I was caught up badly in the gas main stuff on the GWML a few weeks ago.
I just got round to submitting delay repay, with the tickets being Paddington - West Drayton, West Drayton - Didcot then Didcot - Newport. Travelled on EL between London and Reading then pick up a GWR.
GWR rejected it and have sent it to TfL rail. I've appealed, because the delay on EL was 7 minutes but 120+ on GWR side!
I did some research but how is this meant to work? I assume it is just their automated system rejecting it, but I'm curious what the actual rules are when multiple companies are involved like this and both have delays?
I just got round to submitting delay repay, with the tickets being Paddington - West Drayton, West Drayton - Didcot then Didcot - Newport. Travelled on EL between London and Reading then pick up a GWR.
GWR rejected it and have sent it to TfL rail. I've appealed, because the delay on EL was 7 minutes but 120+ on GWR side!
I did some research but how is this meant to work? I assume it is just their automated system rejecting it, but I'm curious what the actual rules are when multiple companies are involved like this and both have delays?