NotATrainspott
Established Member
- Joined
- 2 Feb 2013
- Messages
- 3,304
Hmm... are there any Glasgow area branches not already committed to? Is Queen Street to Anniesland definitely going to happen?
Anniesland is the only line that hasn't been mentioned so far for CP5, I think. Even the City Union and Edinburgh South Suburban lines might come ahead of it as they have been identified, as has East Kilbride and Barrhead. Since Anniesland is interworked with diesels from further afield, there isn't much point electrifying it if none of the trains that are used on it are electric.
Google Maps suggests that the line has twelve overbridges/tunnels; two of which are under the Forth and Clyde canal and many of them are adjacent to stations making track-lowering for OHLE clearance more expensive. The platforms along the route are seemingly long enough for three-car operation but no longer which would be fine for the EMUs from Yoker but would be a problem with the 4-car EMUs for EGIP. There would be limited benefit during service perturbations when there are so few paths into Queen Street HL - if Hyndland-Partick is closed the Anniesland line is never busier but going to 3x20m from 2x23m at the same maximum 2tph isn't much of an improvement there. Overall it isn't a particularly good candidate for electrification until it will be the only diesel local line left in the Central Belt and if it weren't able to interwork with the longer-distance lines.
In the long term I feel the best option for better services would be to convert the line to high-floor tram-train operation. Its capacity is restricted mostly by the high level station and Cowlairs junction and it sees very infrequent diesel services to the WHL. It could still be electrified at 25kV for these other train services once bi-mode becomes a thing on the WHL but there would be quite a considerable benefit to running it much more frequently. 2tph is not high enough frequency to make it particularly competitive and with any higher a frequency a proper EMU would be overkill. If the tram-trains could come off the line just before Cowlairs they would be able to serve the area between there and the city centre which is pretty poorly served by rail at the moment. Going down to the city centre, the tram-trains could serve both Queen Street and Central stations, crossing the river and then taking over the Cathcart Circle line. Doing this would free up paths in both terminuses for longer-distance services, provide more frequent services on both the heavy rail lines taken over and provide the starting point for a proper tram network for Glasgow.