Is there a revised opening date?
At least two postings on facebook this afternoon about the withdrawl of the Trent Barton 18 between Nottingham & Rylands. Replacement with a shuttle bus into Nottingham & connect to tram (& Indigo) presumably. Could definitely see that one coming.....
Do you mean into Beeston? If so how does it terminate there, as I believe buses can no longer turn round in the bus station?
Rylands to Stapleford makes some kind of sense, as I believe buses can no longer terminate at Beeston.
--- old post above --- --- new post below ---
Apparently successful test last night, in that the tram got all the way to the terminus and back.
http://www.nottinghampost.com/Tram-testing-goes-ahead-Beeston/story-26271717-detail/story.html
Rylands to Stapleford makes some kind of sense, as I believe buses can no longer terminate at Beeston.
A small set of pictures published by The University of Nottingham of testing of the tram taking place by its main campus:
https://www.facebook.com/media/set/?set=a.944504778926857.1073741928.153229431387733&type=1
Executive Chairman of NET concessionaire Tramlink Nottingham, Phil Hewitt, explained: “...It will give people a real sense of what to expect when services start running in the middle of the year”
September? I thought the original target date was last Christmas. Whats the delay been? Ive not followed Nottingham that closely.
September? I thought the original target date was last Christmas. Whats the delay been? Ive not followed Nottingham that closely.
I think the four-word 'management summary' is 'problem moving underground utilities'.
To expand, a lot of the delay seem to have been due to things like utility pipes and cables being in 'the wrong place' or undocumented, or fragile pipes falling apart when exposed. There have also been problems with concrete cracking apparently due to adding too much 'setting accelerant' (or whatever it's called).
Also the original estimate was probably over-optimistic.
Anyhow, at least the end's in sight now test trams have run to the end of both lines. The main works remaining as far as I can see are:
- finishing work on tram stops
- some remedial concreting
- some road/tram signals to be completed/activated
After that, further testing and route learning for all drivers, then a 'shadow service' (full service with no passengers) for a short period, then full public service.
Also, remember that September is just *my* best guess. I don't work on the project or have any inside info. It's conceivable it could be as early as (say) July...
From the snippets I heard I thought it was pretty much complete on time, narrowly missing the Christmas target but all the delays were in rectifying a myriad of construction issues, i.e. stuff like the concrete wasn't discovered until after Christmas and long after the initial delay announcement. Im just surprised its taken another 6 months to do the snagging.
Slightly stale news but there's been some further progress on the signalling:
http://www.thetram.net/latest-news/1/major-road-junction-completed/
Not mentioned is that in addition to the signals at the junction of Queens Road and University Boulevard the signals at the junction of Regent Street and Middle Street are also active.
This now means that only one set of signals (Humber Road/Middle Street/Fletcher Road junction) need to be activated (they already look ready to go) and then trams will be able to do daytime running to the central Beeston tram stop (at the bus station) - where they can turn back.
After that, the signals at the Devonshire Road/Chilwell Road junction will need completing before the trams can go any further for daytime running purposes. These signals didn't have any 'heads' on them a few days ago.
--- old post above --- --- new post below ---
Correction to the above, signals at the junction of Union Street/Middle Street are active, Regent Street/Middle Street junction signals still 'bagged'.
In the meantime the signals at the Humber Road junction have been activated. So still one set of signals to go before daytime running to Beeston is possible.
Full length daytime testing on line 2 (Clifton etc.) now in progress (started 7th May), line 3 (Beeston/Chilwell/Toton) daytime testing as far as Beeston centre (starting today).
http://www.thetram.net/latest-news/1/tram-tests-beeston/
http://www.thetram.net/latest-news/1/daytime-tests-underway-clifton/
--- old post above --- --- new post below ---
And following quickly from the above:
Major Milestone Reached
Daytime testing to the full extent of line 3 to start today:
http://www.thetram.net/latest-news/1/major-boost-for-tram/
The platform screens have been on for ages and have been showing what I assume is the timetabled service?