richieb1971
Established Member
- Joined
- 28 Jan 2013
- Messages
- 2,047
I'll take a look north of Bedford later today if I can. Take a pic or two. I don't go that far north of Oakley most of the time.
I did a return trip from London to Leicester today and the current paused status is about 60 piles have been installed, approx 30 on each side of the track, these cover all four running lines starting a few miles north of Bedford, will they do anymore in the near future? who knows.
On a more positive note the four tracking north of Kettering is way under way with, I guess, about 1-2 miles installed.![]()
In all honesty I didn't even think there was 60 of them but I'll take your word for itThe four tracking is indeed good news and one is hopeful that the route at Market Harborough will be straightened out in the next five years but whether anything will get done in the Leicester area and Derby is a different matter. Heaven knows when the electrification project will be re-started
![]()
Is that to be four tracks north of Sharnbrook station all the way to Glendon Nth Jcn again?
Or just the section north of Kettering? (which seems a bit strange, but I suppose you could loop freights in there more easily).
The four tracking will be installed from Kettering to Corby only, please see this link.
http://www.networkrailmediacentre.c...between-corby-and-kettering-enters-next-phase
The four tracking will be installed from Kettering to Corby only, please see this link.
http://www.networkrailmediacentre.c...between-corby-and-kettering-enters-next-phase
Reinstating the 4th track from Bedford to Kettering, and redoubling Kettering Corby surely ?
The link doesn't say anything about what might happen south of Kettering. There are now three tracks throughout between Sharnbrook and Kettering and there was a report a few months ago that options were being looked at for reinstating the fourth over some of this section. However I would guess this will be deferred as part of the "pause" or cancelled completely, since no contracts appear to have been signed and making changes here would probably involve re-signalling, which can otherwise be deferred until electrification finally happens (assuming it does within a decade or so).
There will need to be some works, with some immunisation work, the usual signal re-sighting and the odd movement of cabinets, cable troughs and the like, but it shouldn't need wholesale resignalling.
I imagine that when a third track was restored between Kettering South and Harrowden a few years ago, no one ever dreamed that a fourth could possibly be required at some point in the future, another example of shortsightedness which will add considerably to expenditure.
Where was the only two-track section south of Leicester? After Market Harborough, space on the Up side indicates that there were four tracks at Braybrooke and on towards Desborough. Was it just two tracks between Wigston South and Mkt Harborough?
- it was Wistow.This is all assuming the signalling needs to be replaced - the new equipment installed during the East Midlands resignalling should be '25kV AC OLE compatible' as it has been Network Rail policy for quite some time to ensure minimal immunisation and resignalling works are necessary in the event electrification for a route is approved.
There will need to be some works, with some immunisation work, the usual signal re-sighting and the odd movement of cabinets, cable troughs and the like, but it shouldn't need wholesale resignalling.
The four tracking will be installed from Kettering to Corby only, please see this link.
http://www.networkrailmediacentre.c...between-corby-and-kettering-enters-next-phase
Can't be that long for things to start moving on that front though? When was the MML last done, early 80s? Always understood it as being 40 year design life.
When was West Hampstead done? That was around 1980 vintage Im sure.
I imagine that when a third track was restored between Kettering South and Harrowden a few years ago, no one ever dreamed that a fourth could possibly be required at some point in the future, another example of shortsightedness which will add considerably to expenditure.
Where was the only two-track section south of Leicester? After Market Harborough, space on the Up side indicates that there were four tracks at Braybrooke and on towards Desborough. Was it just two tracks between Wigston South and Mkt Harborough?
Invensys (now Siemens) re-did a fair amount of work 2010-2013, with new WESTLOCK equipment being installed and control being moved from Leicester PSB to EMCC Derby.
2-tracking to Corby, surely?
Wasn't it Glendon South Junction?
Wasn't it Glendon South Junction?
