MML Electrification: progress updates

Status
Not open for further replies.

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
My bigger worry for the MML would be that they electrify it and conclude that 110mph EMUs are sufficient. The 810s then go over to CrossCountry for use on lines that still need bimodes.

That said, the Norwich services do not seem to have suffered from becoming EMUs.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
My bigger worry for the MML would be that they electrify it and conclude that 110mph EMUs are sufficient. The 810s then go over to CrossCountry for use on lines that still need bimodes.
Indeed. And we’re back to the nonsense suggestion that Pendos are dumped onto the MML whilst the 810s are commandeered for XC.

On balance, I would still back electrification if the consequence were getting Pendos; but I think the MML is going to lose out whatever happens.

NB: I know some people have expressed support for the Pendos replacing the 810s in the case of full MML electrification; however the reasons I think it’s nonsense are that, say if it happened in 10 years’ time, firstly 10 year old trains would be replaced by ~35 year old trains approaching life expiry; and secondly what do you do for diversionary routes.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
Hitachi seem to be busy on converting 80Xs to have some batteries instead of diesel engines. My doom prediction is that the future of MML wiring depends probably on Newton Aycliffe being able or unable to build/retrofit a high speed BEMU that can run between Leicester and Sheffield/Nottingham. This probably isn't really feasible without some extension of wires to provide in-running charging at one or two stretches along the way. But until that's concluded I wouldn't put it past new-new labour to "indefinitely defer" the project north of Leicester until a "build less infrastructure" option has been past through a few DfT reports - thus wasting lots of money and further de-stabilising supply chains. Then they'd conclude on a descoped discontinuous system, ignore freight completely and say they've delivered value for taxpayers despite wasting an extra decade and paying engineering firms to scrap redevelop plans and paying off construction companies to cancel contracts (á la HS2). All modern British governments seem vitriolically opposed to building new infrastructure, although decarbonisation politics forces them to do something - for transport they view it myopically as switching diesel engines for batteries in either cars or trains instead of a holistic re-imagining of how to carry out mobility with resource/energy efficiency in mind. (Blindly following cost efficiency means doing what always has been done because all the stuff is still there.)
 

Mr. SW

Member
Joined
13 Sep 2023
Messages
525
Location
Armchair
A couple of days ago I went out to look at Loughborough (Mid) Station to see if there hade been any signs of - well - anything and I came across these markings on the Nottingham Road Bridge.
20250109_145014 B75H3 NW.jpg20250109_145108 B75H2 NE.jpg20250109_145200 B75H5 SE.jpg
Three marker pegs at the corners of the bridge marked B75H3 (North west corner), B75H2 (North East corner) and B75H5 (South east corner).

I couldn't find any others and apart from that it was cold.

The Bridge Number is SPC5/75 so this accounts for B (bridge) 75. H is presumably Height and the 2/3/5 is just an identifying number.

Question: Are markers in connection with a possible bridge raising in view of electrification? The arch looks comparatively low and the platforms mean you can't lower the track. Replacing the bridge will be interesting as there is an access point to the former Brush Works which could be potentially cut off in view of the GCR Bridge 326 being of restricted clearance, but not unduly so.

Edit for position of B75H2
 
Last edited:

PJM

Member
Joined
20 Aug 2021
Messages
220
Location
Market Harborough
A couple of days ago I went out to look at Loughborough (Mid) Station to see if there hade been any signs of - well - anything and I came across these markings on the Nottingham Road Bridge.
View attachment 172615View attachment 172616View attachment 172617
Three marker pegs at the corners of the bridge marked B75H3 (North west corner), B75H2 (South west corner) and B75H5 (South east corner).

I couldn't find any others and apart from that it was cold.

The Bridge Number is SPC5/75 so this accounts for B (bridge) 75. H is presumably Height and the 2/3/5 is just an identifying number.

Question: Are markers in connection with a possible bridge raising in view of electrification? The arch looks comparatively low and the platforms mean you can't lower the track. Replacing the bridge will be interesting as there is an access point to the former Brush Works which could be potentially cut off in view of the GCR Bridge 326 being of restricted clearance, but not unduly so.
Once again more signs of activity! Someone more qualified than me will hopefully shed some light on this. Well interpreted so far Mr SW
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,472
On the OLE125 side of things, some of the anti-fall BWAs between Cricklewood and Borehamwood (and occasionally north thereof) now have two adjacent 'half-size' weights. However these are only located at one end of the wire runs they support, with a 'full-size' weight at the other end.

In addition, only a few of the old fast-line STCs on that stretch remain in situ.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
On the OLE125 side of things, some of the anti-fall BWAs between Cricklewood and Borehamwood (and occasionally north thereof) now have two adjacent 'half-size' weights. However these are only located at one end of the wire runs they support, with a 'full-size' weight at the other end.

In addition, only a few of the old fast-line STCs on that stretch remain in situ.
I think the "two half-weights" practice might be based on the local geography around the anchor mast, and would lower the risk of the weights touching the floor (and thereby losing tension).
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
I’ve noticed quite a few wooden pegs placed adjacent to the UDS, just south of Leicester station.

Makes me wonder based on the track layout here, that they’ll be utilising portals here?
 

Discuss223

Member
Joined
30 Oct 2024
Messages
375
Location
Rowsley
This is drifting off topic, but the answer to that is, for me, batteries.
The answer for me is to keep using what works for the route. The typical customer doesn't care if the train is powered by a diesel engine. They want a reliable and convenient service. The current set up at places such as Nottingham, Derby, Sheffield has worked well for years.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Within or south of the retained cutting?
So they seemed to be dotted on the eastern side/edge of the UDS. I didn’t check the other side where the retaining brick wall is.
 

