Any thoughts on the potential for rail to return to Monmouth and the Wye Valley?

It would be great to link this part of the county with the railway to south London - Swansea mainline and to the north Herefordshire/Worcester - Birmingham lines.

I appreciate much of the old lines have been built over with roads or housing but surely a LRT style train could be made to be financially viable thus reducing residents need to travel by car to major towns/cities. A light rail style network adjacent to A roads could be a quick fire way of reducing the impact of new railway lines.
Any thoughts?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

higthomas

Established Member
Joined
27 Nov 2012
Messages
1,227
Utterly utterly unviable.
It'd end up costing billions for a town of 10,000.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,702
Location
Selby
Any thoughts on the potential for rail to return to Monmouth and the Wye Valley?

It would be great to link this part of the county with the railway to south London - Swansea mainline and to the north Herefordshire/Worcester - Birmingham lines.

I appreciate much of the old lines have been built over with roads or housing but surely a LRT style train could be made to be financially viable thus reducing residents need to travel by car to major towns/cities. A light rail style network adjacent to A roads could be a quick fire way of reducing the impact of new railway lines.
Any thoughts?
Not a chance that it would be anywhere close to viable.
It's a challenging route, even if you reuse the disused trackbed where it is available, and would need a number of structures such as bridges and tunnels reinstating or renovating.
It is a very winding alignment that would only be suitable for slow speeds, so would not offer any significant attraction over the current bus services.
The route south to Chepstow is the only one that is remotely plausible – the old line up to Ross and on to Gloucester would be cataclysmically expensive as well as untenably slow and circuitous.
The tranquility of the countryside and the amenity for walkers and cyclists of the old trackbed is of far more value to the area than a rail connection would be.

If there's money to spare then it could achieve a lot more benefit a lot quicker and for a tiny fraction of the cost by supercharging the bus network. At the moment there's roughly one bus an hour to Chepstow, buses every 2 hours to Ross, Newport and Abergavenny, and an infrequent service to Hereford. All of the buses use small or medium single-deckers, which doesn't suggest that there's anywhere near enough demand to warrant a rail service, let alone one that would be so expensive to build. (Part of the reason for that is that demand is spread relatively evenly across multiple directions – there is no one regional centre acting as the main draw).

If you're suggesting an LRT for an interurban service then that's basically a tacit admission that it won't attract enough passengers to be worthwhile.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,190
Location
Wilmslow
I've always thought the Wye Valley line would have been a good candidate for a preserved line - highly scenic and having the major attraction of Tintern Abbey. Closure came too early for the movement however - 1959 for passengers and 1964 for freight - which says something about the economics. It wasn't particularly user friendly either, with services running to the inconvenient Monmouth (Troy) and requiring a change for the slighly less inconvenient May Hill. Tintern Station was nowhere near the abbey either.
 

Doctor Fegg

Established Member
Joined
9 Nov 2010
Messages
2,135
Location
Charlbury
There's also a fairly dedicated NIMBY quotient in the valley, sadly - putting a cycleway on parts of the old trackbed has progressed glacially slowly (as in 20+ years and only a couple of small bits have been done) due to very noisy opposition.
 

sidney jones

New Member
Joined
14 Sep 2024
Messages
1
Location
Cardiff
Hi everyone.

Back in March 2024, gedwards made a post about the prospects of re-opening a railway to Monmouth. The reply made by stevieinselby prompted me to contribute my own thoughts to this matter. I will address each of the points he made in turn.

