Even if it's done with a video camera at a high resolution and frequency, and watched in slow-mo after the fact?Sitting on a train, in the cab at 100mph, or even 75mph, lots of things could be / will be missed.
Even if it's done with a video camera at a high resolution and frequency, and watched in slow-mo after the fact?Sitting on a train, in the cab at 100mph, or even 75mph, lots of things could be / will be missed.
That maybe a bit late then, NR do have High Speed Track Recorders, that run on a cyclic basis, that pick up what the eye cannot see, but you cannot beat Mk 1 eyeballs looking at the track, fixings, ballast, cess, embankment, OHL / 3rd Rail as they walk.Even if it's done with a video camera at a high resolution and frequency, and watched in slow-mo after the fact?
The video is analysed by computers using pattern recognition and its works pretty well in identifying missing clips etc and along with the tarck measuring data identified dynamic issues very well. As a result patrolling frequencies were reduced after its introduction but the MkI eyeball still has its place.Even if it's done with a video camera at a high resolution and frequency, and watched in slow-mo after the fact?
And 2 helicoptersIn addition to the train drone video footage and hi resolution stills are being used as well.
And most has recently all been recently upgraded. I don't think most people realise quite how much non visual track geometry analysis also happens.The video is analysed by computers using pattern recognition and its works pretty well in identifying missing clips etc and along with the track measuring data identified dynamic issues very well. As a result patrolling frequencies were reduced after its introduction but the MkI eyeball still has its place.
Im not sure it can check security of bolts on joints/crossings although there is significantly less assets like that on the high category/speed routes and it ought to be easier to get patrolling blocks on rural lines.And 2 helicopters
And most has recently all been recently upgraded. I don't think most people realise quite how much non visual track geometry analysis also happens.
It would be interesting to know the stats on what is being picked up by patrolling and what by other technological approaches.
Investment in removing lots of higher maintenance legacy track types (e.g. jointed bullhead) might actually be cutting down on maintenance requirements.
Sitting on a train, in the cab at 100mph, or even 75mph, lots of things could be / will be missed.
They've learnt from Hatfield maintenance was internalised and that is why the railways are now far safer than under Railtrack.Surely, they can't have forgotten Hatfield already? I'm also concerned that (my perception) there seems to be more fatalities (Port Talbot & Surbition and near misses) than there used to be ? Is staff development and training being cut back also to save money? Also I thought everything was now brought in house ( everyone is NR) and no more sub contactors, subcontracting subcontractors - following one of the reviews ?
If you're trying to save serious money on internal payroll in an organisation that's the shape of NR, it has to come out of lower pay bands.
From that spreadsheet:
89% of NR staff are on salaries between £20k and £60k, representing 83% of the wages bill.
0.4% of NR staff are on salaries over £120k, representing somewhere around 1%-2% of the wages bill.
To save 1% of your payroll bill you can either lose more than half of your senior management. Or about 1% headcount from the bottom pay bands, often achievable without any redundancies by just slightly reducing recruitment. If you want to save any more than that 1% then it isn't feasible to take it just out of top pay bands.
Middle management is often a better place to look for cuts than senior leadership. (In practice you do both at the same time.)
And in most organisations, losing e.g. a third of middle management represents a decent saving.
NR look reasonably lean here already from that spreadsheet but I'd be surprised if the type of thing from the RMT press release was going on and management weren't also about to be hit by some kind of restructuring, even a modest one.
Yeah the working practice. We were told that in order for us to use it again, someone (A senior manager/engineer) had to put their name to it in writing to give us permission to carry on working that way. As you can assume, no-one would dare as they'd basically end up out of a job and possibly worse if an accident or death had happened on their 'watch'.The term or the working practice? From context I assume the latter.
Our union has been in further discussions with Network Rail (NR) after its Chief Executive, Andrew Haines, made comments suggesting changes are needed at the company once the pandemic is dealt with.
