RichmondCommu
Established Member
As someone who regularly used Gloucester Eastgate 60 years ago, what is a "Gloucester Eastgate"?
I wonder if it perhaps means no Intercity services stop there.
As someone who regularly used Gloucester Eastgate 60 years ago, what is a "Gloucester Eastgate"?
No, it is so the Chancellor can spend an additional £5b annually on new roads instead of upgrading local rail routes that have seen 200% growth since the mid 1990s and now heaving in the peaks.
As someone who regularly used Gloucester Eastgate 60 years ago, what is a "Gloucester Eastgate"?
They are generally heaving at the peaks because of sending out 2-car units where. until the mid-1990s, there would have been a 6-car classic dmu. Not particularly to do with infrastructure.No, it is so the Chancellor can spend an additional £5b annually on new roads instead of upgrading local rail routes that have seen 200% growth since the mid 1990s and now heaving in the peaks.
I coined it (as a verb) to mean 'shafted'. IMO, that's what BR (and the local authority) did to Gloucester back in 75, effectively eliminating it off the InterCity network. OK, so later the Nottingham-Cardiff services, which are fast, improved things, but bar one train, it has been eliminated from the Bristol - Brum - Manchester/Leeds expresses that otherwise regularly stopped there. (And in the case of Gloucester, it has only has stopping services southbound to Bristol during the day.)
Similar was planned for Wellingborough, had they electrified back in the 80s. It would have been relegated to an outer suburban station. At least, that was the fear.
They are generally heaving at the peaks because of sending out 2-car units where. until the mid-1990s, there would have been a 6-car classic dmu. Not particularly to do with infrastructure.
And even if the trains were built and available, the TOCs wouldn't want them because it is more financially worthwhile to Pack 'em In. More revenue, no more cost.
I think I'm on topic for the MML by pointing out the current MML timetable has an hourly 4 or 5 car Meridian come south from all of Sheffield, Chesterfield, Derby, EM Parkway, Loughborough and Leicester, followed just a few minutes later by an 8 car HST from just Nottingham, EM Parkway and Leicester. As a result, hour after hour through the day, the Meridian is rammed and the HST mostly empty. The latter even regularly gets delayed by the Meridian being the chosen service to stop at Loughborough.
Electrification or not, this sort of inefficient scheduling is wholly down to the operator, rather than anything with the infrastructure.
That's unfair, there has been considerable more investment in the railways (and motorways) from the Tories (and Lib Dems) since 2010 despite reducing the deficit simultaneously than under the previous Labour government.The Chancellor could do both if he wanted to.
There is no limited pot of money.
But he choses to show reductions in the deficit than to fund infrastructure.
That's unfair, there has been considerable more investment in the railways (and motorways) from the Tories (and Lib Dems) since 2010 despite reducing the deficit simultaneously than under the previous Labour government.
Look at Crossrail, High Speed 2, E-W rail link and all the electrification going on.
Indeed local and national administrations often make political capital boasting about projects conceived in the previous gov't such is the nature of long term infrastructure planning and short term political cycles.That's unfair, there has been considerable more investment in the railways (and motorways) from the Tories (and Lib Dems) since 2010 despite reducing the deficit simultaneously than under the previous Labour government.
That's unfair, there has been considerable more investment in the railways (and motorways) from the Tories (and Lib Dems) since 2010 despite reducing the deficit simultaneously than under the previous Labour government.
Look at Crossrail, High Speed 2, E-W rail link and all the electrification going on.
Any of these projects could have been shelved to try to reduce the deficit except they haven't been. There has been investment in other infrastructure too such as further electrification schemes, the aforementioned light rail projects and spending on roads too.Hold on a mo...would that be the:
- Crossrail project that gained Royal Assent on 22 July 2008
- HS2 project whose company (HS2 Ltd.) was established in January 2009
- GWML and NW Electrification signed off on 23 July 2009
...remind me again when the coalition government was elected?
