• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

My suggestions for GTR internal unit cascades

Status
Not open for further replies.

LUSOwner

Member
Joined
30 Dec 2019
Messages
55
Location
London
Just thinking...

  • Class 455s can go into storage etc and be replaced on metro routes by Class 707s from SWR (which in turn will be replaced by new class 701s), and Class 377s
  • Class 377s should stay as they remain the bulk of the franchise
  • Class 379s from GA can be used on East / West Coastway services (Seaford - Brighton - Barnham - Chichester) releasing the 313s for scrap
  • The Gatwick Express should be abolished - the paths go to extra Southern services (VIC - ECR - Gatwick??) and the 387/2s can be used on other Southern services - see below
  • The Uckfield line should be electrified (reducing the amount of diesel trains in London, as well as the overall use of third rail) and 387/2s can run to Uckfield.
  • The Eastbourne to Ashford line should be electrified and platforms should be lengthened to allow Class 458s to run along the line (SDO can be used for limited stop stations such as Doleham and Pevensey Bay)

Anyone else have any thoughts (particularly on GN or Thameslink) ?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
Just thinking...
Plenty of other threads on this stuff
  • Class 455s can go into storage etc and be replaced on metro routes by Class 707s from SWR (which in turn will be replaced by new class 701s), and Class 377s

The 455s operate on 8-car routes - 707s aren't going to act as direct replacements even if they become available.
  • Class 377s should stay as they remain the bulk of the franchise
  • Class 379s from GA can be used on East / West Coastway services (Seaford - Brighton - Barnham - Chichester) releasing the 313s for scrap

Why would you put 379s on the Coastway? 313s are likely to be replaced by backfilling the services by 377s if something else is done elsewhere. Putting expensive rolling stock on the Coastway isn't going to pay its way.
  • The Gatwick Express should be abolished - the paths go to extra Southern services (VIC - ECR - Gatwick??) and the 387/2s can be used on other Southern services - see below
  • The Uckfield line should be electrified (reducing the amount of diesel trains in London, as well as the overall use of third rail) and 387/2s can run to Uckfield.

It is unlikely that Gatwick Express will be abolished. While it might be desirable to electrify the Uckfield line, there is no reason to dedicate 387s to the line. Issues with electrifying the line have been the subject of threads elsewhere.
  • The Eastbourne to Ashford line should be electrified and platforms should be lengthened to allow Class 458s to run along the line (SDO can be used for limited stop stations such as Doleham and Pevensey Bay)

Trying to populate the Southern franchise with three new fleets of trains from other operators would stretch the ability of the operation to train all of the traincrew. There is no sensible reason to bring in 458s for this route. In the unlikely event that 30 379s were brought in to work on the coast, there would be enough to cover the operation all the way to Ashford.

Anyone else have any thoughts (particularly on GN or Thameslink) ?

Yes. Wait until the end of the management contract and see what happens then, taking into account changes to other fleets first. I know that this is the speculative ideas thread but it helps if the speculation has some grounding in terms of the number of units now, the number needed and realism about practical issues such as depot and training requirements.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,180
I wondered if there are 377s planning to convert to Battery EMU units?

In theory, some Class 377/3s will be converted as replacement for the Class 171s. Whether it happens is yet to be seen.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
In theory, some Class 377/3s will be converted as replacement for the Class 171s. Whether it happens is yet to be seen.

Tying it back to 707s, my understanding is that many (most?) 377/3s are used on metro services to form 10 car trains (3+3+4) so presuming the battery conversion went ahead, 707s could be used to replace them on the metro routes.
 
Status
Not open for further replies.

Top