Attachments

  • IMG_8597.jpeg
    IMG_8597.jpeg
    450.4 KB · Views: 101
  • IMG_8598.jpeg
    IMG_8598.jpeg
    451.9 KB · Views: 97

Mr. SW

Member
Joined
13 Sep 2023
Messages
525
Location
Armchair
Further to my entry #7925, I've found three more surveyor's points and have them plotted on Google Maps. The points are B75H1, one illegibly marked one on the middle of the bridge and a big X on the Down Platform.
Screenshot 2025-01-16 192310.png
Google Map of Loughborough Station
20250115_152117.jpg
X marks the spot of the blue pin.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
What are the chances that the South Wigston avoider lines, as well as the lines through the station itself, will also be electrified, as part of an overrun from the MML?

This will mean all sides of the triangle will be electrified. I imagine electrification would run just beyond the Saffron Road, road bridge.
 

Attachments

  • IMG_8620.jpeg
    IMG_8620.jpeg
    4.6 MB · Views: 142

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
What are the chances that the South Wigston avoider lines, as well as the lines through the station itself, will also be electrified, as part of an overrun from the MML?

This will mean all sides of the triangle will be electrified. I imagine electrification would run just beyond the Saffron Road, road bridge.
It is possible that no overrun at all will be provided.
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
On the subject of over-run wiring; I understand the concept of over-run wiring for a short distance on a diverging and not electrified route - but what happens when the wiring just stops on straight line? I am thinking of the Down Loop from Kilby Bridge Jct Northwards, where, viewed from a passing train, the wiring appears to cease halfway along. Is the last section electrically dead? Is the contact wire carried to one side before it terminates? I guess the same situation on the Up and down main lines, more difficult to see from a train.
Probably basic (?silly?) questions, but with non-contiguous electrification becoming commonplace it's something that will become more common.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
what happens when the wiring just stops on straight line?
Well at Blackfriars the wiring just stops; the pantograph pops upwards - and smashes itself to bits on the ceiling of Blackfriars station.



I really don't know why they don't have a non-conducting slider bar to keep the pantograph down so it doesn't destroy itself, and only allowing it to rise where there is enough space for the lifting mechanism to detect tthe over height condition and lower automatically
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,231
With the 810s being Bimodes and even modern pure EMUs tending to be specified with some sort of emergency battery power, being sent down a non electrified line is less of an issue now. They can just reverse out!
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
Although I've heard that it can be a problem if your pantograph is taken off the wires. I might be wrong on this but i though GB pantographs have no set maximum height, as in without a wire it'll "break its back".
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,850
Location
Northampton
Well at Blackfriars the wiring just stops; the pantograph pops upwards - and smashes itself to bits on the ceiling of Blackfriars station.



I really don't know why they don't have a non-conducting slider bar to keep the pantograph down so it doesn't destroy itself, and only allowing it to rise where there is enough space for the lifting mechanism to detect tthe over height condition and lower automatically

Thanks. Just seems a bit inconsistent that so much attention is given to avoid panto. damage on a diverging route but not on a continuing, but unwired, one. RailwayCodes > Bridges gives Kilby Bridge as 74.14 and there are then 3 overbridges before MP 75, so if there's an overrun with the pan up one might predict a 'Blackfriars' event.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Although I've heard that it can be a problem if your pantograph is taken off the wires. I might be wrong on this but i though GB pantographs have no set maximum height, as in without a wire it'll "break its back".
I think there is an Automatic Dropper (Dropping?) Device that will sound an alarm in the cab and lower the pantograph if it exceeds a certain height.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
I think there is an Automatic Dropper (Dropping?) Device that will sound an alarm in the cab and lower the pantograph if it exceeds a certain height.
I believe so, but the pantograph rises rather slowly so there is a risk of it hitting a bridge before this activates.
 

jthjth

Member
Joined
10 Apr 2015
Messages
382
This from a leaflet from a local councillor:

(reply to councillor from Network Rail)

We can confirm that our current plan for Blaby Road bridge as part of the electrification work is now to lower the track underneath the bridge rather than reconstructing the bridge. This decision has been made following extensive review of both options to ensure the most efficient use of public money.
The track lower option will avoid any lengthy road closures. The track lower is currently in the planning review process. The design work is planned to start in December 2024. The physical works could be between Summer and Autumn 2025, but these are provisional dates at the moment.
We will also need to amend the bridge parapets on this bridge. This work is needed to minimise the risk to members of the public, railway front line workers and emergency services for when the OLE is installed and live at 25,000 volts. For the parapet work, some traffic management will be required (i.e., single lane working) but until we have a design confirmed we cannot confirm the programme and timescales. It will however be a much shorter period compared to the reconstruction, potentially 4 — 6 weeks.
Kind regards
<redacted by me> Community Relations Executive.

OCR from a scan of the leaflet so apologies for any errors.
 
Last edited by a moderator:

tram21

Established Member
Joined
29 Dec 2022
Messages
1,305
Location
Nottingham
This from a leaflet from a local councillor:

(reply to councillor from Network Rail)



OCR from a scan of the leaflet so apologies for any errors.
If this is being planned does that mean there's probably some sign-off for a continuation in works? Odd they would be planning to do it in Autumn otherwise.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Recent addition: pegs have started creeping up along the Trent East to Trent West curve (ELR: TES) along with the Trent South Jn to Nottingham line (TSN1). I only saw the Up side from the train I was on... but encouraging signs nonetheless!
 