  1. Not a chance that it would be anywhere close to viable.
  2. It's a challenging route, even if you reuse the disused trackbed where it is available, and would need a number of structures such as bridges and tunnels reinstating or renovating.
  3. It is a very winding alignment that would only be suitable for slow speeds, so would not offer any significant attraction over the current bus services.
  4. The route south to Chepstow is the only one that is remotely plausible – the old line up to Ross and on to Gloucester would be cataclysmically expensive as well as untenably slow and circuitous.
  5. The tranquillity of the countryside and the amenity for walkers and cyclists of the old trackbed is of far more value to the area than a rail connection would be.
  6. If there's money to spare then it could achieve a lot more benefit a lot quicker and for a tiny fraction of the cost by supercharging the bus network. At the moment there's roughly one bus an hour to Chepstow, buses every 2 hours to Ross, Newport and Abergavenny, and an infrequent service to Hereford. All of the buses use small or medium single-deckers, which doesn't suggest that there's anywhere near enough demand to warrant a rail service, let alone one that would be so expensive to build. (Part of the reason for that is that demand is spread relatively evenly across multiple directions – there is no one regional centre acting as the main draw).
  7. If you're suggesting an LRT for an interurban service then that's basically a tacit admission that it won't attract enough passengers to be worthwhile.
So in response to his comments above, here is my response in turn.

1. Viability. If a railway is so unviable, why was it so necessary to construct a dual carriageway all the way from Newport, through Monmouth, on to Ross on Wye and beyond in the first place. Prior to the construction of the A449 and associated A40, the railway was apparently struggling to be cost effective, so where was the viability case study for constructing an even more vastly expensive dual carriage way along the very same route, just for a town with a small population. When it comes to cost and viability, the cost of the now abandoned M4 relief road, was quoted by the contractors at a cost of nearly £100 million per mile... Per mile! Building road infrastructure is literally like asking the public and the treasury to write a blank cheque without any accountability... Another example of these kinds of costs is the A465 heads of the valleys road which is so expensive, so time consuming and so over budget, no one will even tell the public how much has been spent on it, so far! Did someone, anyone for that matter, ever question the viability of the A465. The M4 already connects the East with West Wales, so why do we need another major road going to the same destination via Merthyr... It isn't that much bigger than Monmouth, so why is that "viable" given the "cataclysmic costs" of that ... Yet a railway apparently isn't viable... There are numerous other examples of very questionable cost effective road building all over the UK, but I will leave that there for the time being, other than to say, they have all been far more "cataclysmically expensive" than any railway could be.

As for saying "Not a chance", this is precisely the kind of attitude that makes getting a proper modern sustainable transport system so difficult to make happen, and any engineering challenges pale by comparison to such negative and dismissive thinking that's stuck in the very short sighted past of the Beeching Report. Beeching may not have had a crystal ball to the look into the future when it came to cutting running costs, but he had an extraordinary lack of vision when it came to appreciating that the future demand for good public transport was only ever going in one direction, and that is up and up! He also failed to have even the most elementary understanding of long term economic, social and environmental costs when it came to the transport of both the public and goods. The legacy of Beeching can be summed up excellently by this quote about scrapping HS2, "He may have known the cost of everything... But he failed to understand the true value of anything". This remains the case today, for example just the wages alone of one train driver versus the number of lorry drivers wages to transport the same amount of cargo, does not need a maths genius to appreciate which is the cheaper, let alone all the other associated costs. Someone once described the dismantling of the railways in the UK as "The road back to roads"... Backwards being the operative word as the UK is now stuck with an extremely expensive road network that has a near total monopoly on transport that can ironically be best described as a total train wreck for both the long term of the economy and the environment.

2. Yes, accepted, it is a challenging route and yes there are bridges that would need to be renovated or rebuilt and the same with trackbed in some places. Although none of these issues would be insurmountable and let's not forget or overlook the fact that with a lot of these old railways, that could be brought back, most of the costly major work shifting millions of tonnes of earth has already been done, which as road projects like the A465 in Wales proves to be the case in terms of what costs the most.

3 & 4. The Route. It would make the most sense to link Monmouth and potentially Ross on Wye with Raglan and Usk to get onto the main line at Pontypool for the easiest and most direct access to the cities of Newport and Cardiff, for the benefit of the most number of commuters, rather than just to the small town of Chepstow (and then onwards). This route south-west via Usk is by far a straighter alignment than is to be found between Chepstow and Monmouth, although the disadvantage is that it would have to be rebuilt along side the A449, although there seems to be plenty of space for it to do so. As to why such a public transport corridor scheme would be viable, consider that in the last few years, Ross on Wye, Monmouth, Raglan and Usk have all seen exploding populations and numbers of businesses, yet all of them remain in a railway infrastructure Sahara desert.

