315801
Member
- Joined
- 12 Jul 2022
- Messages
- 201
Its a pity that work could not be carried out on the 150/2 coaches from units that have been split for these ciaches to be added into 150/0 units to convert the 150/2 coaches into a centre coach like those built when 150001 & 150002 were constructed.
The idea behind this is that it would create full 3 coach 150s instead of having to divide units to have a coach added to them.
The work would require the cab ends to be converted in order to create a trailer coach with an engine like those in 150001 & 002 or the other way to create 3 coach 150s which possibly could be done to quite a few units as class 319s are withdrawn from service is to use the trailer coach that does not have the pantograph or creat hybrid 150s by adding pantograph coaches from the 319s into some of the 150s therefore allowing them to work on elecy, whether that could be done or not I do not know as I DO NOT work for the railway or at any depots.
The idea behind this is that it would create full 3 coach 150s instead of having to divide units to have a coach added to them.
The work would require the cab ends to be converted in order to create a trailer coach with an engine like those in 150001 & 002 or the other way to create 3 coach 150s which possibly could be done to quite a few units as class 319s are withdrawn from service is to use the trailer coach that does not have the pantograph or creat hybrid 150s by adding pantograph coaches from the 319s into some of the 150s therefore allowing them to work on elecy, whether that could be done or not I do not know as I DO NOT work for the railway or at any depots.
