Is the electrification of the Leicester Gap not urgent because Hitatchi are developing a Battery powered 802 which may later benefit the 810 Aurora's.
A 810 Mk2 variant could travel from St Pancras to Wigston South Jct on overhead power then swap from that to battery power until Syston then Overhead until East Midlands Parkway.?
This would overcome the what do we do with Wigston-Syston section and also the London Road bridge at Leicester Station.
After EMP I don't know what the plans are.
A 810 Mk2 variant could travel from St Pancras to Wigston South Jct on overhead power then swap from that to battery power until Syston then Overhead until East Midlands Parkway.?
This would overcome the what do we do with Wigston-Syston section and also the London Road bridge at Leicester Station.
After EMP I don't know what the plans are.




