Location
S Yorks, usually
in this day and age of disabled access
I guess it's permitted because the previous crossing wasn't wheelchair accessible, with really tight gates. As another example, there's a new footbridge near Hathersage with only steps as it's accessed across a field via stiles and gates that are impossible for wheelchairs.

And I think its days as a vehicle crossing are a very long time gone.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,453
Location
Northampton
The parish council quotes "the long awaited stepped footbridge" sureley not in this day and age of disabled access
Application decision letter is available here: https://docs.gravesham.gov.uk/Publi...wDocument?id=5FFC003BFECB4EEB940C7422909D8A57

Which contains the following bullet point:
Shorne Parish Council
[...]
The proposed design appears satisfactory at this time as a balance has been struck between provision of accessibility for people, including with bicycles, in line with historical use, while not providing easiest access to the marshes for unwanted motorbikes and other previous abusers of the crossing.
(the application letter also makes reference to previous applications being granted and the crossing has been closed for a very long time so there's a whole other question about why this has taken so long).
 

Train Maniac

Member
Joined
28 Sep 2018
Messages
466
Can confirm, the new footbridge at Hoo Junction is now open. Great location for spotting trains coming out of the yard!

20251203_142048.jpg
(Image: 69 007 hauls a heavy engineers train out of Hoo Junction Yard bound for Eastliegh)
 
Status
Not open for further replies.

Top