5. The railway is more value to walkers and cyclists. This has very mixed success at other locations. For example the cycle trackbed between Newport and Blaenavon has been mostly obliterated and is interrupted at numerous points making it impractical as a proper commuter cycle route. The same can be said for the route between Abergavenny and Brynmawr. The only relatively practical example of this in the vicinity is the cycle track around the Forest of Dean, although again there is a significant missing section due to private land ownership and it can hardly be of any use at all as a green form of transport to and from residential and retail areas, as it connects nothing to nothing. But its a good example of an old railway being used as a cycle route in tranquil setting if nothing else.

6. "Supercharging the bus network". This phrase is difficult to understand as to what it would be trying to achieve and more importantly, how it would be trying to achieve it. But more is understood by the following facts. Buses throughout wales, are extremely "slow and circuitous". This is only appreciated by people who actually use buses in Wales, rather than by people in offices who just stare at pretty multicoloured flat maps. For example, a bus from Cwmbran to Pontypool can take up to an hour to travel the 6 mile journey. A bus from Newport to Tredegar can take more than 4 hours to do the 22 mile journey. As for a bus from Monmouth to Newport which is some 30 miles (via Pontypool and Usk or via Chepstow, makes no real difference to the distance), it can take even longer. Bearing in mind of course these journey times are real world experiences, not based on meaningless bus timetables and are only one way!

Buses like this, supercharged or otherwise, are totally impractical as a mode of public transport for commuters and it is hardly surprising that such buses are only every two hours! It isn't because there is no demand for public transport, it is because they are far too slow and utterly useless to anyone, apart from a day out for the Mr Magoo appreciation society! One of the reasons buses in Wales are so slow is because of the geography and countless steep gradients along the whole road network. Another reason is that buses rarely achieve average speeds of more than 25mph and along some bus routes in Wales, there are bus stops every 250 yards. Buses also frequently stop for up to 10 minutes at a time due to numerous reasons, taking fares etc, etc, etc. The least said about several buses all stuck in the same line of traffic, the better. So, whatever is meant by "Supercharging the bus network", unless that means turning buses into things that literally fly or virtually turning them into trains with a complete road system dedicated only for them, it is unlikely to make any difference to the actual services provided by buses in the current configuration.

7. "It wouldn't attract enough passengers to be worthwhile". If this railway between Pontypool, Usk, Raglan, Monmouth and Ross on Wye had been retained and mothballed during the 1970's and brought back into service some time in 2000's, there would be absolutely no question about its viability today. This is evidenced by the success of the newly reinstated railway to Ebbw Vale, which has seen more than three times the numbers of passengers than was expected, with a population not much bigger than Monmouth. They nay sayers said it would never give any returns for the public purse, and just how wrong were they! Whilst the passenger numbers for a Monmouth railway connection may have been low during the 1960s and 1970s, likely passenger numbers today are considerably higher, because there are now far more people are living in those areas. This is similarly the case throughout most of the UK, for example the need for railway connections at places like Thornbury and Portishead in Somerset are nothing short of desperate and urgent and long overdue with the development of massive housing estates over the last 10 years.

For those that have read the whole of my response, thank you for taking the time to read it, I hope you have found it informative and thought provoking.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,969
Location
Airedale
Welcome to the forum

1. Viability. The lines closed in 1959, except for Pontypool Road to Monmouth, the one you suggest reopening, which closed in 1955. Unlike Ebbw Vale, the intermediate settlements are widely spaced and small.
I doubt that Ross is a viable commuter town for Newport, though I presume Monmouth is.
The M50/A40/A449 is a through route South Wales-Midlands, so not really relevant to the discussion (though useful to the area)
2. Social need. Also unlike Ebbw Vale, there has been no massive industrial decline with its legacy of plenty of housing but few jobs, meaning that people need to commute (I have lived and worked in a community like that, but without a railway - car-based commuting was the only option and TBH saved the village).
3. Practicality. Beyond Usk, you would be talking new build all the way to Monmouth.
Ebbw Vale was basically in place IIRC.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,488
Location
Powys
The A449/A40, Ross Spur, had little to no relationship to the local area, but was built to link, via the M50 with the Midlands and to provide a better and quicker road route avoiding crossing the Severn and having to by-pass Gloucester.

