My idea for a WCML and MML Reliever line

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Lrd

Established Member
Joined
26 Jul 2010
Messages
3,018
I think the M1 might get in the way at some point...
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
I suspect there’s quite a few higher priority two track railways that need four tracks...
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,981
Location
Airedale
I rather think the M1 corridor was considered for HS2, and rejected early on for practical reasons.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
https://drive.google.com/open?id=1FlwJCxxEAq_4k_PxmInTINvRBck&usp=sharing

It is a four track relief line with stations at Luton & Dunstable Parkway and Newport Pagnell. Brent Cross is for EMT and Thameslink only.

What do you all think?
It's not a bad idea and quite well thought-out, but you could probably have a couple more stations, such as St Albans & Hemel Hempstead Parkway, Redbourn West, and Brixworth. And, heck, I wonder about Bulkington too, for the NWR services...
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
I rather think the M1 corridor was considered for HS2, and rejected early on for practical reasons.
Definitely was assessed and one of many potential HS2 routes declared to be unbuildable because of impact on existing built up areas.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Definitely was assessed and one of many potential HS2 routes declared to be unbuildable because of impact on existing built up areas.
Hmm. Surely it's a bit too-far east to have been an HS2 Birmingham route? I imagine they were probably set on an alignment through the Chilterns anyway.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Definitely was assessed and one of many potential HS2 routes declared to be unbuildable because of impact on existing built up areas.
I think it was also rejected as a result of the decision (for which I have never seen any justification) to design HST2 for 400kph instead of 300.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,701
Location
Hope Valley
On the basis that the construction of HS2 (on a different alignment) is already getting under way is the OP assuming that yet another four-track route from London to the West Midlands will be necessary in the foreseeable future?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,727
Location
Nottingham
I think it was also rejected as a result of the decision (for which I have never seen any justification) to design HST2 for 400kph instead of 300.
I don't think 400km/h will be permitted on HS2 anywhere in Greater London, and there are plenty of places further north where the speed will be lower because curves sufficiently gentle for 400km/h would have made the alignment much more difficult. Once this principle is applied the extra capital cost of 400km/h over 300km/h is very small and it strikes me as a sensible bit of future-proofing.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
On the contrary, so little of the final route will be operated at 400kph that it should have been designed throughout for 300, which is the European standard. This would also have permitted a more sensible route following the existing transport corridors, with much fewer objections. It would be half built by now.
 

London Trains

Established Member
Joined
9 Oct 2017
Messages
1,237
On the basis that the construction of HS2 (on a different alignment) is already getting under way is the OP assuming that yet another four-track route from London to the West Midlands will be necessary in the foreseeable future?

This and other improvements was meant to replace HS2, which I frankly think is a waste of money and they will charge fares triple the already expensive VT prices.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
This and other improvements was meant to replace HS2, which I frankly think is a waste of money and they will charge fares triple the already expensive VT prices.

As an alternative to HS2 it's unlikely to be that good.

Unless there's need for four tracks (i.e. freight, local trains and long distance trains) then chances are it would only need to be built as two tracks. As otherwise you'll be building twice as much track for no good reason. Even then, unless there's survivability traffic volume a central third, bidirectional, line would bring most of the benefits.

If you are going for for track, then you'd want to design for a high frequency metro service choose in (likely be Luton), a reasonably good frequency medium distance service to places a bit further out that skip several of the metro stations (probably to Northampton) and then some longer distance services.

There's a fairly obvious kink just south of Northampton which would likely limit the speed of trains meaning that long distance services (i.e. 125mph plus) are unlikely to beat their existing journey times, especially given that and so wouldn't be a viable route. As such why bother with a very limited calling pattern given you have four tracks to work with?

Given that the line would pass through several urban areas, assuming a surface railway, then it's going to be very costly (politically, financially and in terms of the numbers of people opposed to the route) to even get the line to a point where it gets government approval.

In theory, such a line (possibly only two tracks and loops at some of the minor stations serving many places along the route) would be good. However the alignment would only really suite severing places along the route as it requires a diversion away from its alignment to get to any of the major cities in the UK.

