The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,728
3 minutes is nothing on a 90 minute journey.
3 minutes is nothing on a 90 minute journey.
That is a misleading statement. The 7:24 from Leeds is a HST that stops at 8 stations after Sheffield, the 7:29 is a 222 which calls at 4 - Journey time is longer on the HST, clearly it's a service catering for capacity on the intermediate journeys.
I don't see the word infinite - I see the loose words "strong case" and argued by local/regional groups
HS2 largely replaces MML for its Sheffield-London traffic in potentially 15 years from now.
To be fair, that document is 6 years old and nicely sidestepped the limited resource issues of completing electrification on operational track in 4hr possessions through the night - unlike Crossrail/HS2 which will be stringing wires on a construction sites
EMT are on record as wanting rid of HSTs as soon as possible, as they are becoming very difficult to maintain.
Isn't the answer to use Mk4s cascaded from the ECML, with class 67s actually achieving their claimed 125mph (or at least 110mph) on shortened rakes?.
Two schemes - the Great Western Main Line and the Midland Main Line - have particularly high BCRs without dependency on further electrification. In the case of the Midland Main Line the value is technically infinite given that it involves a net industry cost saving rather than a cost.
6 years old but the benefits of electrification have not changed. If anything the benefits are greater now as passenger numbers have increased, and rolling stock is older than when the document was published.
Estimates of electrification costs on GWR seem to have doubled or more in a very short time. If they've increased similarly on MML, they may now exceed direct benefits, so the "infinite" bit may no longer be true.
Not misleading at all. I said mostly, not all. The 07:24 is indeed a stopping HST that gets a set from Neville Hill into service. There's one goes back up in the evening too. The vast majority of HST services through the day are the XX:32 Notts - St Pan that only have 3 stops.
Page 78, Section 7.3.2. The bit that reads:
technically infinite
The Midland Mainline is bigger than Sheffield. HS2 will benefit no other users at intermediate stops. Not even around Nottingham or Derby as the time savings of travelling on HS2 will be lost getting to Toton.
6 years old but the benefits of electrification have not changed. If anything the benefits are greater now as passenger numbers have increased, and rolling stock is older than when the document was published.
Crossrail and HS2 may not impact the existing railway during construction, but they'll certainly impact on the surrounding roads and residents.
Meridian's are not the most reliable of units, and it is a constant battle for the maintenance team to keep the HST's running.
I've travelled between Nottingham and Leicester regularly (4/5 times a week) over the past 5 years and have only once experienced a problem with the Class 222s (two engines were not working) which related specifically to the train rather than external factors. The 'problem'? We arrived a whole 10 minutes or so late into Nottingham. Big wow!
I find that, aside from a spate of 'Monday Jumpers' EMT run a pretty decent service, with generally clean trains and a reliable service. But I'm just a user, rather than a enthusiast, what would I know?
Rewind a bit, we were talking about your claim of the "disaster" that is the delayed electrification, yet we are heading way into strawman territory here with a parallel debate about continued use of HST's despite EMT's alleged objections. The fact is that EMT do use HST's on routes with many stops because they need the capacity at a peak time - key here is capacity shortfall, not time to travel to London and just how much would continued use of DEMU's degrade vs the preferred EMU solution - especially now in the wake of HS2
Nonsense, remove the Sheffield travellers and you have a better service for travellers further down the line - and you are falling into the trap of assuming travellers from Derby and Nottingham do so because it's easy - vast areas of both cities will find it quicker travelling against the dominant peak flow into the two cities to get to Toton
They increased a little due to the neccessity of renewing existing OHLE equipment south of Bedford to cope with 125mph, but apart from that the project was pretty much on track and confidence was high.
What's to say that as the project continues into the actual electrification part (not just any bridges etc... done so far) they won't meet problems like experienced on GWML and start to see the project fall behind plan and over budget?
One or more engines out on a Meridian is fairly regular, along with other problems, but hey, i'm only a Driver with a mere +25years experience on all types of train in the East Mids, what could I possibly know that a enthusiast doesn't.
I obviously have a very different viewpoint to yours. I have tried to answer your questions and counter your points in a respectful manner. I would appreciate it if you didn't refer to my views as "Nonsense". As I mentioned above, I am a Railway Professional with many years of experience in the industry, and while I make no claim to be an expert in all fields, I do have a good knowledge of the railways in the East Midlands and what makes them tick, and also what would make them tick louder.
This is the second time electrification has been denied to the MML. The first time the wires didn't make it past Bedford. Years of underinvestment in the region have taken their toll and when cracks appear they are merely papered over at best. You will forgive the people of the area, myself included, for actually caring and being short changed yet again.
That is all.
As to the debate over diesel power on the Midland and what cast-offs might be brought in from other lines, I fail to see how any units other than 220s could keep the Class 222 timings on a main line characterised by many changes of gradient and a very uneven speed profile that requires constant deceleration and acceleration.
Driver and condescending throbber too it appears. Did you use the word "enthusiast" as some kind of limp attempt at an insult?
Now would I consider myself an enthusiast? No, first and foremost I'd consider myself a rail user as I only use the railways as a means of getting around, not because I am 'enthused' by them. To this end I gave my opinion as a (regular) service user and I stand by my comments, they're not made up!!
If you don't agree with my comments then that is your pejorative but there is no need to be an arse about it.
Do those complaining about deferment of MML electrification propose that the GWML should be deferred instead, or believe we have the resources to undertake both projects simultaneously, or have some other solution to the problems that have cause this announcement?
Kneedown said:How would it be a better service for people down the line? Do you believe that Sheffield passengers will all go HS2 and that MML trains will terminate at Chesterfield? The best they can hope for is a few extra seats made available by those willing to pay the extra to travel HS2.
