High output ballast cleaner
The 800 metre, 3,200 tonne High Output Ballast Cleaner works on the tracks’ ballast foundation. The huge yellow machine is slashing work times and increasing productivity. Around 600 hundred yards of track can be ballast cleaned in a typical midweek eight-hour night shift and around 1,400 yards in 16 hours at weekends.
While working, the High Output Ballast Cleaning System works at around a quarter of a mile an hour, undertaking the following processes continuously:


  • Excavating ballast from beneath the track, while holding the track in position

  • Passing the excavated material through large vibrating sieves

  • Removing ‘fines’ to specialist wagons in the train

  • Returning the larger pieces of ballast back to the track

  • Adding new ballast from wagons within the train to make up for the ‘fines’ removed
Some detail shots here
 

P156KWJ

Established Member
Joined
26 Nov 2007
Messages
4,226
Location
Nottinghamshire
High output ballast cleaner
The 800 metre, 3,200 tonne High Output Ballast Cleaner works on the tracks’ ballast foundation. The huge yellow machine is slashing work times and increasing productivity. Around 600 hundred yards of track can be ballast cleaned in a typical midweek eight-hour night shift and around 1,400 yards in 16 hours at weekends.
While working, the High Output Ballast Cleaning System works at around a quarter of a mile an hour, undertaking the following processes continuously:


  • Excavating ballast from beneath the track, while holding the track in position

  • Passing the excavated material through large vibrating sieves

  • Removing ‘fines’ to specialist wagons in the train

  • Returning the larger pieces of ballast back to the track

  • Adding new ballast from wagons within the train to make up for the ‘fines’ removed
Some detail shots here


Thanks for the info Dennis :)

Does anyone happen to know where it was heading? It was on the Down line of the Nottingham-Grantham past Netherfield about 1715 daily Mon-Fri.
 

adamp

Member
Joined
5 Oct 2007
Messages
694
Location
Manchester
Wow, Network Rail really do have some interesting pieces of machinery!!
Always wondered what they did.
(Y)
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
I'd be more interested in finding out where these typical 8 hour mid week night shifts occur!! We are lucky to get 3 hours possession a night round here!!
 

Z12XE

Member
Joined
30 Sep 2005
Messages
876
Sounds like the GEML

3 Hour planned posession, 5 hours over run..........!
 

Turbostar

Member
Joined
15 Aug 2006
Messages
1,039
Location
Plymouth, Devon
IIRC I think there's 2 of these beasts, 1 is based down here at Fairwater Yard in Taunton, the other I think is based somewhere around Rugby.
 

jacknottm

Member
Joined
8 Aug 2005
Messages
259
Location
Nottingham
Thanks for the info Dennis :)

Does anyone happen to know where it was heading? It was on the Down line of the Nottingham-Grantham past Netherfield about 1715 daily Mon-Fri.


It was off to stoke tunnel near grantham. Have no idea why but i think there was a possesion on the slow lines after a certain time in the evening.

Jack
 

will1337

Member
Joined
5 Feb 2008
Messages
613
Location
Laaandaaan
UK railway length 12,400 miles (2006) at 5 miles a week between 2 of them would take about 47 years to clean. There must be quite a few of them or similar machines?
 

Dennis

Established Member
Joined
8 Aug 2005
Messages
2,676
Location
Trowbridge
UK railway length 12,400 miles (2006) at 5 miles a week between 2 of them would take about 47 years to clean. There must be quite a few of them or similar machines?

There are also smaller medium output ballast cleaners, like this one and also older Plasser and Theurer RM75s.
 

Turbostar

Member
Joined
15 Aug 2006
Messages
1,039
Location
Plymouth, Devon
UK railway length 12,400 miles (2006) at 5 miles a week between 2 of them would take about 47 years to clean. There must be quite a few of them or similar machines?

I already said that. :roll:

IIRC I think there's 2 of these beasts, 1 is based down here at Fairwater Yard in Taunton, the other I think is based somewhere around Rugby.
 