BBC are reporting it

Bit odd this bit coming from a Network Rail bod.
"Electric trains are actually much lighter than the diesel trains that we normally see out there on the infrastructure, so as a result of that, they are quieter."

Its not really the lighter weight that makes them quieter! And the trains using this section will presumably be heavier than an equivalent diesel as they carry diesel and electric bits and pieces.

== Doublepost prevention - post automatically merged: ==

For Syston - Trent which sides of those junctions are the limits - ie will the junctions and Syston station be included?
Will it be be minimal scope (electrify as is), or might there be improvements such as extra platforms for Syston and Loughborough, and the start of a fourth track toward Leicester?
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
For Syston - Trent which sides of those junctions are the limits - ie will the junctions and Syston station be included?
Will it be be minimal scope (electrify as is), or might there be improvements such as extra platforms for Syston and Loughborough, and the start of a fourth track toward Leicester?
A letter to Rushcliffe as part of a planning application is a bit more specific and says "Syston North Junction to Sheet Stores Junction and Trent Sidings".
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I believe the limit to Syston North junction, only.

A letter to Rushcliffe as part of a planning application is a bit more specific and says "Syston North Junction to Sheet Stores Junction and Trent Sidings".
Thanks. Makes sense to leave Syston for the decisions on the Leicester area.
Are Trent Sidings the ones on the north side of the Nottingham line between the high and low level Toton lines? If so I assume that the Sheet Stores/Trent East/Trent South junction is included…..
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Not sure if it’s been mentioned upthread, but there are now Class 810 pan up and pan down signs in the up and down direction respectively, just north of Mill Hill, adjacent to London Gateway services on the M1.

These are currently bagged up and are located adjacent to London Gateway Services. They will be a temporary measure until the wiring is upgraded to >100mph standard, and 810s on the fasts will need to slow to 100mph before the pan is raised.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Not sure if it’s been mentioned upthread, but there are now Class 810 pan up and pan down signs in the up and down direction respectively, just north of Mill Hill, adjacent to London Gateway services on the M1.

These are currently bagged up and are located adjacent to London Gateway Services. They will be a temporary measure until the wiring is upgraded to >100mph standard, and 810s on the fasts will need to slow to 100mph before the pan is raised.
Many thanks for the update.
Are there similar signs near Bedford, and possibly also Luton?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
RAIL mag #1014 has a one-sentence item saying 91117 is being prepared for electrification testing north of Kettering. This confirms post #7366.
 

WymoWanderer

Member
Joined
18 Dec 2017
Messages
115
Location
Between BDM and WEL
Also a lot of OLE steelwork at the compound in Wymington next to the Goods / slow line.
That's been there ever since they electricified the line back in 2019-2020.

Occasionally the site is used as a depot for road/rail machinery but nowadays it's just a vacant compound with some steelwork.
 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,084
I know. I wrote the article! Obviously there have been other editors who have added to it.
Well written Gralistair!
I was particular taken by comment that it had proceeded at "...snails pace" given the history of stop - start -pause - stop - start - plus a major contractor (Carillion) going bust plus Covid..... I am amazed at the progress SPL and others have achieved...which is why I regret they have largely been not enabled to continue it seems.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
Has there been any official announcement regarding the potential remodelling of Wigston North Jn to Syston?

I think it's a smart move to leave a gap in this area, for the continuation of the electrification further north, should there be any major changes to the track layout.

Currently, it looks like its up to capacity. Where the lines to/from Nuneaton join is often a pinch point, as this is where conflicts take place. 1C47 was waiting for around 7 minutes behind 4M81, as it was standing in the loop prior to being let out in front of 1C47, before diverging at Wigston North Jn.

A signalling map provided by Open Train Times showing the area between Wigston North Jn and Leicester Station.

1721910409813.png
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
Has there been any official announcement regarding the potential remodelling of Wigston North Jn to Syston?
AIUI there has been no formal confirmation of a single option, let alone funding.

The last thing I'm aware of is this paper by NR: https://sacuksprodnrdigital0001.blob.core.windows.net/regional-long-term-planning/Eastern/Leicester Area Strategic Advice 2021.pdf, which should be regarded as pretty much the profession equivalent of the 'Speculative Ideas' section of this forum.
 

blueberry11

Member
Joined
19 Aug 2023
Messages
162
Location
Norwich
Today (Sunday 28 July 2024) is the day the MML from Kettering to Wigston should have it's wires turned on. Now it's time to see the 810s (and other bi-mode trains) use them for testing shortly but its still far away for public use.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,056
Today (Sunday 28 July 2024) is the day the MML from Kettering to Wigston should have it's wires turned on. Now it's time to see the 810s (and other bi-mode trains) use them for testing shortly but its still far away for public use.

Geographically the MML's wires now extend north of Birmingham
 

DDB

Member
Joined
11 Sep 2011
Messages
726
Is it known when they expect to finish the upgrade work to allow full speed running on the exisiting wires south of Bedford?
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,691
Is the current plan to still use battery power through the tunnel into Leicester station ?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Is it known when they expect to finish the upgrade work to allow full speed running on the exisiting wires south of Bedford?
Based on a scan of cab-ride footage, most/all of the weights north of Luton have been done, but there are still a few to go between Luton Airport & Cricklewood.

I don't believe any work to upgrade registrations (i.e. cantilevers) for higher pantograph uplifts and re-grading bridge approaches has commenced - if that work even is part of the programme at this point. Even then, the adjustments would only be in areas where the non-EMU linespeed exceeds 100mph.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Is the current plan to still use battery power through the tunnel into Leicester station ?
I don't think that's ever been firmer than a suggestion. The most recent rumours are that full electrification will be possible. There is as yet no authorisation to start physical work on electifying anywhere north of Wigston South. Anyway, the class 810s that are being built for the MML are diesel or overhead line only, as far as I know.
 

Smoggy

Member
Joined
4 Aug 2009
Messages
85
Braybrooke Entry into Service at 22:10, now feeding Sharnbrook to Corby/South Wigston.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Yes



It was never the plan, as the 810s don‘t have traction batteries.
That’s true, but given a trial is planned to instal a battery in a TransPennine 800 series unit, it’s not completely in the realms of fantasy that a Labour Govt that is reportedly about to axe several road and rail projects to save money might pare down the MML scheme to just the easy bits to save money. And then use batteries to declare that the line is fully electrified.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
That’s true, but given a trial is planned to instal a battery in a TransPennine 800 series unit, it’s not completely in the realms of fantasy that a Labour Govt that is reportedly about to axe several road and rail projects to save money might pare down the MML scheme to just the easy bits to save money. And then use batteries to declare that the line is fully electrified.

How would adding batteries to trains that already have diesel engines be cheaper thsn not adding them?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
How would adding batteries to trains that already have diesel engines be cheaper thsn not adding them?
You would be comparing the cost of installing them with the saving by not doing all the difficult bits of the MML electrification, presumably all the large stations.
 