New car park on the east side of the station, see documents linked in #843 and #869.So they're going to shave quite a bit off the present car park, are they intending to compensate for this parking loss elsewhere?
New car park on the east side of the station, see documents linked in #843 and #869.So they're going to shave quite a bit off the present car park, are they intending to compensate for this parking loss elsewhere?
I think this presentation answers most of the questions that have been raised
http://politics.leics.gov.uk/documents/s117741/Network Rail presentation.pdf
Plus a nice historic picture on Slide 2 that also shows why the speed limit through the station is 60mph
Transport secretary Chris Grayling is preparing to delay the electrification of huge swathes of the railway network amid a deepening funding crisis at Network Rail.
Plans to upgrade core stretches of track on the TransPennine, Midland Mainline and Great Western routes to run electric trains are set to be put back by years in favour of new bi-mode trains that run on both diesel and electricity.
Instead, the state-owned Network Rail will be told to focus on its day job of maintaining and repairing existing tracks, amid growing concern that this has been neglected in favour of trophy electrification projects.
The company, which owns and repairs Britains 20,000 miles of track and most of its stations, has been under pressure to cut costs since its debt now £42bn fell on to the government balance sheet in 2014. Its chief executive, Mark Carne, has been forced to ask ministers for more cash to repair tracks and signals.
The Department for Transport is finalising plans for Network Rails next funding period, from 2019 to 2024, but is only expected to publish an outline of these later this month.
Details of the controversial delays will stoke the debate on regional inequality. Industry sources said a plan to electrify the Midland Mainline north of Kettering to Sheffield is set to be pushed back by years from its current deadline of 2023. Meanwhile a stretch of electric line to Corby is also under threat. As a result, terms for a new East Midlands franchise are likely to specify new bi-mode trains rather than electric-only.
On the Great Western route, where costs for electrifying the line have trebled from £874m to £2.8bn, the upgrade between Cardiff and Swansea will be stalled again.
In another controversial blow, plans to electrify the TransPennine route between Manchester and Leeds central to the Northern Powerhouse project are likely to be delayed beyond 2022, again in favour of bi-mode trains.
Lilian Greenwood, the former shadow transport secretary, said: It would be hugely damaging if these projects which are essential to the Northern Powerhouse, the Midlands Engine and growth in the southwest and south Wales have been delayed or dropped.
The Department for Transport said: We do not comment on speculation. Passengers expect high-quality rail services and we are committed to electrification where it benefits passengers.
But that would be so much in the British tradition!The painful work of 're-learning how to electrify the railway' has been done, it would be indescribably shortsighted to allow this work to be lost - and will lead to many of the same problems recurring in the future.
So they can electrify the GW main line that runs through the Prime Minister's constituency, but not the Midland Main Line serving lots of very marginal constituencies in the East Midlands - and has the best business case of any electrification scheme?
The Midland Main line always should have been done first - before the GW Main Line.
Er ... they are proposing exactly to use bi-modes to bridge non-electrified gaps such as Bristol Parkway to Bristol TM and Thingley to Bristol TM.There is also unwillingness to think outside the box. For example, rather than wire difficult sections, use bi-modes (diesel or batteries, I don't care which) to bridge non-electrified gaps, or use a lower voltage as was the case in the 1960s.
So they can electrify the GW main line that runs through the Prime Minister's constituency, but not the Midland Main Line serving lots of very marginal constituencies in the East Midlands - and has the best business case of any electrification scheme?
The Midland Main line always should have been done first - before the GW Main Line.
Am I surprised? No! When HS2 was mooted, concerns were raised that it would mean less investment in other parts of the rail network. Nonsense, said the promoters. Well, now it's happening.
Er ... they are proposing exactly to use bi-modes to bridge non-electrified gaps such as Bristol Parkway to Bristol TM and Thingley to Bristol TM.
I don't know what traction the MML is going to have. Maybe they'll be using bi-modes to bridge the non-electrified gap between Kettering and Sheffield and the under-engineered-for-125-mph electrified gap between St Pancras and Bedford!Are they going to do similar on the Midland?
