ABB125
Established Member
As Birmingham has lots of motorways, I thought it might be time for a new Birmingham "ring-rail":
It would start at Stourbridge, following existing route as far as Stourbridge North Junction, before branching off to Round Oak. This route (3.5 miles) would be upgraded to mainline standard.
The mothballed line from Round Oak to Walsall (7.5 miles) would be reconnected and upgraded to mainline standard.
Then the freight only Walsall to Water Orton (11.5 miles) would be upgraded to mainline standard. This would then create a 22.5 mile "Birmingham avoiding line" for freight, and new passenger services.
The route could then be extended down to Kings Norton via Camp Hill (10 miles) to create a horseshoe shape.
Finally, a new build railway could be created between Kings Norton and Stourbridge, creating a full loop.
Given Network Rail's current costings, I would estimate the cost to be around £14 billion
. Adding electrification would bring the cost up to £36 billion
.
What do you think?
It would start at Stourbridge, following existing route as far as Stourbridge North Junction, before branching off to Round Oak. This route (3.5 miles) would be upgraded to mainline standard.
The mothballed line from Round Oak to Walsall (7.5 miles) would be reconnected and upgraded to mainline standard.
Then the freight only Walsall to Water Orton (11.5 miles) would be upgraded to mainline standard. This would then create a 22.5 mile "Birmingham avoiding line" for freight, and new passenger services.
The route could then be extended down to Kings Norton via Camp Hill (10 miles) to create a horseshoe shape.
Finally, a new build railway could be created between Kings Norton and Stourbridge, creating a full loop.
Given Network Rail's current costings, I would estimate the cost to be around £14 billion
What do you think?