NorthKent1989
Established Member
- Joined
- 13 May 2017
- Messages
- 2,172
As a amateur writer I once wrote a story regarding this, I won’t go into too much detail now but here’s what I came up with:
- New sub sector lines arise in the mid 1990s, Thames & Medway is split off from Kent Link and covers the Greenwich and North Kent lines down to Medway, Maidstone West and Tonbridge,
Windsor & Reading lines is also formed
- CrossRail remains a NSE and LT joint effort and opens in the late 2000s
- Thameslink 2000 does indeed go ahead shortly after the year 2000, with routes to Ashford, Kings Lynn and Peterborough
- High Speed One is NSE operated
- NSE upgrades the North London lines
- The Sub Surface Tube lines are absorbed into NSE (okay this is far fetched but in the early 2000s Railtrack did want to take over these lines) as the Metropolitan District Lines
This is obviously fantasy and not to be taken seriously so feel free to add your ideas!
- New sub sector lines arise in the mid 1990s, Thames & Medway is split off from Kent Link and covers the Greenwich and North Kent lines down to Medway, Maidstone West and Tonbridge,
Windsor & Reading lines is also formed
- CrossRail remains a NSE and LT joint effort and opens in the late 2000s
- Thameslink 2000 does indeed go ahead shortly after the year 2000, with routes to Ashford, Kings Lynn and Peterborough
- High Speed One is NSE operated
- NSE upgrades the North London lines
- The Sub Surface Tube lines are absorbed into NSE (okay this is far fetched but in the early 2000s Railtrack did want to take over these lines) as the Metropolitan District Lines
This is obviously fantasy and not to be taken seriously so feel free to add your ideas!