If HS2 tickets are significantly more than MML tickets it will defy the entire point of the project and make it a massive failure, so its funding system will be setup to ensure this doesn't happen. Has there been any annoucements that imply otherwise? If no, its reasonable to assume that London-Sheffield passengers will be a small fraction of their current numbers after HS2 completion.
If HS2 tickets are significantly more than MML tickets it will defy the entire point of the project and make it a massive failure, so its funding system will be setup to ensure this doesn't happen. Has there been any annoucements that imply otherwise? If no, its reasonable to assume that London-Sheffield passengers will be a small fraction of their current numbers after HS2 completion.
As regards HS2 fare structure, I'm not aware of any official announcements, but it's reasonable to assume that the investors will want to recoup money fairly quickly charging a higher fare for the premium service.
The 222s can continue on the Midland Main Line and there is no obvious other place to use them anyway. The issue is the relatively few services that are worked by HSTs today, which were planned to be scrapped by 2020 so weren't planned to be modified to meet accessibility rules.
The most likely outcome for these services in the short term is refurbishment of the existing HSTs or similar ones cascaded from another route. The only need to replace 222s with HSTs is if growth in passenger numbers means that some 222 services need lengthening and the existing fleet can't then cover all the services it does now. This would only happen to a few services, and is less likely if the Corby electrification goes ahead as that releases (at a guess) two or three four- or five-car 222s.
Do those complaining about deferment of MML electrification propose that the GWML should be deferred instead, or believe we have the resources to undertake both projects simultaneously, or have some other solution to the problems that have cause this announcement?
You appear to have linked to a different document, however, try page 67, last but one row, final column.
"www.railwaysarchive.co.uk/docsummary.php?docID=2095"
How would it be a better service for people down the line? Do you believe that Sheffield passengers will all go HS2 and that MML trains will terminate at Chesterfield? The best they can hope for is a few extra seats made available by those willing to pay the extra to travel HS2.
As regards Toton, you are falling into the trap of assuming that peak flow in the area only flows into the cities. Quite the opposite, it goes both ways as I well know from when I used to do a Derby-Toton, then a Derby-Nottingham commute. Probably because the two cities are fairly close together. Not everyone lives to the West of Nottingham or the East of Derby either.
I obviously have a very different viewpoint to yours. I have tried to answer your questions and counter your points in a respectful manner. I would appreciate it if you didn't refer to my views as "Nonsense". As I mentioned above, I am a Railway Professional with many years of experience in the industry, and while I make no claim to be an expert in all fields, I do have a good knowledge of the railways in the East Midlands and what makes them tick, and also what would make them tick louder.
This is the second time electrification has been denied to the MML. The first time the wires didn't make it past Bedford. Years of underinvestment in the region have taken their toll and when cracks appear they are merely papered over at best. You will forgive the people of the area, myself included, for actually caring and being short changed yet again.
That is all.
Same here, time for the pub - I'm on holiday in South Wales![]()
Electrification was due to bring further acceleration to Midland services, particularly through to Sheffield. The present HSTs cannot cannot maintain 222 timings on the line, so presumably neither could any cast-off HSTs drafted in from other lines.
And yes, I do think the GW project should have been the one to be "paused", despite the egg-on-face for the Dft over rolling stock, because that is the project that appears to have run completely out of control, both on time-scale and on costs. It needs to be "paused" and very carefully re-assessed and re-programmed before being allowed to start up again.
And, as has been pointed out in this thread already, the financial case for the Midland was always better than that for the GW. The only significant add-on to the Midland has been the decision that an upgrade of the OLE from London to Bedford is needed, whereas the GW seems to be gaining extra costs pretty well with every blink of an eye.
If the GWML electrification has massive problems, why if it was stopped would the MML be any better? Surely it would have the same problems, and the end result of getting ANY mainline railway electrified would be delayed several years as the MML is starting from virtually the beginning.
I don't think its purely financial, but ultimately all project issues will have financial consequences and can cause overspends. So rescheduling the overall programme simplifies the project management and reduces risk to each element, as well as deferring some of the spend.The problem isn't GW vs MML vs TP electrification, it's the whole CP5 budget for NR, rumoured to be heading for an overspend of more than 10%.
Do you think that most projects which have not got beyond grip3 will cut
Are schemes like east west rail one portishead dead in the water.
If resignalling of the ecml is abandoned what does that mean for class 800 trains as not all the ecml ones will be required
Resignalling is a huge issue, it's been a problem since Railtrack days and NR have bet the ranch on ERTMS delivering capacity increases. Whether it actually will, and what their plan B is if it's canned, I doubt anyone knows.
It only took five days. On Saturday 20 June, Sir Peter Hendy was approached to be the new chair of Network Rail. By 5pm on Wednesday he had accepted, and less than 24 hours later ministers were publicly admitting the depth of the crisis in the railways, scrapping pledges of major upgrades and announcing the new faces being parachuted in to run the system.
The speed of Hendy’s move, after almost a decade as London’s transport commissioner, underlines the government’s desperation to get to grips with Network Rail – and left him as surprised as anyone. “No one guessed – in fact, not even I guessed it was going to happen.
Hendy, unexpectedly, was leaving the London role he had made his own. Now, he claims: “I’m adjusted to it, because the truth is the day you say you’re going, everything starts happening around you. You might as well go – there’s no point in hanging around for a farewell party.”
In terms of new infrastructure on the ground, we got very little post-97 compared to before it. Look at the electrification, masses of station (re)openings, Light rail projects and so on that were funded and started/completed in the 80s and early 90s compared to after it.
Some of that may be down to privatisation and the inflated costs of actually doing anything (and they told us that it would make the railway more efficient...:roll![]()