Given that HS2 is being built, then such a line would now need to compliment it. Although it does serve local stations which HS2 doesn't, the problem is that these places are likely to see an improvement in services through the removal of long distance services being replaced by local services.

As such unless there's a larger than expected untapped market then such an existing line would be fighting for much of the same passengers and so wouldn't be viable for the time being.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,727
Location
Nottingham
On the contrary, so little of the final route will be operated at 400kph that it should have been designed throughout for 300, which is the European standard. This would also have permitted a more sensible route following the existing transport corridors, with much fewer objections. It would be half built by now.
There's nothing to stop it being operated at 300km/h if that is what is decided nearer to opening date. If you have examples of where a lower speed would have saved costs on the alignment then please tell - I've already pointed out that the speed has been reduced where it was decided a full-speed alignment wasn't reasonable. The full-speed areas are generally straight or almost so, and introducing more curves would make the end-to-end route longer, therefore more costly.

The early studies looked at HS2 following existing transport corridors but as these tend to be through built-up areas it doesn't work on much of the route. The point has already been made about the extra cost and number of people affected if this happens. HS2 does follow existing corridors where appropriate, for example the GW/GC Joint out of London (though later decided to be more cost-effective to go underground), the Great Central between Aylesbury and Brackley, and much of the eastern leg is close to the M42/M1/M18.

Edit: It's not generally possible for a high speed line to be immediately alongside a motorway or existing railway, because the higher speed (whether 400km/h, 300km/h or even less) needs gentler curves which either bring the new away from the existing or mean the existing has to be re-aligned to fit. If they have to cross then a very highly skewed bridge is normally needed, which is much more expensive than crossing at a larger angle. And for the motorway option there would need to be an expensive dive-under or a slightly cheaper but more obtrusive flyover at each intersection. So a HS line "in" a transport corridor is generally at least 100m from the existing transport link, though it may be closer on long straights and in certain places on curves.
 
Last edited:

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
This and other improvements was meant to replace HS2, which I frankly think is a waste of money and they will charge fares triple the already expensive VT prices.

And your evidence for this claim is...

All that government has said is that they expect fares to be in line with current pricing structures on the national rail network. So walk-up fares at peak times will be expensive whereas as advance fares will be very much cheaper. Indeed the very length of the trains will mean so much capacity is available that it may well be possible to keep fares somewhat lower than you might expect.
 

hooverboy

On Moderation
Joined
12 Oct 2017
Messages
1,373
https://drive.google.com/open?id=1FlwJCxxEAq_4k_PxmInTINvRBck&usp=sharing

It is a four track relief line with stations at Luton & Dunstable Parkway and Newport Pagnell. Brent Cross is for EMT and Thameslink only.

What do you all think?

the london orbital railway would be better.
luton not a bad start point.
lets say(clockwise)
luton- luton airport-stevenage-bishops stortford-stansted airport-chelmsford-basildon-medway(thurrock)-maidstone-tunbridge wells-gatwick airport-guildford-woking-heathrow airport-high wycombe-aylesbury-luton.

..or double up the last bit with east west rail thru mkc first...no problem with footfall/profitability as there is three airports en route!, and a rather large shopping centre
 

gallafent

Member
Joined
23 Dec 2010
Messages
550
[…]300, which is the European standard.

No, it isn't. https://en.wikipedia.org/wiki/High-speed_rail_in_Europe#Country-specific provides a neat summary rebuttal of that :)

Many recent-ish (finished during the last decade, say, often started in the 1990s!) and planned lines are 350km/h. I'm not sure when the first 320km/h line opened, but it must be decades ago now, surely (consults wikipedia) yes, the second section of LGV Rhône-Alpes, opened in 1994, for example, is a 320km/h line. Some others are 250km/h. Some others have other maximum speeds. Italy plans to run Frecciarossa at 360km/h (or has this upgrade actually happened by now?), for example. Further afield, China and Russia generally aim at 400km/h. To aim below current state of the art for a line which is not to open until 2026, some parts well into the 2030s, would be rather an odd thing to do, when the marginal costs of speed upgrades (within reasonable bounds) are surely small compared to overall project cost for a green-field new line.
 