Contrary to my previous assumptions it looks like much of the remaining installation work is already done - I've attached pictures of the setup near Braybrooke / Wigston substations.

From what I could tell on yesterday's travels there were some sealing ends on cross-track feeder masts and most of the Braybrooke neutral (Up Main) left to install, but the wire run connections are probably all in place. Even the Wigston neutrals are already there, which I previously considered a RS2 deliverable.

From the Spion Kop bridge you can see the RS1 OLE limit about 400 metres up the line (OHNS is 230 metres further up). Incidentally the Freightliner loco - spotted by chance - was operating under headcode 6M92.

I also had a look at the fast line OLE anchoring south of Bedford. As expected there are more anti-fall installations in place, but the retensioned Mk3b wire runs in Wixams (see post #7065) were still attached to one BWA at each end; it appears that OLE125 is not replicating the 15/12kN tensioning present in UKMS125.
 

Attachments

  • Braybrooke GSP pylon.jpg
    Braybrooke GSP pylon.jpg
    258.2 KB · Views: 165
  • Braybrooke neutral section (DM).jpg
    Braybrooke neutral section (DM).jpg
    215.2 KB · Views: 153
  • Cross-track feeder masts at Wigston (left for OLE, right for ATF).jpg
    Cross-track feeder masts at Wigston (left for OLE, right for ATF).jpg
    289.4 KB · Views: 149
  • Switching masts at Braybrooke ATFS.jpg
    Switching masts at Braybrooke ATFS.jpg
    327.8 KB · Views: 152
  • Where Braybrooke neutral section (UM) will go.jpg
    Where Braybrooke neutral section (UM) will go.jpg
    256.9 KB · Views: 160
  • Wigston MPATS ft. Poppy 66614.jpg
    Wigston MPATS ft. Poppy 66614.jpg
    686.9 KB · Views: 165
  • Wigston MPATS.jpg
    Wigston MPATS.jpg
    955.7 KB · Views: 169
  • Wigston neutral section (UF).jpg
    Wigston neutral section (UF).jpg
    274.7 KB · Views: 168
  • Wigston neutral sections (U&DS, DF).jpg
    Wigston neutral sections (U&DS, DF).jpg
    246.2 KB · Views: 164
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
There's a real contrast between the heavy vegetation in the foreground and the cleared section where the OLE has been put up in the background, at Wigston. Are there any further vegetation works planned for this area, ready for future electrification?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,461
Location
Preston Lancs
There's a real contrast between the heavy vegetation in the foreground and the cleared section where the OLE has been put up in the background, at Wigston. Are there any further vegetation works planned for this area, ready for future electrification?
One would assume that will happen when scheme RS2a starts.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
One would assume that will happen when scheme RS2a starts.
Hopefully that happens fairly soon. Would hate for it to be ‘paused’ for another few more years again. A steady rolling electrification project is the way forward and no doubt keeps costs down, whilst maintaining workers’ competency and jobs.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
There's a real contrast between the heavy vegetation in the foreground and the cleared section where the OLE has been put up in the background, at Wigston. Are there any further vegetation works planned for this area, ready for future electrification?

From the Spion Kop bridge you can see the RS1 OLE limit about 400 metres up the line

A bit off topic but regarding vegetation - quite the contrast the two links below. The first is a photo from 1975 from an identical point of view. The second is the earliest Google Street View imagery from 2008.

Hopefully that happens fairly soon. Would hate for it to be ‘paused’ for another few more years again.
There are definitely things planned to happen north of Syston in the near future - e.g. Network Rail have applied to close the A6006 bridge at Sutton Bonington from November to July 2025 for reconstruction.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,472
That could be the first piece of post-preliminary RS3 construction work to get started. Had a look at that bridge (labelled Rempstone Road, SPC5/OB:88) on Street View and am pleased to see it isn't one of those already adjusted pre-2017-descoping.

In the meantime, there are still a couple of ongoing RS1 bridge closures to road/pedestrian traffic:
* Wistow Road (SPC3/OB:9) until 26 July
* Glen Station (SPC3/OB:10) until 23 August [further extension from 29 July recently granted]
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
Looking on one.network over the next 12 months, there's a planned overnight closure of Stanford Rd/Bowleys Bridge (SPC5/83, 113m 24ch), from 22:00 1/3/25 to 06:00 2/3/25.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Looking on one.network over the next 12 months, there's a planned overnight closure of Stanford Rd/Bowleys Bridge (SPC5/83, 113m 24ch), from 22:00 1/3/25 to 06:00 2/3/25.
That bridge appears from Streetview to have undergone some sort of rebuild between 2011 and 2017 - at minimum its brick parapets were replaced by modern concrete ones.


(link is to Streetview)

However a one-night closure is not a big event, possibly a routine inspection.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,597
Location
Nottingham
That could be the first piece of post-preliminary RS3 construction work to get started. Had a look at that bridge (labelled Rempstone Road, SPC5/OB:88) on Street View and am pleased to see it isn't one of those already adjusted pre-2017-descoping.

In the meantime, there are still a couple of ongoing RS1 bridge closures to road/pedestrian traffic:
* Wistow Road (SPC3/OB:9) until 26 July
* Glen Station (SPC3/OB:10) until 23 August [further extension from 29 July recently granted]
That's got to be one of the lowest parapets on a road over rail bridge anywhere!
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,524
Location
Derby
So, heading North, how far away would the next substation be? I know there was plans for one at Ambergate, but wondered if there was one serving the Nottingham leg.
 

