Apparently from the Croydon Advertiser, posted: January 09, 2016
http://www.croydonadvertiser.co.uk/t...ail/story.html shows
However it then goes on to say that because scheduled work couldn't be done (because of high winds) when another blockade was on a further opportunity will have to be sought, but heavens knows when that can be achieved as all 4 lines have to be closed...
http://www.croydonadvertiser.co.uk/t...ail/story.html shows
sounds to me as though something safety-critical didn't get done...All train lines between Croydon and Brighton to be closed after high winds delay bridge work
However it then goes on to say that because scheduled work couldn't be done (because of high winds) when another blockade was on a further opportunity will have to be sought, but heavens knows when that can be achieved as all 4 lines have to be closed...