And trying to compare the environs of Ebbw Vale, Cwmbran, etc to that of the Forest of Dean is way out of proportion. Ignoring the fact that the areas are in totally different countries.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,602
Location
Dunham/Bowdon
If there's money to spare then it could achieve a lot more benefit a lot quicker and for a tiny fraction of the cost by supercharging the bus network. At the moment there's roughly one bus an hour to Chepstow, buses every 2 hours to Ross, Newport and Abergavenny, and an infrequent service to Hereford.
The bus network in Eastern Gwent (Monmouthshire) has recently been improved with increased frequencies and Sunday services on some routes, presumably with council/government subsidies. Most services are now operated by Newport Transport ( https://www.newportbus.co.uk/ ). Nick Maddy Coaches run service 34 Monmouth to Ross-on-Wye ( https://www.nickmaddycoaches.co.uk/ ). This is adequate for the dispersed rural population, and is far better than that provided in Eastern Cheshire. There is no need and no prospect of any rail re-openings in this rural area.
 
Last edited:

8H

Member
Joined
6 Jul 2013
Messages
259
Hi everyone.

Back in March 2024, gedwards made a post about the prospects of re-opening a railway to Monmouth. The reply made by stevieinselby prompted me to contribute my own thoughts to this matter. I will address each of the points he made in turn.

  1. Not a chance that it would be anywhere close to viable.
  2. It's a challenging route, even if you reuse the disused trackbed where it is available, and would need a number of structures such as bridges and tunnels reinstating or renovating.
  3. It is a very winding alignment that would only be suitable for slow speeds, so would not offer any significant attraction over the current bus services.
  4. The route south to Chepstow is the only one that is remotely plausible – the old line up to Ross and on to Gloucester would be cataclysmically expensive as well as untenably slow and circuitous.
  5. The tranquillity of the countryside and the amenity for walkers and cyclists of the old trackbed is of far more value to the area than a rail connection would be.
  6. If there's money to spare then it could achieve a lot more benefit a lot quicker and for a tiny fraction of the cost by supercharging the bus network. At the moment there's roughly one bus an hour to Chepstow, buses every 2 hours to Ross, Newport and Abergavenny, and an infrequent service to Hereford. All of the buses use small or medium single-deckers, which doesn't suggest that there's anywhere near enough demand to warrant a rail service, let alone one that would be so expensive to build. (Part of the reason for that is that demand is spread relatively evenly across multiple directions – there is no one regional centre acting as the main draw).
  7. If you're suggesting an LRT for an interurban service then that's basically a tacit admission that it won't attract enough passengers to be worthwhile.
So in response to his comments above, here is my response in turn.

1. Viability. If a railway is so unviable, why was it so necessary to construct a dual carriageway all the way from Newport, through Monmouth, on to Ross on Wye and beyond in the first place. Prior to the construction of the A449 and associated A40, the railway was apparently struggling to be cost effective, so where was the viability case study for constructing an even more vastly expensive dual carriage way along the very same route, just for a town with a small population. When it comes to cost and viability, the cost of the now abandoned M4 relief road, was quoted by the contractors at a cost of nearly £100 million per mile... Per mile! Building road infrastructure is literally like asking the public and the treasury to write a blank cheque without any accountability... Another example of these kinds of costs is the A465 heads of the valleys road which is so expensive, so time consuming and so over budget, no one will even tell the public how much has been spent on it, so far! Did someone, anyone for that matter, ever question the viability of the A465. The M4 already connects the East with West Wales, so why do we need another major road going to the same destination via Merthyr... It isn't that much bigger than Monmouth, so why is that "viable" given the "cataclysmic costs" of that ... Yet a railway apparently isn't viable... There are numerous other examples of very questionable cost effective road building all over the UK, but I will leave that there for the time being, other than to say, they have all been far more "cataclysmically expensive" than any railway could be.