Edvid

Established Member
Joined
7 Feb 2008
Messages
2,472
Assuming you're asking about feeder stations in particular, the next one would be near Kegworth, per post #6875. There's a National Grid compound nearby (where soon-to-close Ratcliffe-on-Soar power station is), but I don't think it's clear whether the connection would start there or (as Braybrooke ATFS does) tee-off the transmission lines above.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
And there's to be another feeder station after that at Chesterfield.

Others may know where track sectioning cabins or autotransformer stations are proposed.

As far as I know, no physical work has been seen at any sites, nor any planning applications, but it has been mentioned upthread that the application for the grid connection at Kegworth was put in some time ago.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,853
Location
Beeston (Notts)
And there's to be another feeder station after that at Chesterfield.

Others may know where track sectioning cabins or autotransformer stations are proposed.

As far as I know, no physical work has been seen at any sites, nor any planning applications, but it has been mentioned upthread that the application for the grid connection at Kegworth was put in some time ago.
I'd imagine there'd be an ATS or SATS in the Syston area, with overruns on the "triangle" towards Melton, either in whole or (more likely) in part.
An educated guess would probably place another ATS in or around Loughborough, and there'd definitely have to be SATSs at Trent, Derby and possibly Nottingham.

IIRC, Hasland would be the 4th and final grid connection, after Long Meadow Farm, Braybrooke & Kegworth.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,394
Location
S Yorks, usually
New Transport secretary MP for Sheffield Heeley - is there hope for a speedier electrification?
From https://www.bbc.co.uk/news/articles/c0veg88g7jyo
Louise Haigh has been named as transport secretary.

Keir Starmer made her shadow Northern Ireland secretary in 2020 before she took on the shadow transport brief in 2021.

Haigh, the MP for Sheffield Heeley…
Edit: already being discussed on here at
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,432
Location
Sheffield
The western boundary of Louise Haigh's Heeley constituency is actually the MML from Dore into Sheffield Midland station, see; https://boundarycommissionforenglan...c807f77/a3-maps/YH_44_Sheffield Heeley BC.pdf

Louise was party to a proposal to the Restoring Your Railway Fund to reopen Heeley, Millhouses and Beauchief stations along that stretch. It was unsuccessful, not least because it would have potentially conflicted with adding a third track in conjunction with electrification. (There's no longer enough space to restore a 4th.) That and reconfiguring platforms and tracks at Sheffield (and then beyond?) make that an expensive section to deal with. Plenty of scope to add delays but Huw Merriman reckoned it would be done by the early 2030s. Without expecting miracles maybe by 2035-40?
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,524
Location
Derby
The western boundary of Louise Haigh's Heeley constituency is actually the MML from Dore into Sheffield Midland station, see; https://boundarycommissionforengland.independent.gov.uk/review2023/b65f7782-658b-4c4a-9cba-59c16c807f77/a3-maps/YH_44_Sheffield Heeley BC.pdf

Louise was party to a proposal to the Restoring Your Railway Fund to reopen Heeley, Millhouses and Beauchief stations along that stretch. It was unsuccessful, not least because it would have potentially conflicted with adding a third track in conjunction with electrification. (There's no longer enough space to restore a 4th.) That and reconfiguring platforms and tracks at Sheffield (and then beyond?) make that an expensive section to deal with. Plenty of scope to add delays but Huw Merriman reckoned it would be done by the early 2030s. Without expecting miracles maybe by 2035-40?
Maybe bi mode trains took away the urgency. Still seems odd, lugging all that dead weight about.
 

tram21

Established Member
Joined
29 Dec 2022
Messages
1,307
Location
Nottingham
Sorry if I missed something upthread, but is there actually funding/ proper plans for electrification past Leicester? There's mention of work potentially starting, but I believed there wasn't funding, but I may be mistaken in that!
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
Sorry if I missed something upthread, but is there actually funding/ proper plans for electrification past Leicester? There's mention of work potentially starting, but I believed there wasn't funding, but I may be mistaken in that!
I think the latest is a Framework contract that was announced at the end of 2023, but that doesn't mean any money has been committed yet. Details here:

Others may have more definite information.
 

38Cto15E

Member
Joined
1 Nov 2009
Messages
1,116
Location
15E
The MP for Nottingham South is a former Chair of the Transport Select Committee so the MML has people in the right places.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,588
Sorry if I missed something upthread, but is there actually funding/ proper plans for electrification past Leicester? There's mention of work potentially starting, but I believed there wasn't funding, but I may be mistaken in that!

Funding for implementation beyond Syston has not been approved yet. If it had been, you can be sure there would have been a big announcement.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,232
I was surprised, electorally, that the previous government didn't approve funding for the rest of the MML scheme, for the photo ops and chance to show they were investing in the East Midlands and South Yorkshire etc. I wonder if the early election meant that they weren't ready for announcement...
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
Until there is a NG offer with price and completion date for the Grid Supply Point from the Ratcliffe sub station, no Govt/NR approval can take place, as there is no firm completion date and therefore proposed installation program. It's always possible that a PFC solution may now be adopted.

Patience

WAO
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Until there is a NG offer with price and completion date for the Grid Supply Point from the Ratcliffe sub station, no Govt/NR approval can take place, as there is no firm completion date and therefore proposed installation program.
Have NG [National Grid] been asked for a quote?

It's always possible that a PFC solution may now be adopted.
What's PFC? Private finance something? Or something Frequency Converter?
 
Last edited:

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Until there is a NG offer with price and completion date for the Grid Supply Point from the Ratcliffe sub station, no Govt/NR approval can take place, as there is no firm completion date and therefore proposed installation program. It's always possible that a PFC solution may now be adopted.

Patience

WAO
PFC?
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
My typo: should be SFC = static frequency converter, the latest way to obtain 25kV for traction.

I understand (from these columns) that enquiries have been made about the supply point. Can't quote the post number offhand.

WAO
 
Status