I'll give you EWR (as that was greenlit in Autumn 2011), but again, remind me again how much has been spent on that, given the last Labour government was saying in 2008 it would look at private financing for the project, which sounds eerily similar to what the current government has said it's pursuing for the project.
Any of these projects could have been shelved to try to reduce the deficit except they haven't been. There has been investment in other infrastructure too such as further electrification schemes, the aforementioned light rail projects and spending on roads too.
I was reading in Rail magazine that Corby is due to be an electric service in 2019, surely it will be later than that?
Hold on a mo...would that be the:
- Crossrail project that gained Royal Assent on 22 July 2008
- HS2 project whose company (HS2 Ltd.) was established in January 2009
- GWML and NW Electrification signed off on 23 July 2009
...remind me again when the coalition government was elected?
I'll give you EWR (as that was greenlit in Autumn 2011), but again, remind me again how much has been spent on that, given the last Labour government was saying in 2008 it would look at private financing for the project, which sounds eerily similar to what the current government has said it's pursuing for the project.
I think I'm on topic for the MML by pointing out the current MML timetable has an hourly 4 or 5 car Meridian come south from all of Sheffield, Chesterfield, Derby, EM Parkway, Loughborough and Leicester, followed just a few minutes later by an 8 car HST from just Nottingham, EM Parkway and Leicester. As a result, hour after hour through the day, the Meridian is rammed and the HST mostly empty. The latter even regularly gets delayed by the Meridian being the chosen service to stop at Loughborough.
Electrification or not, this sort of inefficient scheduling is wholly down to the operator, rather than anything with the infrastructure.
I was reading in Rail magazine that Corby is due to be an electric service in 2019, surely it will be later than that?
Andrea Robertson, project manager at National Grid, said: Our proposed new electricity substation will provide supplies to the proposed new trackside feeder station which Network Rail will build as part of its Midland Main Line upgrade and electrification programme. We want to hear local peoples views on the substation before we apply for planning permission around the end of July and look forward to engaging with the community at the event.
The Midland Main Line railway is undergoing the largest upgrade since it was completed in 1870. Upgrades to the line include track realignment, station remodelling, capacity works, bridge reconstructions and signalling improvements. In addition, the line from Bedford via Kettering to Corby will be electrified by December 2019 enabling faster, more efficient trains to operate on the network and a quieter, cleaner environment for lineside neighbours.
The new substation is one of four new supply points along the railway. The first at Charlton in London is underway. The second at Braybrooke is needed for October 2020.
OK, everyone seems happy with the December 2019 date for the Corby electrification.
I don't see how you can justify electrifying Corby, which has a basic hourly service, when a case apparently cant be made for Leeds-Manchester with a much more intensive service level.
Surely Corby would be more suitable for the class 319 EDMU conversions?
I don't see how you can justify electrifying Corby, which has a basic hourly service, when a case apparently cant be made for Leeds-Manchester with a much more intensive service level.
Surely Corby would be more suitable for the class 319 EDMU conversions?
I don't see how you can justify electrifying Corby, which has a basic hourly service, when a case apparently cant be made for Leeds-Manchester with a much more intensive service level.
Surely Corby would be more suitable for the class 319 EDMU conversions?
I take it you've seen the fares charged to Corby, Kettering and Wellingborough passengers compared to Bedford, Northampton or Huntingdon?
The biggest challenge EMT is going to have is justifying the massively inflated fares at those stations, particularly if they lose their Inter City standard stock in favour of standard commuter EMUs.
I don't see how you can justify electrifying Corby, which has a basic hourly service, when a case apparently cant be made for Leeds-Manchester with a much more intensive service level.
Surely Corby would be more suitable for the class 319 EDMU conversions?
No need to justify anything. Put harshly: Pay or walk to walk.
How do those fares compare to comparable journey lengths/time on Southern?SE or SWT?