• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Mitcham Eastfields

Status
Not open for further replies.

Coxster

Established Member
Joined
9 Jun 2005
Messages
9,243
For anyone interested, Mitcham Eastfields FC/SN station in South London will not be opening tomorrow [Monday] as planned. Buses will run between Mitcham Eastfields and Mitcham Junction from 06:00 to 10:00 for passengers who are not aware of the delay to opening. As yet there is no word as to when it will open, other than "It is anticipated that the station will open shortly after 2nd June".

There's an ongoing 'Mitcham Eastfields - Latest' page on the Southern website that will be updated as and when further information is available.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,171
Location
0035
I suspect a few people will be looking at the design of this 'Modular' station for use at other locations in the country. I certaintly know it is something Bristol have brought up with Network Rail for their proposals for a new station at Shirehampton Park and Ride.
 

Max

Forum Staff
Staff Member
Administrator
Joined
8 Jun 2005
Messages
5,468
Location
Cambridge
I suspect a few people will be looking at the design of this 'Modular' station for use at other locations in the country. I certaintly know it is something Bristol have brought up with Network Rail for their proposals for a new station at Shirehampton Park and Ride.

Isn't Corby to be based on a similar design too?
 

Coxster

Established Member
Joined
9 Jun 2005
Messages
9,243
I suspect a few people will be looking at the design of this 'Modular' station for use at other locations in the country. I certaintly know it is something Bristol have brought up with Network Rail for their proposals for a new station at Shirehampton Park and Ride.
I seem to recall reading that Effingham Junction is to be rebuilt at some point as a modular station.
 

will1337

Member
Joined
5 Feb 2008
Messages
613
Location
Laaandaaan
I seem to recall reading that Effingham Junction is to be rebuilt at some point as a modular station.

The consultation over it is mentioned in this month's Modern Railways, the locals aren't terribly keen on its aesthetics.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,171
Location
0035
Isn't Corby to be based on a similar design too?

I seem to recall reading that Effingham Junction is to be rebuilt at some point as a modular station.

Yes, from Railway Gazette: "Effingham Junction and Greenhithe stations are being rebuilt using the system, and a new station will be built in Corby for a planned East Midlands Trains' service."

http://www.railwaygazette.com/news_view/article/2008/05/8377/modular_station_opens_this_month.html
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,493
Location
DTOS A or B
what i find is strange for a station in the greater london area is that the station is staggered on either side of the eastfields cctv level crossing, the traffic backed up is very busy at peak times so wont having a staggered platform cause more congestion.
 

Tom C

Member
Joined
4 Jul 2005
Messages
549
what i find is strange for a station in the greater london area is that the station is staggered on either side of the eastfields cctv level crossing, the traffic backed up is very busy at peak times so wont having a staggered platform cause more congestion.

Its can be backed right up to London Road/Streatham Road even at 23:00 at night as I have found trying to get home from work that way.

That crossing can be a nightmare and with trains now slowing to stop it will be even worse.
 

Coxster

Established Member
Joined
9 Jun 2005
Messages
9,243
what i find is strange for a station in the greater london area is that the station is staggered on either side of the eastfields cctv level crossing, the traffic backed up is very busy at peak times so wont having a staggered platform cause more congestion.
I guess it's so that the barriers can go up as soon as the train has cleared the crossing prior to stopping, rather than the barriers going down prior to the train arriving and then staying down during the train's station stop before only then clearing the crossing and allowing the barriers to raise.

The BBC have today published an article on their website - http://news.bbc.co.uk/1/hi/england/london/7430762.stm

Edit at 16:36:-

It turns out the delay is not too long afterall. The station opened at 16:00 for Southern services only, commencing with 2E72 at 16:09 (15:50 Victoria to Epsom 16:32) and 2E71 at 16:11 (15:48 Epsom to Victoria 16:29).

First Capital Connect services are expected to commence calling at the station tomorrow.
 
Last edited:

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
I guess it's so that the barriers can go up as soon as the train has cleared the crossing prior to stopping, rather than the barriers going down prior to the train arriving and then staying down during the train's station stop before only then clearing the crossing and allowing the barriers to raise.

The BBC have today published an article on their website - http://news.bbc.co.uk/1/hi/england/london/7430762.stm

Edit at 16:36:-

It turns out the delay is not too long afterall. The station opened at 16:00 for Southern services only, commencing with 2E72 at 16:09 (15:50 Victoria to Epsom 16:32) and 2E71 at 16:11 (15:48 Epsom to Victoria 16:29).

First Capital Connect services are expected to commence calling at the station tomorrow.

Barriers for CCTV level crossings are interlocked with signals and when I signed that route the signals were not that close to the crossing. Has the are been resignalled?
 

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
FCC said:
Customer Update. The new Mitcham Eastfields station is now open. Full details of First Capital Connect trains that call there are shown in the current Thameslink route Train Times timetable, available from all staffed stations on the Thameslink route.
 
Last edited by a moderator:
Status
Not open for further replies.

Top