I've always read that the Marston Vale is considered a rural line. But what are the other classifications that exist?

And secondly, since the Marston Vale is now part of EWR, does that upgrade the Marston Vale to a mainline?

And lastly, if any, which lines have changed category?

Thanks all.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,403
Location
Northampton
NR used to have a classification of Primary, Secondary, L&SE Commuter, Rural, Freight but in the latest planning documents appear to have abandoned it. The Old Dalby Test track would have been considered a private line and the Underground is nothing to do with NR. HS1 is shown as unclassified in the Kent map, as it is also not NR infrastructure.

You can still see it here form the 2016 Wessex Network Specification:
1689839863532.png
(have a look at https://www.networkrail.co.uk/running-the-railway/long-term-planning/)

Regarding your question on the Marston Vale, it appears these categories are not longer used so wouldn't really be a problem, but I would expect it to remain a 'Rural' line until the completion of the EWR upgrades for the Oxford-Bedford services, at which point it would rise to 'Secondary'.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,403
Location
Northampton
This is all subjective - there is no guide book that tells you this kind of thing.
Not quite - as I've demonstrated, NR did produce some level of classification about 8-10 years ago.
What difference does "status" make?
Very little, but it might feed into OP's sense that Bedford is being deliberately maligned by the powers that be.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,403
Location
Northampton
but for what purpose?
I'll be honest, I'm not quite sure. They seem to be some level of prioritisation for strategic purposes, but have been all but abandoned in subsequent years. When I worked for NR Strategic planning the categories were not mentioned.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,942
Location
Up the creek
One important point is the difference between passenger and freight-only lines. A freight-only line does not need facing point locks on points, can have shorter signal overlaps, does not need catch or trap point protection from sidings, etc. Subject to the usual weight and gauging restrictions, a freight train can run on a passenger line without further ado, but special measures need to be taken when a passenger train runs on a freight-only line.

This is as it was in my time and I doubt if the basic principles have changed much. However, I think that it is far more common nowadays to use equipment and designs to passenger standards on freight-only lines than it was.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
Doesn't line speed determine the maintenance regime for any particular route?
Things like frequency of track and structures inspections, tonnage carried, signalling standards, level crossing specifications, platform clearances etc.
There seem to be jumps in standards at 75, 90, 100 and 110mph, with a different set applying at 125mph.
HS1 (and HS2 in time) are different again (and are not part of NR).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,640
Lines will be more designated on Value of Service going forward, so the money spent on them day to day will be aligned to that.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,887
Location
Fenny Stratford
When I worked for NR Strategic planning the categories were not mentioned.
Agreed - it is like those stations codes you see on wiki. someone has taken ages to load them all up but they are pointless
Lines will be more designated on Value of Service going forward, so the money spent on them day to day will be aligned to that.
the dog that dare not bark!
 

Dunfanaghy Rd

Member
Joined
16 Sep 2019
Messages
466
Location
Alton, Hants
A freight-only line does not need facing point locks on points, can have shorter signal overlaps, does not need catch or trap point protection from sidings, etc.
OT I know, sorry:
I never could see the logic of that. I used to go to Fawley regularly. The points in the main line used to have a FPL when it had a passenger service, but it was long gone by my time there, and the ground frame altered. The locking stretcher was still there though. Presumably the various DG traffics (Crude Oil, Gas Oil, LPG, Bitumen) weren't a risk!
Pat
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
I brought it up as I have read a million times that the Bedford to Hitchin line was degraded from mainline to Branch line when the St Pancras stretch was introduced.

The Marston Vale line was threatened with closure many times in my youth days and folk talked about it like it's no great loss. I'd hope that would change with EWR. Sounds like what I've learnt today is that it's all meaningless now.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,403
Location
Northampton
I brought it up as I have read a million times that the Bedford to Hitchin line was degraded from mainline to Branch line when the St Pancras stretch was introduced.
This is very much a conceptualisation rather than a categorisation.
The Marston Vale line was threatened with closure many times in my youth days and folk talked about it like it's no great loss. I'd hope that would change with EWR. Sounds like what I've learnt today is that it's all meaningless now.
The Marston Vale will likely perk up with EWR, but there's no formal distinction between a 'Main line' and a 'branch line' in any meaningful sense. Note the map above - Southampton to Weymouth is shown as secondary, whereas by most common conception the 'South West Main Line' runs from London all the way to Weymouth.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
I brought it up as I have read a million times that the Bedford to Hitchin line was degraded from mainline to Branch line when the St Pancras stretch was introduced.
Surely that simply means that the principal passenger and freight services (ie to London) no longer used it?

