Well an article in Railnews see post # 132
Eh Gareth I’ve been reading this thread from the start. I even replied to that post.

To be fair that article was based on supposition rather than fact. And I’ll stand by that comment.

Note the use of the words “could”, and “probably” - not exactly certain!!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,857
Well an article in Railnews see post # 132
That article (with comments from somebody who had a title that made me think he knew what he was talking about) and the fact that the maps published by DfT showed that they weren't going to bother clearing the Pembroke Dock line for IEP. Pepole (myself included) put two and two together and came up with the wrong answer.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
Still whatever the real situation DfT were not going run IEP down the Pembroke Dock branch if they had been left to their own devices. It's one of those small wins that sometimes occur due to local political lobbying.
 

allaction

Member
Joined
27 Sep 2015
Messages
166
1 January 2019 - Summer has arrived early in Tenby and we’re all set for our IET bullet trains to and from That London....
 