• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Network Rail Timetable

Status
Not open for further replies.

D6975

Established Member
Joined
26 Nov 2009
Messages
3,049
Location
Bristol
The Network Rail site is still showing the 'old' national timetable which expires in a couple of weeks. By now the 'future' timetable is normally available. Is this delayed, or am I just not finding the right page on the website?

Most TOCs are now displaying the new timetables on their sites.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D6975

Established Member
Joined
26 Nov 2009
Messages
3,049
Location
Bristol
Thanks for that, nice to know I'm not going completely senile. I was sure I'd searched every possible page...
 

IanD

Established Member
Joined
18 Sep 2011
Messages
2,783
Location
Newport Pagnell
It's available now but just billed as 'Complete Timetable' and also says it's valid 11/12/2011 to 13/05/2012. I thought it was supposed to last until 12/2012.
--- old post above --- --- new post below ---

Well, it's sort of available in multiple files with sections missing.
 
Last edited:

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,818
Location
Epsom
I bought the GBTT book in London today; it too is dated until 13th May 2012, but rather strangely carries a note near the front saying that due to the Olympics the Scotrail timetable will be valid through to 8th December 2012...

So basically it looks like the timetable department think that everything will change again in May except for the bit furthest away from the Olympics, which will be valid all year because of the Olympics.:roll:
 
Last edited:

moonrakerz

Member
Joined
10 Feb 2009
Messages
870
It's available now but just billed as 'Complete Timetable' and also says it's valid 11/12/2011 to 13/05/2012. I thought it was supposed to last until 12/2012.

It says this at the beginning - clear as mud !!

"Valid from Sunday 11 December 2011 until Saturday 13 May 2012
This download is provided as a draft of the Forthcoming Timetable.
Other tables may be subject to change.
The next update to this document will be according to any amendments
received."
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,914
Location
Mold, Clwyd
It says this at the beginning - clear as mud !!

"Valid from Sunday 11 December 2011 until Saturday 13 May 2012
This download is provided as a draft of the Forthcoming Timetable.
Other tables may be subject to change.
The next update to this document will be according to any amendments
received."

This is actually the same dodgy text as in last year's edition.
Dates changed of course, but still Dec-May not Dec-Dec.

Had to save it as multiple pdf files.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,818
Location
Epsom
What about Hampden Park?

I didn't realise there were some Olympic events taking place outside the London / South Coast area! ( Blame the media coverage for that; it only ever talks about London and Weymouth and the anti cycle race protests from residents around Box Hill. )
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
Oh believe me, we've got it here too (the Ricoh Arena is hosting some of the football for some reason—evidently that wasn't enough incentive to get the NuCKLe rail project going).
 

lyndhurst25

Established Member
Joined
26 Nov 2010
Messages
1,589
Anyone able to get the full timetable from the .pdf link on the Network Rail website?

http://www.networkrail.co.uk/aspx/3828.aspx followed by:
http://www.networkrail.co.uk/browse documents/eNRT/Dec11/CompleteTimetable.pdf

All I get is a one page document entitled 'Important Information'.

Huh?

Me too. Are you using Preview on a Mac to view it? It seems that Network Rail have produced this latest timetable as a PDF "package" instead of a normal PDF file. I have had to unwillingly download and install Adobe's rubbish Reader software to view the timetable. Preview and Skim don't seem to be able to read it.
 

bnm

Established Member
Joined
12 Oct 2009
Messages
4,992
Me too. Are you using Preview on a Mac to view it?

A Mac? Me? Never!!! They are the Devil's work! PC all the way.

I have all the latest Adobe bells and whistles (I think?), but still only get that one page when I click on the 'Current Timetable' link.
 

flymo

Established Member
Joined
22 May 2007
Messages
1,552
Location
Geordie back from exile.
I'm using Adobe X reader at the moment on the work PC and it is all there just laid out a bit different from last years. I just scroll down through the preview pane on the left to the table I want and click to view that table.

I quite like the way it is laid out now, a bit easier to navigate.
 
Status
Not open for further replies.

Top