Having much reduced traffic obviously has implications for how the line was treated by (eg) the Signal and Telegraph Dept, the Civil Engineer etc, but you can have a busy branch line (Exmouth comes to mind).
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,791
Location
West is best
One important point is the difference between passenger and freight-only lines. A freight-only line does not need facing point locks on points, can have shorter signal overlaps, does not need catch or trap point protection from sidings, etc. Subject to the usual weight and gauging restrictions, a freight train can run on a passenger line without further ado, but special measures need to be taken when a passenger train runs on a freight-only line.

This is as it was in my time and I doubt if the basic principles have changed much. However, I think that it is far more common nowadays to use equipment and designs to passenger standards on freight-only lines than it was.
Things have changed slightly.

But first a correction. On a freight only line, no signal overlaps are required.
On a passenger line, in certain circumstances, a reduced overlap may be allowed. Such as station areas where the line speed is low, and there are points/junctions close to the station.

Some freight lines are provided with signalling to passenger standard if the line may be used for passenger train diversions.

All new power operated points are now provided with a FPL as standard. Existing power operated points may also have been upgraded with a FPL. In most cases, this does not apply to existing mechanical points operated from a signal box or ground frame.

Indeed, some point equipment has to have a FPL as it is an integral part of the equipment. Such as RCPL (Rail Clamp Point Lock, or clamp lock for short).

In the past, trap and catch points were required because unfitted freight trains were permitted (trains that did not have a continuous vacuum or air brake). But now, the preference is to remove as many trap and catch points as possible (less maintenance, hence cheaper). So, you will find freight lines without trap and catch points.

Trap points are still used where there is a risk of a runaway wagon or locomotive joining a running line, such as at the exits of depots or sidings.

Doesn't line speed determine the maintenance regime for any particular route?
Things like frequency of track and structures inspections, tonnage carried, signalling standards, level crossing specifications, platform clearances etc.
There seem to be jumps in standards at 75, 90, 100 and 110mph, with a different set applying at 125mph.
HS1 (and HS2 in time) are different again (and are not part of NR).
Some inspection and maintenance is done at a defined frequency (number of times per year) regardless of the line speed or the traffic level. Signalling maintenance is a good example of this. The maintenance happens at the defined frequency even if only one train a month runs.

Network Rail does have a classification system. But I don’t know if they publish the details in a public area. For example, the GWML has a classification of level 2 between Paddington and Bristol T.M.. But beyond Bristol T.M., that same main line is classified as level 3, as it’s considered less important.
Passenger “branch” lines may be classified as level 4.
 

TSG

Member
Joined
10 Aug 2020
Messages
207
Location
Somewhere in the South of England
OT I know, sorry:
I never could see the logic of that. I used to go to Fawley regularly. The points in the main line used to have a FPL when it had a passenger service, but it was long gone by my time there, and the ground frame altered. The locking stretcher was still there though. Presumably the various DG traffics (Crude Oil, Gas Oil, LPG, Bitumen) weren't a risk!
Pat
Railway signalling is a slightly unusual area in that, for various reasons, some of the primary legislation is rather prescriptive. I believe FPL of some type is an absolute legal requirement for facing points on passenger lines, and elsewhere it isn't. Thus it is not necessarily the case that the risk was seen as lower when only petrochemicals were running.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
I guess currently out of use or whatever the actual wording is counts as a status in the SA.
 

station_road

Member
Joined
3 Mar 2021
Messages
337
Location
By the sea
There's the line to Etches park Sidings and depot that is immediately north of the station, and the connection to the Derby RTC (Railway Test Centre), which is functionally a depot, immediately south of the station.

Both are sidings and wouldn't be counted as 'test tracks' in the conventional sense as only slow-speed moves under line-of-sight are permitted.
There used to be a BR Research test track at Derby (running from Egginton Junction on the line to Stoke, to Mickleover - part of the old Great Northern line to Derby Friargate) but that closed in 1990 - the only remains of that are some very heavily overgrown sidings near Egginton Junction signalbox.

http://www.old-dalby.com/Mickleover.htm
 

matchmaker

Established Member
Joined
8 Mar 2009
Messages
1,872
Location
Central Scotland
One important point is the difference between passenger and freight-only lines. A freight-only line does not need facing point locks on points, can have shorter signal overlaps, does not need catch or trap point protection from sidings, etc. Subject to the usual weight and gauging restrictions, a freight train can run on a passenger line without further ado, but special measures need to be taken when a passenger train runs on a freight-only line.

This is as it was in my time and I doubt if the basic principles have changed much. However, I think that it is far more common nowadays to use equipment and designs to passenger standards on freight-only lines than it was.
Freight only lines were often permissive block. The Sectional Appendices actually showed if a goods line was signalled Absolute Block. One such example (long gone) was Fouldubs Junction to Swingbridge Junction, the so-called Orchardhall Avoiding line, which allowed the heavy freight traffic in and out of Grangemouth to bypass Falkirk.
 
Status