As for saying "Not a chance", this is precisely the kind of attitude that makes getting a proper modern sustainable transport system so difficult to make happen, and any engineering challenges pale by comparison to such negative and dismissive thinking that's stuck in the very short sighted past of the Beeching Report. Beeching may not have had a crystal ball to the look into the future when it came to cutting running costs, but he had an extraordinary lack of vision when it came to appreciating that the future demand for good public transport was only ever going in one direction, and that is up and up! He also failed to have even the most elementary understanding of long term economic, social and environmental costs when it came to the transport of both the public and goods. The legacy of Beeching can be summed up excellently by this quote about scrapping HS2, "He may have known the cost of everything... But he failed to understand the true value of anything". This remains the case today, for example just the wages alone of one train driver versus the number of lorry drivers wages to transport the same amount of cargo, does not need a maths genius to appreciate which is the cheaper, let alone all the other associated costs. Someone once described the dismantling of the railways in the UK as "The road back to roads"... Backwards being the operative word as the UK is now stuck with an extremely expensive road network that has a near total monopoly on transport that can ironically be best described as a total train wreck for both the long term of the economy and the environment.

2. Yes, accepted, it is a challenging route and yes there are bridges that would need to be renovated or rebuilt and the same with trackbed in some places. Although none of these issues would be insurmountable and let's not forget or overlook the fact that with a lot of these old railways, that could be brought back, most of the costly major work shifting millions of tonnes of earth has already been done, which as road projects like the A465 in Wales proves to be the case in terms of what costs the most.

3 & 4. The Route. It would make the most sense to link Monmouth and potentially Ross on Wye with Raglan and Usk to get onto the main line at Pontypool for the easiest and most direct access to the cities of Newport and Cardiff, for the benefit of the most number of commuters, rather than just to the small town of Chepstow (and then onwards). This route south-west via Usk is by far a straighter alignment than is to be found between Chepstow and Monmouth, although the disadvantage is that it would have to be rebuilt along side the A449, although there seems to be plenty of space for it to do so. As to why such a public transport corridor scheme would be viable, consider that in the last few years, Ross on Wye, Monmouth, Raglan and Usk have all seen exploding populations and numbers of businesses, yet all of them remain in a railway infrastructure Sahara desert.

5. The railway is more value to walkers and cyclists. This has very mixed success at other locations. For example the cycle trackbed between Newport and Blaenavon has been mostly obliterated and is interrupted at numerous points making it impractical as a proper commuter cycle route. The same can be said for the route between Abergavenny and Brynmawr. The only relatively practical example of this in the vicinity is the cycle track around the Forest of Dean, although again there is a significant missing section due to private land ownership and it can hardly be of any use at all as a green form of transport to and from residential and retail areas, as it connects nothing to nothing. But its a good example of an old railway being used as a cycle route in tranquil setting if nothing else.

6. "Supercharging the bus network". This phrase is difficult to understand as to what it would be trying to achieve and more importantly, how it would be trying to achieve it. But more is understood by the following facts. Buses throughout wales, are extremely "slow and circuitous". This is only appreciated by people who actually use buses in Wales, rather than by people in offices who just stare at pretty multicoloured flat maps. For example, a bus from Cwmbran to Pontypool can take up to an hour to travel the 6 mile journey. A bus from Newport to Tredegar can take more than 4 hours to do the 22 mile journey. As for a bus from Monmouth to Newport which is some 30 miles (via Pontypool and Usk or via Chepstow, makes no real difference to the distance), it can take even longer. Bearing in mind of course these journey times are real world experiences, not based on meaningless bus timetables and are only one way!