Totally losing faith in everything railway related.
The costs are always too high (when proposed)
The length of time a project takes is always too long
The end result is always way over budget to the point where 10% in you've already spent the amount it would have cost (When proposed).
This just screams of mismanagement. Better to get some Chinese managers and Japanese guys in the hot seats instead of this ridiculous Mark Carne.
Back in the day when Leyland and Rover group were around, same thing happened. Now we have car companies ran by foreign owners making top notch hardware at affordable prices that don't fall to bits.
oh dear - yet more clueless rambling :roll:![]()
oh dear - yet more clueless rambling :roll:![]()
I think his comments are born out of frustration and you can hardly blame him. Network Rail have made an absolute pigs ear of trying to electrify two mainlines and in the case of the MML you have to wonder whether it will get done in the next 20 years.
Whenever I see threads about ideas for future electrification I just think don't be so bloody stupid. Unless the masts are now up you can forget about anything else in England getting done.
You always accept "what is". And then defend what happened with your life. But people want better results, they want honest truths.
If the railway stopped for a month you would be there telling it how it is and defending all the people that are causing it. Meanwhile, people are suffering. hearts are broken, contracts are torn up. Waste of frickin time.
Totally losing faith in everything railway related.
The costs are always too high (when proposed)
The length of time a project takes is always too long
The end result is always way over budget to the point where 10% in you've already spent the amount it would have cost (When proposed).
This just screams of mismanagement. Better to get some Chinese managers and Japanese guys in the hot seats instead of this ridiculous Mark Carne.
Back in the day when Leyland and Rover group were around, same thing happened. Now we have car companies ran by foreign owners making top notch hardware at affordable prices that don't fall to bits.
as I have tried to point out many times one has to look at the deeper reasons. The poster in question and may others seem unable or unwilling to do that.
For instance, there is no understanding of how the initial figures suggested for GWML electrification grew or why or what has been done to try and prevent that happening again.
There is no understanding of the fractured nature of the "railway" in the UK or why that drives up cost
There is no understanding of the HSEA framework or specialty plant required ot deliver works on a live railway. It isnt the same as brown field site.
In all fairness Network Rail project managers should have been all over that from the start and costed properly to take into account the problems associated with the modern railway. I could tell Network Rail that the GWML is largely not a brown field site so why the surprise or that they might need certain bits of kit. And I'm not a rail professional.
Network Rail should have told the government when the GWML and MML projects were announced to not even think about electrifying the MML until the wires had at least reached Cardiff.
Another possibility is to contract out the electrification. Get DB to do it and manage the entire project for a fixed fee then the risk is theirs.
Costs also tend to go up when you end up having to hand dig each footing for an electrification mast rather than use a machine. It takes much longer, which puts up costs etc etc.
of course that shouldn't happen but it has. Hopefully steps have been taken to reduce ( but not eliminate) the likelihood of it happening again. Such is the world of projects.
The issue is that cost estimates were published too early in the process. It is also worth noting that I do not think the impact of reclassification of NR was correctly understood. Access to further monies which would have bridged funding shortfall disappeared overnight.
I wasn't aware of that, always something new to learn on this forum. I'm guessing they did because they had no idea what they might cut in half when they started drilling?
Well I'm afraid that is plain stupid. When ever I've had building work done I've always assumed that the builder will only give me an estimate once he's thought everything through and costed it properly. Otherwise he'll lose money and ultimately go out of business.
Then the people that costed it should never EVER be used again and go and make pizzas or something.
Well I'm afraid that is plain stupid. When ever I've had building work done I've always assumed that the builder will only give me an estimate once he's thought everything through and costed it properly. Otherwise he'll lose money and ultimately go out of business.
Then the people that costed it should never EVER be used again and go and make pizzas or something.
Then the people that costed it should never EVER be used again and go and make pizzas or something.
I hope it's being unduly pessimistic when it says even wiring to Corby is threatened.As I read the Times article, it isn't really new news.