We’ve now been told by NR that they will full abide by the Rail Industry Recovery Group (RIRG) framework. This body has been tasked with addressing the challenges facing the rail industry in a the post-Covid era.
I represent you on the RIRG and I can assure you we won’t let NR or anyone else jump the gun on these discussions. We must all make sure the RIRG does what it says on the tin – secures a rail industry which recovers from the blight of the past year, with safety, jobs and passengers to the fore
Had an update from TSSA this morning indicates NR will now back off until Rail Industry Recovery Group report back
Don't worry. The news had the same questions from current employed signallers. As usual lack of clarity in management announcements.Thank you for your reply.
Just panicking on seeing news today.
Assuming we’re over the worst, there’s going to be so many Covid related enquiries soon, will we even remember who recommended what ?Had an update from TSSA this morning indicates NR will now back off until Rail Industry Recovery Group report back
Has anything concrete been proposed that actually exists to read or is it all scary conversations and rumours?
From what he tells me it is the problem regarding the inflated costs associated with any improvements that is crippling NR.
Thanks - what has been proposed for the Capital Delivery programme?
From a national standpoint, Network Rail have said this:Thank you - my nephew, a former NR apprentice has heard nothing concrete. He never says much about his job but it is some sort of maintenance training role based in Milton Keynes although he hardly ever goes there even before Covid. He (and his wife) are very very worried.
Andrew Haines said:Dear colleagues,
Many of you will have seen the message issued by the RMT to its members yesterday (18 March) - it raises genuine concerns that I know many of you will share.
The rail industry, and Network Rail, is facing the most serious crisis. Passenger numbers are through the floor and the subsidy being paid by government to keep us afloat is through the roof. We already know that this is not going to be fixed when we get past COVID. The shift to working from home for millions of people will continue to present enormous challenges; fares income from passengers is going to be billions of pounds lower for years to come. So we will have to make savings. The question is, can we work together to get through this crisis?
I know we share a genuine commitment to improve safety, and current systems of work need to be safer for everyone to go home safe every day. The Trades Unions have recognised, like us, that change needs to happen. A decision to stay as we are is untenable.
We want to work with colleagues to deliver a railway that is affordable and safe, and we have committed to working with the Trades Unions to do this. We intend to do our best to agree with the Trade Unions a way forward that will deliver employment security, improved conditions, a safer and sustainable railway.
Our next step is to talk to you and our unions about how we will make proposed changes. We are planning a special Business Council with union representatives on 24 March. In that meeting we will agree the best way forward and share our thinking with the national and area councils.
We are keen to set up any other arrangements to help us reach agreement with the unions such as a union summit and workstreams to find ways to agree and deliver the change.
The RMT messages this week include early thinking about possible solutions and are not formal plans. I want to reassure you that any proposed changes will be openly and honestly communicated and fully consulted, with every effort to reach agreement. We don't have all the answers or all the solutions yet. Our plan is to test ideas, talk with you and your Trades Union representatives and work out together how we respond to the safety and efficiency challenges we face. We will never make changes that make you less safe.
We want to involve you. We recognise this will be tough for every one of us and that we will need to build trust if we are going to make this work. I hope we can support each other to do this as it will be worth the effort.
Thanks,
Andrew
24th has been and gone...what were the results?
That means in two days time...There is a national meeting of the second level RMT Network Rail reps on Wednesday. It’s likely more information will come out after this.
Network Rail have agreed no further action until all discussed at the Joint Industry TaskforceI am aware of that. But the press release said there was going to be a special meeting on 24th March...I was asking what came of it.
Currently it appears nowhere near that bad, otherwise the likes of HS2 would’ve already been paused, pending yet another review.The 'green recovery' was, put simply, a lie designed to fob off the critics at the time and utterly typical of Johnson's short-term populist approach to everything. Meanwhile road spending continues to rise because that's the Tory way - keep the road lobby happy. The railways are entering a very dark time indeed.