Buses like this, supercharged or otherwise, are totally impractical as a mode of public transport for commuters and it is hardly surprising that such buses are only every two hours! It isn't because there is no demand for public transport, it is because they are far too slow and utterly useless to anyone, apart from a day out for the Mr Magoo appreciation society! One of the reasons buses in Wales are so slow is because of the geography and countless steep gradients along the whole road network. Another reason is that buses rarely achieve average speeds of more than 25mph and along some bus routes in Wales, there are bus stops every 250 yards. Buses also frequently stop for up to 10 minutes at a time due to numerous reasons, taking fares etc, etc, etc. The least said about several buses all stuck in the same line of traffic, the better. So, whatever is meant by "Supercharging the bus network", unless that means turning buses into things that literally fly or virtually turning them into trains with a complete road system dedicated only for them, it is unlikely to make any difference to the actual services provided by buses in the current configuration.

7. "It wouldn't attract enough passengers to be worthwhile". If this railway between Pontypool, Usk, Raglan, Monmouth and Ross on Wye had been retained and mothballed during the 1970's and brought back into service some time in 2000's, there would be absolutely no question about its viability today. This is evidenced by the success of the newly reinstated railway to Ebbw Vale, which has seen more than three times the numbers of passengers than was expected, with a population not much bigger than Monmouth. They nay sayers said it would never give any returns for the public purse, and just how wrong were they! Whilst the passenger numbers for a Monmouth railway connection may have been low during the 1960s and 1970s, likely passenger numbers today are considerably higher, because there are now far more people are living in those areas. This is similarly the case throughout most of the UK, for example the need for railway connections at places like Thornbury and Portishead in Somerset are nothing short of desperate and urgent and long overdue with the development of massive housing estates over the last 10 years.

For those that have read the whole of my response, thank you for taking the time to read it, I hope you have found it informative and thought provoking.
Excellent positive vigorous argument, makes a change from the backward looking stale orthodoxy that rail inariably has little to offer that we get trotted out on “Rail Forums”
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,579
Location
Neilston, East Renfrewshire
This remains the case today, for example just the wages alone of one train driver versus the number of lorry drivers wages to transport the same amount of cargo, does not need a maths genius to appreciate which is the cheaper, let alone all the other associated costs.

Just to address that particular assertion; One train driver can indeed move the same amount of cargo as multiple lorry drivers, but only between rail terminals! How does the freight get from origin to starting rail terminal, from terminating rail terminal to destination, and how is it loaded and unloaded? In a small country such as the UK a direct road journey from origin to destination is usually faster and cheaper. Nobody's, least of all Beeching's, fault, simply a result of geography.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,398
Location
The Fens
Viability. If a railway is so unviable
Railways such as Chepstow-Monmouth were constructed primarily to move freight, when the best road transport was horse and cart. They ceased to be viable when internal combustion engine powered vehicles replaced horse and cart on the roads. For passenger traffic, they were never viable.

why was it so necessary to construct a dual carriageway all the way from Newport, through Monmouth, on to Ross on Wye and beyond in the first place.
The next big developments in road transport for goods were articulated lorries and containers. The M50/A40/A449 is the main route between the Midlands and South Wales for lots of those articulated lorries and containers. It is part of a National network that was mainly constructed in the 1970s. When South Wales had a steel industry and the West Midlands had a metal bashing industry it was a key route that was far more important for freight than people.

One train driver can indeed move the same amount of cargo as multiple lorry drivers, but only between rail terminals!

A more recent development is the offshoring of lots of manufacturing, particularly to the Far East. Many goods for distribution around the UK don't start their journey at UK factories, but when they come off a giant container ship at Southampton or Felixstowe.

Imported goods heading for Monmouth will go in a container from Southampton or Felixstowe to some distribution centre, and that bit of the journey might be by rail, but the last part will be by road.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,864
Just a point on the principles of viability.
There isn‘t a rail line in Wales that covers its operating costs, let alone offer any contribution to the cost of construction.
 

