i never did that i simply removed one express from timetable and replaced it with a service to east anglia...... the other would still remain a competeitve express train.....
If i may quote you.....
MML could have something very similar done with it... from sheffield to well i cant think right now but im sure somethin similar could be done....
WCML some places services will be enhanced beyond recognition without so many fast services some stations will see services improved vastly...
This, in it's entirety, reads to me like the express service will be run down and replaced with more stopping services. In effect, glorified FCC.
--- old post above --- --- new post below ---
I asked earlier in this thread what the "£30bn" could buy - and nobody answered.
The WCML upgrade cost around £10bn (depending on sources), and added some capacity to a line which was already fast and already "four tracked" on long sections. You're talking around £2,500,000 for each new coach (based on Pendolino prices)
Building another two tracks over Welwyn would be a significant cost. Replacing flat crossings/ adding loops etc would all add up.
So, if HS2 only benefits a minority of the UK, what would the "anti HS2" brigade rather it was spent on instead? I'm serious - give some examples.
As i stated earlier in this thread, and in the other HS2 thread, i believe the money should spent on rolling electrification and line upgrades, by which i mean speed enhancements, signalling upgrades, re-doubling and some platform extension.
You could achieve a heckuva lot of that with £30bil, even £20bil!
--- old post above --- --- new post below ---
Who has said HS2 should be a priority over the existing network? What's being argued is that we need to take long-term capacity issues just as seriously as those which we're currently suffering from.
But HS2 is being seen as a priority. I don't see £30bil being committed to a rolling programme of electrification, infrastructure enhancements and much needed modernisation across the rest of the network.
As regards long term capacity issues, then yes, bear them in mind, but address the immediate concerns first.
As our most important routes get ever busier, and the relatively cheap and simple capacity enhacements have been carried out, so catering for more trains and more people gets a lot more expensive and disruptive very quickly - the WCML is getting to that point, and other lines will as well in the coming decade or two.
By the most important routes do you mean the "more equal than other ones?"
Lets face it, for better or worse, the WCML has already had pots of money thrown at it. It may be far from perfect but it's an improvement on what it was. Hopefully they'll also get the extra Pendo's which will alleviate things further. High time to spend a bit a bit of money on the rest of the network, that is already suffering huge reliability and capacity problems.
It serves our most important economic centres, so ignoring it is out if the question. The only way to cater for any sizeable increase in capacity that wont make the WCRM seem like a walk in the park are another, seperate, pair of tracks. Not Cheap.
People keep going on about the, so called, "most important economic centres". Do people really think that if everywhere except London and Manchester were to fall into the sea then things would still be just fine?
It's the country as a whole that creates the prosperity, not just a few fashionable cities, and the whole country needs to get to work on time.
-How do you make this massive investment viable? Increased revenue, so that means new passengers too. Speed, whilst not needed for capacity reasons is needed to generate the extra passengers (revenue) needed - the higher speed also makes extending the line to Leeds etc viable.
And will travel on HS2 be priced as on the existing lines? or will passengers pay a premium for the new "highspeed" service? Would someone choose to go to the Capital from Leeds by paying extra to go by HS2, or by saving £'s going via existing lines which still have an acceptable journey time?
-How does this benefit more people than smaller, piecemeal upgrades? By moving trains from existing lines onto HS2, new (perhaps direct) services can run on existing lines like the ECML and MML while the WCML can concentrate on better serving intermediate stations - directly and indirectly benefitting people across much of central and NE and NW England when the line is finished to Manchester and York.
As i've said earlier, so many times i'm getting a little tired of saying it, diverting "express services" away from the existing lines, and replacing them with slower "stopping services", effectively downgrades a mainline and can hardly be called progress.
I hope you can see why i think HS2 is just as important as upgrading existing lines, and will also complement them.
Chris
Sorry mate, but i'm still not convinced it's justified at this time when the existing network has immediate problems and not just future potential ones.