ryan125hst
Established Member
As most of you will be aware, certain areas of the network are suffering from a lack of capacity, and there is also a large quantity of rolling stock that will need replacing within the next decade or so. As a result of this, I thought I would give few of my ideas on what could be done to increase capacity and replace rolling stock, so you could give your thoughts and discuss what you think will actually be done.
Ive got a few to post over the next few weeks, but to start with, Im going to post one that is a bit quicker to do and easier to understand: Southern.
Southern currently has the following fleet:
My idea for improvement:
Keep the Class 73 for use as a Thunderbird, and keep the class 171s for the services they are currently used on. Should the Oxted and Marchlink lines be electrified, they can be converted into class 170s (fitted with BSI couplers) and displaced to other Turbostar operators.
Retire the class 313s and either put them into storage, scrap them, or send them to First Capital Connect to strengthen their Moorgate service. The Class 377/3s can then return to the Coastway service- the routes that they were designed for, also meaning that the route gets its new trains with toilets back (I believe there were a lot of complaints when the 313s were introduced).
The class 456s are moving to South West Trains next year to strengthen 8-car services to 10-car. According to Wikipedia, the new class 377/6s are replacing the twenty six class 377s loaned to First Capital Connect as well as facilitating the transfer of the class 456s and also creating extra capacity. While I can see how 26 new trains can replace 26 trains going to FCC, I am a bit lost on the last two things: The 24 class 456s mean a loss of 48 carriages, yet there will only be 26 extra carriages arriving (compared to the 377s loaned to FCC). I dont quite understand how they 377/6 can also create additional capacity given the information above. Am I missing something?
Southern are also receiving 8 new dual voltage class 377/7s, presumably to add capacity (8 coach services instead of 4) to the South Croydon to Milton Keynes route, so that doesnt seem to be a problem.
Finally, I would order a fleet of 60 to 70 new class 377s (/8s maybe?) to replace the class 455s and the 377/3s that will return to Coastway services. These would be four coaches long but would lack first class and would contain mostly 2+3 seating for metro services. They would still contain two toilets, allowing them to operate on longer routes if necessary, either temporarily (services alterations/to cover for failed units or units undergoing maintenance), or permanently if first class seating was added. Of course, some of them could be five coaches if necessary.
Overall, this would give Southern the following fleet:
Im no expert with Southern and have only travelled with them twice (from London Victoria to East Croydon and back) so I dont know everything about their services and am likely to have missed some details that some of you will be able to correct.
Im also aware that the 26 class 377s that are on loan to First Capital Connect will eventually return, and that 29 four car class 387s have been ordered for Thamslink routes to allow the class 319s to be cascaded before the class 700s arrive. Assuming that the 387s will be very similar to the 377s, that could mean that Southern could be getting 55 trains in a few years time. This would mean that only a small number of extra units would need to be ordered (if the capacity was needed) to replace the class 455 fleet.
So, what do you think? Does this seem to be the likely plan for Southern?
Ive got a few to post over the next few weeks, but to start with, Im going to post one that is a bit quicker to do and easier to understand: Southern.
Southern currently has the following fleet:
- 1x Class 73- used as a Thunderbird locomotive
- 15x Class 171- used on the Oxted and Marchlink lines
- 19x Class 313- used on East and West Coastway services
- 64x Class 377/1- used on all 3rd rail routes
- 12x Class 377/2- used on South Croydon to Milton Keynes services
- 28x Class 377/3- used on London suburban services
- 75x Class 377/4- used on all 3rd rail routes
- 26x Class 377/6- used on London suburban services. (Some of these units are still on order/being delivered)
- 17x Class 442- used on Gatwick Express services, with a few extensions to Brighton during the morning and evening peak
- 46x Class 455- used on suburban services from London Victoria and London Bridge
- 24x Class 456- used on suburban services from London Victoria and London Bridge
My idea for improvement:
Keep the Class 73 for use as a Thunderbird, and keep the class 171s for the services they are currently used on. Should the Oxted and Marchlink lines be electrified, they can be converted into class 170s (fitted with BSI couplers) and displaced to other Turbostar operators.
Retire the class 313s and either put them into storage, scrap them, or send them to First Capital Connect to strengthen their Moorgate service. The Class 377/3s can then return to the Coastway service- the routes that they were designed for, also meaning that the route gets its new trains with toilets back (I believe there were a lot of complaints when the 313s were introduced).
The class 456s are moving to South West Trains next year to strengthen 8-car services to 10-car. According to Wikipedia, the new class 377/6s are replacing the twenty six class 377s loaned to First Capital Connect as well as facilitating the transfer of the class 456s and also creating extra capacity. While I can see how 26 new trains can replace 26 trains going to FCC, I am a bit lost on the last two things: The 24 class 456s mean a loss of 48 carriages, yet there will only be 26 extra carriages arriving (compared to the 377s loaned to FCC). I dont quite understand how they 377/6 can also create additional capacity given the information above. Am I missing something?
Southern are also receiving 8 new dual voltage class 377/7s, presumably to add capacity (8 coach services instead of 4) to the South Croydon to Milton Keynes route, so that doesnt seem to be a problem.
Finally, I would order a fleet of 60 to 70 new class 377s (/8s maybe?) to replace the class 455s and the 377/3s that will return to Coastway services. These would be four coaches long but would lack first class and would contain mostly 2+3 seating for metro services. They would still contain two toilets, allowing them to operate on longer routes if necessary, either temporarily (services alterations/to cover for failed units or units undergoing maintenance), or permanently if first class seating was added. Of course, some of them could be five coaches if necessary.
Overall, this would give Southern the following fleet:
- 1x Class 73- used as a Thunderbird locomotive
- 15x Class 171- used on the Oxted and Marchlink lines
- 64x Class 377/1- used on all 3rd rail routes
- 12x Class 377/2- used on South Croydon to Milton Keynes services
- 28x Class 377/3- used on Coastway services
- 75x Class 377/4- used on all 3rd rail routes
- 26x Class 377/6- used on London suburban services (Some of these units are still on order/being delivered)
- 8x Class 377/7s- used to add capacity on South Croydon to Milton Keynes services
- 70x Class 377/8s- used on London suburban (metro) services
- 17x Class 442- used on Gatwick Express services, with a few extensions to Brighton during the morning and evening peak
Im no expert with Southern and have only travelled with them twice (from London Victoria to East Croydon and back) so I dont know everything about their services and am likely to have missed some details that some of you will be able to correct.
Im also aware that the 26 class 377s that are on loan to First Capital Connect will eventually return, and that 29 four car class 387s have been ordered for Thamslink routes to allow the class 319s to be cascaded before the class 700s arrive. Assuming that the 387s will be very similar to the 377s, that could mean that Southern could be getting 55 trains in a few years time. This would mean that only a small number of extra units would need to be ordered (if the capacity was needed) to replace the class 455 fleet.
So, what do you think? Does this seem to be the likely plan for Southern?