• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

new class 450 diagrams??

Status
Not open for further replies.

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,265
Just looking at Poole on Google Earth, a 12-car train might cause havoc with the level crossing in the Weymouth-bound direction. It depends on the location of the track circuits that detect the train

Unlikely really, as Poole's down platform is listed in the sectional appendix as having nearly 248m usable length. There are any number of 10.444 trains booked as far as Poole. At 230m long there's little or no difference between them and a 12.450 at 240m.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
The only 12 car 'Poole' trains I can find in the CWNs (from last year) seem to split at Southampton in the down direction to form an 8 car to Poole at 1030 with the rear portion becoming an ECS route learner to Guildford; and in the afternoon a 4 car up train from Poole has 8 cars added at Southampton to form the 1555 departure.

Still the case.
--- old post above --- --- new post below ---
Just looking at Poole on Google Earth, a 12-car train might cause havoc with the level crossing in the Weymouth-bound direction. It depends on the location of the track circuits that detect the train

As swt_passenger has detailed, they fit fine.
 

Feathers44

Member
Joined
12 Aug 2014
Messages
378
I saw an 'extra' 450 going through Worcester Park on Wednesday (I think) morning just before 8. I didn't see any other extra appearances, but then I was at work in Crawley for most of the day so that's not really a surprise.
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
What it involves is going straight down through Guildford via either platforms 2 or 3, stopping in the tunnel so that the rear of the train is clear of 826 or 1308 signals, the driver then changes ends and then drives back through any of platforms 4,5,6 or 8 and onto the down Ash towards Aldershot.

No issues if it's a 4 car, however if it's an 8 or 12 then passengers will have to move as they'll be in the wrong part of the train.
 
Last edited:

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,156
There's a couple of new 450 diagrams on Reading services from this week, replacing Class 458/0s going away for conversion to 458/5s.
 
Status
Not open for further replies.

Top