• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

My Idea for: 313s to Southeastern?

Status
Not open for further replies.

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
With the 313s going off-lease from Great Northern in coming months are they able to operate on Southeastern routes - perhaps 3 cars on branches?

Purely hypothetical I know and unlikely being a micro fleet but just wondering.

Even a few more Networker carriages going spare to lengthen Metro routes would be welcome. There's barely any 12-car services and quite a few 8. Areas like Lewisham continue to see massive growth in housing.

They may be old and most other franchise areas would turn their noses up but when the daily ride is a battered and tatty Networker without a refrub in 25 years then a 313 is not any worse.

Also, how many trains are freed up by the 2 tph Thameslink to Rainham starting in May and what services will they strengthen?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

317666

Established Member
Joined
4 Sep 2009
Messages
1,775
Location
East Anglia
As far as I'm aware, the GN 313s are limited to 30mph when running on third rail - I'm sure someone with more knowledge will be able to tell you why!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,265
As far as I'm aware, the GN 313s are limited to 30mph when running on third rail - I'm sure someone with more knowledge will be able to tell you why!
It’s probably a limitation of the DC part of the route and not the stock.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
No chance. Of all the stock coming off lease Class 313 and 314 are first in the queue for the scrap yard......
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,886
They have a speed limiter fitted. I'm sure it could be removed.
 

apk55

Member
Joined
7 Jul 2011
Messages
446
Location
Altrincham
A class 313 is practically identical to a 3 car 506/507 except for the addition of transformer rectifier on the center trailer car and some changeover switches. The speed limit on DC is a speed sensitive switch that kills power above 30MPH and can be easily removed. Performance on DC would be as the 506/507 units
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,296
It’s funny that when Connex briefly ran some 508s they actually gave them a half-decent return, making them more pleasant than Networkers...

They really didn't give them a half-decent refurb, just a change of seat covers with the original seats and an area for bikes. They may well have been kept clean inside for the 10 years or so that they ran but there was nothing special about the 508s on Connex / South Eastern and no way better than a Networker.

A non-standard fleet of 313s isn't the way forward for Sheerness, the Medway Valley and Bromley North which is presumably what the OP is thinking of. I'm sure that the locals wouldn't want to see PEP stock back.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,296
It would be miles better than the garbage Southeastern uses at the moment so more than happy to see it happen.

What?

If the Networkers are exterminated in the next franchise there will be people on here complaining that they haven't done a full 40 year stint.

I can't imagine any way in which a GN 313 (or even a Southern 313) could be considered better than a Networker other than they aren't the stock currently in use and it would add some variety.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
gotta remember the age of these units. There will be structural and corrosion issues with units this old which would make prolonging their life financially impractical. ..hence you notice most stock has a 25-35 year max lifespan
 

RichJF

Established Member
Joined
2 Nov 2012
Messages
1,200
Location
South London
You're probably better off transferring the 458s/707s to Southern Metro, moving 4 car 377s down to Coastway, then in turn moving the 377/3s & surplus 4 car 377s over to SE for their branch lines.
 

SEClass375

Member
Joined
16 Aug 2016
Messages
112
You're probably better off transferring the 458s/707s to Southern Metro, moving 4 car 377s down to Coastway, then in turn moving the 377/3s & surplus 4 car 377s over to SE for their branch lines.

That could free up some of the 465/9s on the Tunbridge Wells stoppers because you may have enough 375s to run as a 10 car formation (4+3+3) because if all the 377/3s get transferred, SE will have 38 3 car 375/377s.
How many 10 car formations are needed for the Tunbridge Wells stoppers?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,170
so they need to butcher them and use them on the island line if they are going for £1 each!

The whole point of Island Line (once again) is that mainline stock won't fit Ryde Tunnel.

I'll be very surprised if the next Kent franchise does receive further cascades for their existing routes. Aventras will be the order of the day for finally taking the metro routes to 12 car operation.
 
Status
Not open for further replies.

Top