Halish Railway
Established Member
Ok, here goes my thought out, and what I believe to be a sensible and realistic way to radically improve services for users of the Hallam line.
It involves:
- Building four new bay platforms at Leeds in the area circled to eliminate conflicts with TPE services and the limitations to train lengths caused by having two trains share platform 17 at the same time. It is likely however, that the existing platform 17 may have to close in order to build a walkway/bridge wide enough to reach these new platforms.
- Building one, if not two new bay platforms at Castleford.
- Increase linespeeds; Ideally (judging by watching cab rides) 100mph from Hunslet Station Jn to Wakefield Kirkgate, 60mph on all lines at Horbury Jn, 70mph for trains diverging at Methley Jn as well as further into Castleford and 50mph for trains diverging at Altofts Jn.
- Electrify from Leeds to Knottingley, Hare Park Jn and Wakefield Westgate. (I don’t see much point in electrifying Oakenshaw Jn to Pontefract Monkhill owing to the low frequency of trains along that line).
The aim of all this is to;
- Increase punctuality, capacity and pathing flexibility by removing the conflict with TPE services at Leeds.
- Also increase capacity by removing the ridiculous situation in which all services along the Hallam line have to be 2-coaches long to fit into platform 17.
- Cut journey times between Leeds and Sheffield to be more similar to those of XC services travelling via Wakefield Westgate.
- Introduce EMUs on services to Knottingley and electric hauled Freightliner trains.
- Create an electrified diversionary route between Leeds and Hare Park Jn.
I don’t see to many engineering challenges along the route asides from completely realigning the track at Normanton. Thankfully the distancing of the existing four-aspect signals for most of the way between Leeds and Wakefield Kirkgate (0.75 miles) is large enough for any passenger train to come to a stop from passing a preliminary caution at 100mph, so hopefully not much re-signaling would be required.
As for service patterns I would have;
- The existing pre-COVID half-hourly semi fast service between Leeds and Sheffield (and beyond) retimed to account for linespeed improvements and formed of three or four carriage 195s.
- Increase the frequency of the Leeds to Knottingley service to half-hourly, formed of three carriage 331s (Hey, why not have the occasional 333
).
- Increase the frequency of the all stations Sheffield to Leeds service to half-hourly, although have the second train per hour go non-stop from Normanton to Leeds and have the existing service eliminate the Woodlesford call. It must be noted that the second train per hour may have to start at Meadowhall or Barnsley if no paths are available into Sheffield.
- Extend the Huddersfield to Castleford service to Leeds, also calling at Woodlesford so that Woodlesford keeps its direct link to Normanton and Wakefield Kirkgate.
- In all, a net gain of three trains per hour into Leeds.
These services mean that Castleford would have 4tph to Leeds, and that Normanton, Woodlesford, Knottingley and Pontefract Monkhill would have 3tph to Leeds, including a non-stop train for Normanton. Note, 3tph from Knottingley and Pontefract Monkhill would be facilitated in combination with the existing hourly service via Wakefield Kirkgate.
What are your thoughts? Do you think that my ideas are as sensible as I believe they are? To what extent would the many users of the Hallam line on this forum welcome this idea if it was implemented?
It involves:
- Building four new bay platforms at Leeds in the area circled to eliminate conflicts with TPE services and the limitations to train lengths caused by having two trains share platform 17 at the same time. It is likely however, that the existing platform 17 may have to close in order to build a walkway/bridge wide enough to reach these new platforms.
- Building one, if not two new bay platforms at Castleford.
- Increase linespeeds; Ideally (judging by watching cab rides) 100mph from Hunslet Station Jn to Wakefield Kirkgate, 60mph on all lines at Horbury Jn, 70mph for trains diverging at Methley Jn as well as further into Castleford and 50mph for trains diverging at Altofts Jn.
- Electrify from Leeds to Knottingley, Hare Park Jn and Wakefield Westgate. (I don’t see much point in electrifying Oakenshaw Jn to Pontefract Monkhill owing to the low frequency of trains along that line).
The aim of all this is to;
- Increase punctuality, capacity and pathing flexibility by removing the conflict with TPE services at Leeds.
- Also increase capacity by removing the ridiculous situation in which all services along the Hallam line have to be 2-coaches long to fit into platform 17.
- Cut journey times between Leeds and Sheffield to be more similar to those of XC services travelling via Wakefield Westgate.
- Introduce EMUs on services to Knottingley and electric hauled Freightliner trains.
- Create an electrified diversionary route between Leeds and Hare Park Jn.
I don’t see to many engineering challenges along the route asides from completely realigning the track at Normanton. Thankfully the distancing of the existing four-aspect signals for most of the way between Leeds and Wakefield Kirkgate (0.75 miles) is large enough for any passenger train to come to a stop from passing a preliminary caution at 100mph, so hopefully not much re-signaling would be required.
As for service patterns I would have;
- The existing pre-COVID half-hourly semi fast service between Leeds and Sheffield (and beyond) retimed to account for linespeed improvements and formed of three or four carriage 195s.
- Increase the frequency of the Leeds to Knottingley service to half-hourly, formed of three carriage 331s (Hey, why not have the occasional 333
- Increase the frequency of the all stations Sheffield to Leeds service to half-hourly, although have the second train per hour go non-stop from Normanton to Leeds and have the existing service eliminate the Woodlesford call. It must be noted that the second train per hour may have to start at Meadowhall or Barnsley if no paths are available into Sheffield.
- Extend the Huddersfield to Castleford service to Leeds, also calling at Woodlesford so that Woodlesford keeps its direct link to Normanton and Wakefield Kirkgate.
- In all, a net gain of three trains per hour into Leeds.
These services mean that Castleford would have 4tph to Leeds, and that Normanton, Woodlesford, Knottingley and Pontefract Monkhill would have 3tph to Leeds, including a non-stop train for Normanton. Note, 3tph from Knottingley and Pontefract Monkhill would be facilitated in combination with the existing hourly service via Wakefield Kirkgate.
What are your thoughts? Do you think that my ideas are as sensible as I believe they are? To what extent would the many users of the Hallam line on this forum welcome this idea if it was implemented?
Attachments