Network Rail Puntuality Figures

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Flamingo

Established Member
Joined
26 Apr 2010
Messages
6,806
First Great Western HSS services bottom of the league again....

89% over the past 12 months, not bad if you look at the weather disruption we experienced over the period. Cast your mind back past July...
 

chuckles1066

Member
Joined
24 Nov 2010
Messages
361
Am I alone in believing that punctuality is secondary to reliability?

I've posted here previously; I don't mind my train rolling in 3,4,5,6 minutes late as long as I can get on it.

Shortforming is the biggest issue that I experienced whilst using the railways?

Your mileage may vary depending on where you are, I guess.
 

1e10

Member
Joined
13 Jun 2013
Messages
815
Am I alone in believing that punctuality is secondary to reliability?

I've posted here previously; I don't mind my train rolling in 3,4,5,6 minutes late as long as I can get on it.

Shortforming is the biggest issue that I experienced whilst using the railways?

Your mileage may vary depending on where you are, I guess.

Nope, I'm with with on that one. FGW in my area sometimes cancel stops on services if it's running late and run it straight to its destination so that it arrives on-time. No good for passengers of course, good for the figures though.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,104
Location
Redcar
Though it's probably good for the other passengers on that train and the passengers who'll be on the next service that train will form as it will now leave on time...
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
On average
60% of delays attributed to NR of which 30% are caused by external factors
20% of delays are external factors
20% of delays down to Toc in question

For Virgin its lower:

During period 5 Network Rail was directly responsible for 50% of delays to Virgin trains with a further 20% down to external factors (such as fatalities). Virgin itself was responsible for 16% of delays with other operators responsible for 14%

Im impressed Virgin, East Coast, TPE etc have the performance they do considering journey length, naturally they rely on some recovery time being built in. Look at Merseyrail, average service length something like just an hour but only 73.0% Right time punctuality, Virgin and East Coast have service lengths of many hours traveling much greater distances and exposing them to a much greater risk of delay, but not much lower ratio of less than a minute late.


Edit: I would love to see a ratio of delay minutes to km travelled, that could be very telling for directly comparing tocs.
 
Last edited:

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,305
Nope, I'm with with on that one. FGW in my area sometimes cancel stops on services if it's running late and run it straight to its destination so that it arrives on-time. No good for passengers of course, good for the figures though.

Not true - if any stops are cancelled it will still count as a failure for the purposes of punctuality figures, regardless of the actual arrival time.
 

Muzer

Established Member
Joined
3 Feb 2012
Messages
2,784
Edit: I would love to see a ratio of delay minutes to km travelled, that could be very telling for directly comparing tocs.

That would be an interesting statistic - especially if it were done in a fine-grained manner, ie for each train is delayed, add delay minutes/distance of that train's journey.
--- old post above --- --- new post below ---
Nope, I'm with with on that one. FGW in my area sometimes cancel stops on services if it's running late and run it straight to its destination so that it arrives on-time. No good for passengers of course, good for the figures though.
What greatkingrat said is correct - this is done solely to ensure that future services that require that train/crew aren't delayed, and therefore is best for passengers overall so that the service won't be horribly broken for the rest of the day.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,188
Location
0035
On average
60% of delays attributed to NR of which 30% are caused by external factors
20% of delays are external factors
20% of delays down to Toc in question
How many 'external' factors however would have been preventable or reduced in impact for minimal effort on the part of the rail industry. Further, I think that incident response is a key measure which the industry should be measured against, rather than just performance and reliability.

Unlike the newspapers recently I'm not one to express outrage at the difference in stats between a train being 59 Sec late and 4 Min 59 Sec late.
 

chuckles1066

Member
Joined
24 Nov 2010
Messages
361
Which is correct, PPM is measured at destination only.

Doesn't that lead to what I'd call "artificial padding" of timetables?

I guess the industry term would be something different.

I always remember back in the winter of 2010 that (from memory) the 17:24 service from Bath Spa was due into Bristol Temple Meads at 17:41......it was a HST (as I knew them) and the thing only ever took 9 minutes maximum.

I always wondered why FGW had decreed a journey time of 17 minutes?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Yes, any fail-to-stops automatically result in a PPM failure.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,842
A 'fail to stop' counts as a PPM failure AND a cancellation. Depending on the TOCs franchise agreement, every 'self caused' cancellation has a financial implication. In extremis, too many cancellations may lead to default on the franchise. Hence a TOC on a bad run will be reluctant to cancel trains (including FTS) even if it is the right thing to do for the situation on the day.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
I love the way we're presented with 2 different ways of expressing the same thing:

Network Rail said:
  • During period 5 Network Rail was directly responsible for 50% of delays to Virgin trains with a further 20% down to external factors (such as fatalities). Virgin itself was responsible for 16% of delays with other operators responsible for 14%
  • Delays attributable to Network Rail (this includes external factors such as fatalities which made up around a quarter of these delays) accounted for 69% of delays to East Coast services during the period

http://www.networkrail.co.uk/about/performance/

So for Virgin we're told:

Network Rail 50%
External 20%

But for East Coast we're told:

Network Rail 69% (including external factors)

Think of someone glancing at that data, and draw your own conclusion!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,703
Doesn't that lead to what I'd call "artificial padding" of timetables?

I guess the industry term would be something different.

I always remember back in the winter of 2010 that (from memory) the 17:24 service from Bath Spa was due into Bristol Temple Meads at 17:41......it was a HST (as I knew them) and the thing only ever took 9 minutes maximum.

I always wondered why FGW had decreed a journey time of 17 minutes?

It will be a PTT differential at the destination, that is determined by the TOC and makes no difference to WTT times which is what I work to. It is a blag on their part but they are entitled to do it.
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
I love the way we're presented with 2 different ways of expressing the same thing:



http://www.networkrail.co.uk/about/performance/

So for Virgin we're told:

Network Rail 50%
External 20%

But for East Coast we're told:

Network Rail 69% (including external factors)

Think of someone glancing at that data, and draw your own conclusion!

Trying not to reference the famous Rumsfeld speach about known knowns and known unknowns.....

Your misinterpreting slightly, In the attributing of delays there are things that are outside NR's control but still attributed to them in delay calculation such as a lorry hitting a bridge or a lightning stike, and stuff outside their control which isnt attributed to them such as grease on the rails (subcontractors fault), kids throwing stuff at trains in depots (depot owners fault) or fires close to the line.

http://www.delayattributionboard.co...ion Guide Issue dated 16th September 2012.pdf


What the figures do indeed indicate is more infrastructure problems on the East Coast than the West Coast and possibly fewer incidents of other TOCs trains causing delay to East Coast on the ECML than to Virgin on the WCML.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,842
Trying not to reference the famous Rumsfeld speach about known knowns and known unknowns.....

Your misinterpreting slightly, In the attributing of delays there are things that are outside NR's control but still attributed to them in delay calculation such as a lorry hitting a bridge or a lightning stike, and stuff outside their control which isnt attributed to them such as grease on the rails (subcontractors fault), kids throwing stuff at trains in depots (depot owners fault) or fires close to the line.

Grease on the line and fires near the railway are both attributed to NR. Unless the grease or fire has come from a TOC / FOC.
 
Status
Not open for further replies.