I don't know whether this is the right place for this topic, but here goes ... !
I've seen a lot of Network Rail Depots in various places around the UK, but never one which actually has a rail connection. Is this deliberate - and, if it is, does anyone know why?
I would have thought that they'd need a rail connection for delivery of equipment etc. They're all next to a line as well, so it surely wouldn't be too difficult to provide one.
Does anyone have any thoughts on this, please?
I was trying to work our what kind of depot the OP was referring to to but:
MDU Depots ( Maintenance Depots) such as York, Carlisle, Sheffield, Bedford etc are not generally rail connected. There is no need. The staff are based there and travel to work sites. Any materials are either bulk delivered by rail (sleepers, ballast, Rail) to site by train or roaded to an agreed point. These depots cover wide geographical areas and may have sub depots dotted around the place.
Materials Handling Depots - These are rail connected as they handle materials out of the work sites noted above. The trains will be loaded a these depots and run to worksites. They reprocess & recycle incoming waste from work sites. They are at Crewe, Westbury & Doncaster.
http://www.networkrailmediacentre.c...L-GREEN-MOVEMENT-BEGINS-IN-WESTBURY-14fb.aspx
The National Track Materials Recycling Centre at Whitemoor is obviously rail connected! It is massive and it does what it says on the tin!
http://www.networkrailmediacentre.c...ELPS-CUT-COST-OF-BRITAIN-S-RAILWAYS-17e7.aspx
Local Distribution Centres (LDC) are rail connected stockpiles of engineering materials. The bulk trains are formed, loaded and dispatched from here to various worksites. Examples are at Bescot, Kingmoor, Doncaster.
You have also got the High Out Put Depots which are the home of of the High Out Put machines. Examples are at Taunton & Willesden. These need to be rail connected for obvious reasons
There is also Holgate Works in York and the other Seasonal Treatment bases around the country, Stowmarket, Eastleigh, Tonbridge being examples, where RHTT are based and serviced.
I think the OP was referring to the maintenance units but i hope this helps!
--- old post above --- --- new post below ---
In general there is no need at all for NWR staff depots to be rail connected.
The only sites that do need to be are those were On Track machines are based out of such as Holbeck at Leeds.
Lots of these places are not NR operated. The machine operators lease or buy them to create an operations base. For example Jarvis have (had?) many sites around the UK for their machine fleet. NR tend to have a siding somewhere for overnight stabling while periodic maintenance is done at the operators chosen location.
Very little plant is actually owned by NWR most is hired in for a particular job.
At least until NR bought Hydrex - but it seems to be up for sale again
http://www.networkrail.co.uk/selling-NDS-Plant.aspx