TfL plan to add an extra 2tph on the Crystal Palace and Clapham Junction branches from 2018.
This would add bring the service between NXG and Sydenham on London Overground to 10tph and 6tph between Queens Road Peckham and Clapham Junction.
However I suspect this may mean the end of the current 4tph to New Cross which is lightly used.
http://www.southlondonpress.co.uk/a...ine=More trains planned for London Overground
This would add bring the service between NXG and Sydenham on London Overground to 10tph and 6tph between Queens Road Peckham and Clapham Junction.
However I suspect this may mean the end of the current 4tph to New Cross which is lightly used.
http://www.southlondonpress.co.uk/a...ine=More trains planned for London Overground
More trains planned for London Overground
Tuesday, 13 October 2015 By Kate Gould
PLANS to increase capacity on a busy commuter line have been welcomed by public transport campaigners.
Transport for London (TfL) wants to introduce two more London Overground trains per hour between Dalston Junction and Crystal Palace from 2018.
It would increase the frequency of the trains on the line at peak time from eight trains per hour to 10.
TfL also plans an extra two trains per hour on the line from Dalston Junction to Clapham Junction via Surrey Quays and Peckham Rye, from 2019.
The scheme to deliver a 25 per cent capacity increase on the line has been necessitated by the growth of passenger journeys on the former East London Line.
In 2014, London Overgrouned train services were increased from four to five carriages, to add 25 per cent more capacity.
However TfL says in a report to be discussed today (Friday) that demand is still growing.
In the report it says London Overground demand increased by 144 per cent between 2010/11 and 2014/15.
New services continued to be introduced during that time with the extension of London Overground services from Dalston Junction or Highbury and Islington to Clapham Junction in 2012 and an increase in frequency on the lines from 12 trains per hour (tph) to 16tph.
It says over the past four years London Overground demand has increased by 96 per cent compared with 27 per cent growth on London and South East rail services
The new service from will be introduced subject to the availability of routes being confirmed by Network Rail.
Lewisham councillor and train campaigner Lord Kennedy said: "It is good news that we are going to have more trains running on the London Overground service through South London.
"However, a proper long term co-ordinated plan needs to be put in place by TfL, Network Rail and the train operating companies to deliver rail services that properly meet the needs of residents and business."
Last edited: