As I understand once Reading station remodelling has finished in about six weeks time, the focus will move onto building flyovers for the fast lines to the west of the station. Does anybody know what the disruption will be like, ie will there be a reduction in service, or will the extra five platforms allow trains to sit at the station rather queuing outside as they do currently, or will there be Christmas and Easter time installations of massive precast structures that shut down traffic on those lines for a period of time?