No. The four-track main line extended to Glendon North Jn. The Kettering & Manton line, however, diverged at Glendon South Jn. Under Leicester MAS the section between Glendon South Jn and Glendon North Jn was closed completely and the junction for the Corby line was moved back to Kettering North Jn. So re-doubling of the section in question will extend from Kettering North Jn to Corby, with KNJ remaining the point at which you can cross between the Market Harborough main lines and the slow lines through Kettering station.
Er, <cough>, surely the junction "for" the Corby line was always Kettering Sth Jcn ? You could not get from the fasts to the Corby line at Glendon South, which was only a junction on the Corby line which allowed access to/from Leicester route at Glendon North Jcn.
As a second observation, if during the MAS conversion they closed (and lifted?) Glendon South to Glendon North, then presumably they installed a new up fast to up slow at Kettering South (assuming, that is, that they retained slow lines south of Kettering South - sorry, I really don't know).
At least, they surely have done today, as (open to correction), I thought Kettering South in classic days only allowed access from the down fast to the Corby line, and up ex Corby to up fast.
I didn't think there was an up fast to up goods, or down goods to down fast - you needed to do that at Glendon South and Glendon North.
But it was a long time ago, and the grey matter does degrade ....
As always, everything depends on definitions.
....
Operationally, trains heading for Manton had to cross from the fasts to the slows at Kettering South Jn and use the slow-line platforms in Kettering station in order to be able to diverge at Glendon South. This situation changed in 1898, when a double junction from the fasts to the slows was laid in at Kettering North, so that from then until 1967 Manton-bound trains could leave the fasts north of the station.
At the end of Midland days you had a double junction fasts to slows at Kettering South Jn, a double junction slows to fasts at Kettering South, and a double junction fasts to slows at Kettering North. This lasted until 19 November 1967, when Kettering South and North SBs were closed and the connections they controlled abolished. Thus from 1967 on Kettering South Jn was the point where traffic for the Manton line had to cross fast to slow in order to be able to get to the SL-only junction at Glendon South.
What happened under Leicester MAS was a much more drastic reduction in facilities than was at first planned. The third and fourth lines were abolished between the new Harrowden Jn with the remaining single slow line (from Sharnbrook Jn) and Kettering South Jn.
The two slow lines remained thence through Kettering station to Kettering Jn, where they merged into a single line. A bit more than a mile and half to the north, at Kettering North Jn, this was joined to the down main by a ladder junction, the single line continuing as the Corby line.
Thus the fourth line was abolished from this point northwards and both third and fourth lines between the site of Glendon South Jn and the site of Glendon North Jn. So in operational terms the Corby single line (i.e. the Kettering & Manton line) can be accessed without reversal only via Kettering South Jn, though it does not legally or officially start at that point. The only change so far completed to that 1980s layout has been the creation of the third line between Harrowden Jn and Kettering South Jn.

(1) Was there a 'general' rule - or did it just depend on day-to-day regulatory conditions where the via-Manton trains crossed to/from the slows?
(2) I'm a bit surprised the Midland went to the expense of installing all these double junctions in the first place ....
(3)So (just to check I've got this right), the new Harrowden Jcn (new in the 1980s, at least) was, and presumably still is from what you write below, is a ladder from the slow line, across the up fast and onto the down fast?
(4) So today, if a train from Desboro needs to be switched to the slows through Kettering, it uses this ladder junction, I assume? I guess the tracks might be straight here (must be about MP 73 1/2?), so they could use standard turnouts for the ladder.
Otherwise, the next possibility to cross to the slow would be Harrowden Jcn.
In the past the Slow lines of the MML were actually Goods lines over most of their length, worked by permissive block and often jammed with nose-to-tail coal trains if the evidence of things like accident reports is to be believed. This must have made Kettering something of a bottleneck, especially after competition from the Great Central forced the Midland to run more fast trains via Corby and Melton.
2nd Dec 1979 for signalling; the train announcer moved out early in 1980 to the station building, when the box became disused.In stages 1979-1982 IIRC.
Although as it was the 'good old days' no doubt someone will pop up and say that it was installed and commissioned overnight in 20 mins by 3 blokes and a YTS trainee.
St Albans South was closed in 1980, as no doubt Mr Webb will be along shortly to confirm.