The resulting spread in demand, plus higher capacity trains, would see peak fares drop.
Hear this optimistic talk all over the shop with this project which apparently is unlike any other railway project ever. The other phrase that is often uttered, just not in relation to this project, is about it being pointless to cart fresh air around?

Companies and government will want to expend the fewest resources for the maximum return. If you really have a glut of capacity then you can expect services to be culled, not run so you have a carriage to yourself.

As for prices, it is just as likely that they will be increased to make up for shortfalls since people paying the already silly prices are either those who don't care because it's going on expenses or those who have no choice.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
It'll be interesting to see what the pricing system is like, but I'd guess that the 0640 HS2 will be cheaper than the current 0640 Virgin (plus inflation), but the 0740 HS2 will be more expensive.

There are two ways that the existing services can be cheaper than HS2 trains:

- HS2 puts their fares up compared with the current fares whilst ICWC keeps theirs the same

OR

- HS2 keeps their fares the same compared with the current fares whilst ICWC lowers theirs

Given the extra capacity that will be provided by HS2 it is assumed that the latter would be what happens, as that is what the model used for justifying HS2 has assumed.

If the former happens (most people would pay up to an extra £20 if it meant that they could stay in bed for an extra hour) then depending on how much more is charged and that extra cost doesn't result in a drop in total income (i.e. very few people switching to the slower services) then all that does is make the CBR of HS2 better.

You also have to bear in mind that an 07:40 departure for a 09:00 start of a working day is fairly reasonable and so people may start to commute to London from Manchester, as although their train fares would be more their housing costs would be less.
--- old post above --- --- new post below ---
Hear this optimistic talk all over the shop with this project which apparently is unlike any other railway project ever. The other phrase that is often uttered, just not in relation to this project, is about it being pointless to cart fresh air around?

Companies and government will want to expend the fewest resources for the maximum return. If you really have a glut of capacity then you can expect services to be culled, not run so you have a carriage to yourself.

As for prices, it is just as likely that they will be increased to make up for shortfalls since people paying the already silly prices are either those who don't care because it's going on expenses or those who have no choice.

There is a fine line, reduce the number of services and less people will use them (i.e. the reverse of what XC found out when they brought in their Voyagers).

However, if passenger growth continues at 4% per year we'd be looking at double the number of passengers when HS2 opens as compared with now. Given that there has been little in the way of improvements over the whole network since the failure of the ICWC franchise yet passenger growth is still going up at that rate, I wouldn't be surprised if it kept going at that rate (or at least an average of that rate) as we start to see more improvements.

If we are looking at carrying at double the passengers at opening it wouldn't be surprising to see a few years after opening that passenger numbers have jumped due to the extra capacity and faster journey times.

I don't think fares will fall by much, even if they fall by (say) 5% and then stagnate for a few years before starting to increase again; in real terms that could be quite a difference.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,348
The only reason peak fares are very very high now is in attempt to force load spreading as a result of eveyone trying to take the same trains in the morning.

With HS2 this becomes less of a problem because peak time capacity is enormous and due to shorter journey times there are more viable trains to use.
The number of <10AM arrival seats will explode.
Even if they don't do the capacity maximising thing and run 400m unitary sets.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
Meaning that trains capable of 140mph don't have to travel at 140mph - the mainline network is littered with low speed limits.

According to another thread, apparently they can only run at more than 110mpg when there their tilt is enabled. As such they may not have such a speed differential.
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
According to another thread, apparently they can only run at more than 110mpg when there their tilt is enabled. As such they may not have such a speed differential.


That's pretty good economy ;)

110mph ? Presumably that's not network wide for the 221's
 

southern442

Established Member
Joined
20 May 2013
Messages
2,266
Location
Surrey
Meaning that trains capable of 140mph don't have to travel at 140mph - the mainline network is littered with low speed limits.

I think I see your point now, but unless we shorten the Pendolinos, it won't work - I doubt there is a single station that can hold a 9-car one, let alone the full thing.
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
I think I see your point now, but unless we shorten the Pendolinos, it won't work - I doubt there is a single station that can hold a 9-car one, let alone the full thing.


I'd suggest that the 390's are less likely to be modified/shortened than the newer AT300 fleets - the AT300 could well be still in production in the mid to late 2020's, so easier to order new driving cabs/passenger cars.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
I'd suggest that the 390's are less likely to be modified/shortened than the newer AT300 fleets - the AT300 could well be still in production in the mid to late 2020's, so easier to order new driving cabs/passenger cars.

AR300's may not need any more end coaches as they could be changed to all be (say) six coaches long rather than a mix if 5 and 9.

Personally I think that GW will require more middle coaches for during their next franchise, possiblely resulting in 10 coach units and more full length (9 and 5+5) trains running.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,715
Location
Scotland
I doubt there is a single station that can hold a 9-car one, let alone the full thing.
Being pedantic - pretty sure that both Perth and Inverness could (not sure about Stirling), but that wasn't the point you were making. :) Agree that if 390's find a home off the WCML it's unlikely to be the HML.
 

southern442

Established Member
Joined
20 May 2013
Messages
2,266
Location
Surrey
I'd suggest that the 390's are less likely to be modified/shortened than the newer AT300 fleets - the AT300 could well be still in production in the mid to late 2020's, so easier to order new driving cabs/passenger cars.

I would say it would be 10000000000000000000000000000000000000000000000 times more likely to see AT200's on the Highland Lines as they would be much better suited. Or at least cascaded units such as 380's or maybe even 170's (as a more short term solution) on there.
 

Haydn1971

Established Member
Joined
11 Dec 2012
Messages
2,101
Location
Sheffield
I would say it would be 10000000000000000000000000000000000000000000000 times more likely to see AT200's on the Highland Lines as they would be much better suited. Or at least cascaded units such as 380's or maybe even 170's (as a more short term solution) on there.


To be fair, I'm talking about cascades to routes other than ECML, MML, Chiltern, WCML - you are talking about the Highland line.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
I would say it would be 10000000000000000000000000000000000000000000000 times more likely to see AT200's on the Highland Lines as they would be much better suited. Or at least cascaded units such as 380's or maybe even 170's (as a more short term solution) on there.

170s are already a common sight on the HML, but are being replaced by 2+4/2+5 HSTs in 2018. The Scottish Government made a big thing of focusing on 'inter-city' feel for the line, so going back to having a suburban DMU/EMU design would almost certainly be unacceptable. What would be acceptable would be the mythical AC 444 with its end doors and 100mph top speed.
 