SPL / NR were kind enough to share Modern Railways' latest (October 2024) article on MMLE. It's quite a substantial article, so I'll quote a few paragraphs.
Great article from Modern Railways on The East Midlands Bright Spark story! Latest updates on the Midland Main Line #electrification programme & quotes from our Regional Director - England & Wales Steve McWhan & our Engineering Director Simon Skinner C.Eng FIET FPWI
www.linkedin.com
There's a PDF download link in the top right when the viewer is maximised, but the generated URL expires after a while (hence why I've shared the LinkedIn address instead).
In the video below (during last weekend's possession) you can see someone on a MEWP (Mobile Elevated Work Platform) lowering a wire run - was that retensioning? They were positioned at an overlap where a pair of wire runs were retensioned in March.