Update 26/2/23:
The copers on the parapets at bridge SPC3-42 (Pipewell Rd, Rushton) are finished. There does still seem to be a bit of finishing work to do in the surrounding areas though.


The UM Earth Wire has also been run from the previous overlap at the eastern end of Rushton (by underbridge SPC3-45, Station Rd), and the AT Feeders between footbridge SPC3-43 & bridge 42 have been run (although not yet fully clamped in).



The copers on the parapets at bridge SPC3-42 (Pipewell Rd, Rushton) are finished. There does still seem to be a bit of finishing work to do in the surrounding areas though.


The UM Earth Wire has also been run from the previous overlap at the eastern end of Rushton (by underbridge SPC3-45, Station Rd), and the AT Feeders between footbridge SPC3-43 & bridge 42 have been run (although not yet fully clamped in).