8H

Member
Joined
6 Jul 2013
Messages
259
I am sure you have a respectable and informed argument here but a substantivd point that the “OP” makes is that you can make the same respectable and informed argument about many, and maybe any Welsh road too!
 

Pigeon

Member
Joined
8 Apr 2015
Messages
1,123
The M50/A40/A449 is the main route between the Midlands and South Wales for lots of those articulated lorries and containers. It is part of a National network that was mainly constructed in the 1970s. When South Wales had a steel industry and the West Midlands had a metal bashing industry it was a key route that was far more important for freight than people.

It was the source of local jokes about "having your own private motorway" because you would turn off the crowded and jostling M5 and suddenly find yourself on this amazing wide empty road with hardly another vehicle in sight. Only motorway in the country to have a T-junction - I think it is number 3 - ie. the minor road just joins the carriageway directly at right angles, and there are so few people to care about it that it still is like that. http://www.streetmap.co.uk/map/idld...d&searchp=ids&dn=627&ax=366784&ay=226253&lm=0 I had an idea they'd fixed it about 12 years ago but apparently not.

That route was definitely an important route for heavy bulk freight once the South Wales steel industry got going, such as iron ore from the East Midlands etc which was important to both the Midland and the GWR, but there was never a route on the ground to carry the traffic on the logical route. There were still "direct lines" from the East Midlands to South Wales being promoted as late as the 1890s by which time they should have known better.

More promising had been the Worcester, Dean Forest and Monmouth scheme of the 1860s, from Ross via Newent to Malvern, which not only got its Act passed but actually got as far as building ~200m of embankment where the line crossed the land of one of the promoters. I also like to wonder how things could have turned out if the Midland had been a bit more on the ball about the Merthyr, Tredegar and Abergavenny line and not got sniped by the LNWR, which would have given them a properly solid presence in South Wales and so no doubt created a much greater need for a good connection between there and the rest of their network than they had by running over the WMR lines: perhaps a similar route but going to Ashchurch rather than Malvern. Maybe we might even have ended up with both. Trouble is the developments in steelmaking which created the particular need for South Wales to import iron ore from England hadn't happened yet, so they couldn't plan for this because they didn't know what they'd be missing. But with a bit of luck we might have seen it happen, and even seen it survive the demise of the steel industry as a major passenger route between the Midlands and South Wales...

(Crawshay Bailey had an engine
It was always needing mending
When it felt like playing truant
It might run as far as Newent)
 
Last edited:

daodao

Established Member
Joined
6 Feb 2016
Messages
3,602
Location
Dunham/Bowdon
The heritage Dean Forest Railway that is a project that commenced in 1970 and is still operational. It has a mileage length of over four miles and uses a part of the former Severn and Wye rail system. Has anyone ridden on it and if so, what are your views?
The Dean Forest Railway is merely that section of the formerly extensive railway network in the Forest of Dean, Gloucestershire, England, that survived until the preservation era because it served former collieries and coal mine workings close to the final terminus of Parkend until the 1960s.

It is a relatively short branch line running limited services using steam tank locomotives, dmus and small diesel locomotives and doesn't really have a public transport function; I did travel on it about 30 years ago. It states on its website at https://deanforestrailway.co.uk/about/

Founded by the Dean Forest Railway Society in 1970, the Dean Forest Railway runs along part of the old Severn & Wye Railway lines, which were first built as a tramroad over 200 years ago.

The current railway line is approximately 4.5 miles long, running from Lydney Junction Station (close to the mainline railway station and a short walk from the harbour) at the south end of the line to Parkend (a small forest village) at the north end of the line.

East Monmouthshire is a separate area in Wales west of the River Wye and did not have any steam-worked industrial railways, as what little industry there was on the west side of the River Wye disappeared well before the end of the 19th century. The railways that were built to serve Monmouth never had any significant industrial traffic, in contrast to the Forest of Dean. I recall about 25 years ago walking along a path west from Tintern into the hills that was originally a tramroad built to serve an ancient iron works, but it was never steam-worked.
 