Modern station design

Status
Not open for further replies.

Waddon

Member
Joined
15 Sep 2009
Messages
469
Can anyone tell me why modern station designs often have different length platforms for up and down trains, even though both directions will be served by trains of the same length?

Shepherds Bush is a good recent example, which I originally assumed was due to the tightness of the location, but I've just been looking at the network rail plans for North London line station improvements, and many of the stations are being rebuilt with considerably longer platforms on one side than the other - for example, the eastbound platforms at Brondesbury Park are being extended by 28 metres, while the westbound are being extended by only 6m (both platforms were originally approximately the same length).

I'm sure theres some logical reason for it, but I can't see it for the life of me...
--- old post above --- --- new post below ---
....and, West Croydon has just had one of its through platforms extended by about three/four carriage lengths, whilst the other has been untouched - is this some London Overground thing?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

142094

Established Member
Joined
7 Nov 2009
Messages
8,789
Location
Newcastle
The only thing I can thing of is that they may want to increase capacity on peak time services eastbound, so have added extra platform space while they have the chance.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
The only thing I can thing of is that they may want to increase capacity on peak time services eastbound, so have added extra platform space while they have the chance.

Wouldn't those longer trains come back the other way?
 

Waddon

Member
Joined
15 Sep 2009
Messages
469
The only thing I can thing of is that they may want to increase capacity on peak time services eastbound, so have added extra platform space while they have the chance.

I don't think this the case on the North London line - services both ways are as heavily loaded as eachother in places. Plus, current plans are for 4 car sets, with a later possible extension up to 6 car, so why not just put in six car capacity on both sides?
 