Yes - take the ex SouthEastern 508s as an example, left to rot
It is only one of many factors, but an important factor is motivation.Hello, newbie so please be gentle!Browsing through a mid 80's article in Traction Magazine, im reminded how many loco hauled coaches there used to be on the services i used as a kid, usually 6-10 as a rule. Since taking up my 'Railway Enthusiast' role again & visiting the NRM, East Lancs to name a few I've endured being squashed on a Cross Country 4-car Voyager, & being squashed even further on a 2-car 158 from Piccadilly to Sheffield. I know its a Pandora's box but my question is......Does this fault lie with The Privatised Train Companies or British Rail's rundown stock at the time of Privatisation? (thus leaving the newly formed companies a mountain to climb!?) hmmmm :roll:
But they're not exactly versatile units. They were designed for shortish services and are 3rd rail only.
So where exactly would you have deployed them?
Bearing in mind offering 2 or 3 around doesn't work as you need drivers who are cleared to drive them.
Like it or not the TOCs have been progressively standardising the units they use which is far more cost efficient than having to train drivers to drive a certain unit once in a blue moon.
Hello, newbie so please be gentle!Browsing through a mid 80's article in Traction Magazine, im reminded how many loco hauled coaches there used to be on the services i used as a kid, usually 6-10 as a rule. Since taking up my 'Railway Enthusiast' role again & visiting the NRM, East Lancs to name a few ive endured being squashed on a Cross Country 4-car Voyager, & being squashed even further on a 2-car 158 from Piccadilly to Sheffield :cry:
I know its a Pandorra's box but my question is......Does this fault lie with The Privatised Train Companies or British Rail's rundown stock at the time of Privatisation? (thus leaving the newly formed companies a mountain to climb!?) hmmmm :roll:
it seems that (at least for leasing costs) LHCS is cheaper to rent than an equivelent length DMU. However Im not sure how this would be for the actual buying costs, but i imagine if LHCS was being snapped up at every oppotunity then ROSCOS would consider aquiring new stock (or even commisioning some form of BR/Modern combination stock.
Then again, Im forgetting we have a private system run by the DfT
Use Cl60s to displace the Cl66/67s freight workings.
Attach an AAR equipped DVT/stripped DBSO with a generator like the one that Chiltern just finished to a Cl66, fit through ETS cabling to the Cl66 (should fitting the Cl66 with an ETH tap be too expensive), and then use them to displace Cl67s/57s that are on the sleepers and drags to fit them to passenger workings.
Or just fit the DVT/DBSO/generic cab-fitted four wheel wagon with the generator to the Cl60......
I am thinking whats going to happen to the 9 trains ( Cl 317 )being given bach by the
Dutch when they take over our services!
Its not ideal, but you could use them on the Lymington branch... Stagecoach use a 158 on this electrified branch, yet only have single 153s for Derby - Stoke - Crewe. In terms of the "least bad" situation, I'd spend the money training SWT drivers to work 508s to give additional capacity further north.
Growing up in North Yorkshire in the 1970s, if a service was likely to be more busy they just coupled 1, 2 or even 3 DMUs together to form the train.
In 2011:
- if it's the 6.30 out of Scarborough to Manchester, which runs into peak commuter times at York and Leeds, it's a 3 car class 185 (I took this a few weeks back and it was standing Leeds-Manchester).
- if it's the last train of the night out of Scarborough on a freezing Tuesday in February, with 5 passengers, it's a 3 car class 185.
- if it's a blazing August Sunday afternoon out of Scarborough to York, with dozens of holiday travellers with lots of luggage, it's a 3 car class 185.
Which is of course, because EVERY service between Scarborough-York and beyond, regardless of the day or time of year, is a 3-car class 185.
Call me old-fashioned, but I think that's an absolutely crackers way to run a service.