I'm interested as to which parts of this project enable the London service?
If anything, the result of these proposals appears to be the loss of 60 metres of track, with the line being cut back towards Haverfordwest rather than extended towards Milford Haven to reduce the walking distance into the town and/or accomodate a longer platform (eg. for London services).
Whats the proposed London service?
I think the new Labour MP (who I met once at his office in Haverfordwest) might be trying to get a GWR service introduced. If you ask me the bigger issue is the fact Carmarthen cannot accomodate a 9-car IET and the 5-car ones have never made much sense to me.
Its facing some criticism locally as locals would rather see a ticket office,
Is the independent ticket office still in business? The station's Wikipedia article claims it is, but it wouldn't be the first time Wiki was out of date.
I can’t understand why the second track at Milford Haven station was removed recently by Network Rail as it could have been used for ‘parking’ special trains such as the Britannic Explorer.
The loop at Milford Haven was lifted a fair while ago wasn't it? Wasnt' the Britannic Explorer stock still in Ireland as the 'Belmond Grand Hibernian' back when the loop was removed? There are plenty of other special trains out there of course, such as the Northern Belle, but that didn't stop Network Rail removing the loops at Fishguard Harbour and Pembroke Dock as well (I'm pretty sure they went during Arriva Trains Wales franchise).
Looks like the Britannic Explorer will be going to Haverfordwest and then going all the way back to Llanelli
Is that why some of the daytime services on the Milford Haven branch this coming week are replaced by road transport and a mystery STP loco-hauled working between Whitland and Haverfordwest and/or Johnston? Doesn't seem to be a normal engineering block as the morning and evening TfW trains are shown as running.