Midland Mainline will now be electrified

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jamesontheroad

Established Member
Joined
24 Jan 2009
Messages
2,234
Location
Umeå, Sweden

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
222s to the far west? well it would be much more sensible then trying to use IEP-BM (which AIUI would have to be formed into 2x5cars in order to negotiate the Devon banks)
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
It's been reported in railnews that Network Rail are proposing to electrify the MML, which IMO is great news.
It does beg the question of where will the 222s go, with suggestions for their use on the Great Western mainline. :D
--- old post above --- --- new post below ---
http://www.railnews.co.uk/news/general/2009/10/28-electrification-midland-main-line-goes.html

It is just taken from the electrification RUS which was published about a week ago. It is still just a proposal. You won't wake up tomorrow and it will be done - the GWML is going to be another eight years until it is done!
 

mrcheek

Established Member
Joined
11 Sep 2007
Messages
1,606
what about the HST`s will XC get them, like someone said yonks ago

this whole plan is so long term that the HSTs will surely be retired by the time electrification is complete!

then again, we have said that before......
 

NXEA!

Member
Joined
22 Oct 2009
Messages
486
All in all cross-country have 57 voyagers. XC already have 5 HST sets so I don't know if anybody would agree or if anybody thinks its possible with me but couldnt they refurbish the 54 FGW sets for yet another 10 years and put them to use on Cross-Country replacing the ghastly voyagers from long distance routes?
 

37401

Established Member
Joined
12 Nov 2008
Messages
3,276
Location
Birmingham
Ive got a feeling that deep down if they could XC would rid of all the 4 and 5 car voyagers for more 8 car HST`s, would solve most of the sardine problems
 

starrymarkb

Established Member
Joined
4 Aug 2009
Messages
5,985
Location
Exeter
All in all cross-country have 57 voyagers. XC already have 5 HST sets so I don't know if anybody would agree or if anybody thinks its possible with me but couldnt they refurbish the 54 FGW sets for yet another 10 years and put them to use on Cross-Country replacing the ghastly voyagers from long distance routes?

Nope - the HSTs are in need of replacing - Corrosion is an issue - if FGW had got their way their fleet would have been replaced by new trains from Siemens in 2004-2005
 

Crossforth

Established Member
Joined
20 Aug 2009
Messages
1,337
Location
Lancashire
How many HSTs do you reckon will be preserved?
Anybody here reckon we could club together as a forum to save up for one? :lol::lol:
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Ive got a feeling that deep down if they could XC would rid of all the 4 and 5 car voyagers for more 8 car HST`s, would solve most of the sardine problems

Its not the sardine problems they will be worried about, but taking the lowest cost option, which isn't HSTs. That applies to most, if not all, TOCs not just XC aswell (unless they can get public money to fund it...)
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,055
Location
Reston City Centre
...by the time the wires are up on the MML, the Voyagers will be getting pretty old, never mind the HSTs!

I just hope that if/when they wire it up, they do it properly and do all the lines, not just the main line (compare with the ECML where there's no electric diversion possible anywhere between Stevenage and Edinburgh, meaning any track work/ disruption throws the whole thing into chaos)
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
It is just taken from the electrification RUS which was published about a week ago. It is still just a proposal. You won't wake up tomorrow and it will be done - the GWML is going to be another eight years until it is done!

Thanks. You beat me to it.

Nitwit Rail float so many ideas in RUS documents, all of which are just ideas for consultation and consideration. They are neither announcements nor even firm proposals that anything they contain will ever happen.

Besides, the MML has been a candidate for further electrification ever since the wires went up at Bedford way back in the early 1980's, so it's omission from an electrification RUS would be strange in the extreme.

O L Leigh
 
Joined
17 Aug 2009
Messages
790
Location
Brigg Line
...by the time the wires are up on the MML, the Voyagers will be getting pretty old, never mind the HSTs!

I just hope that if/when they wire it up, they do it properly and do all the lines, not just the main line (compare with the ECML where there's no electric diversion possible anywhere between Stevenage and Edinburgh, meaning any track work/ disruption throws the whole thing into chaos)

It wont happen but an electric Peterborough-Spalding-Sleaford-Lincoln-Doncaster line would be a benefit :D
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,055
Location
Reston City Centre
It wont happen but an electric Peterborough-Spalding-Sleaford-Lincoln-Doncaster line would be a benefit :D

Agreed!

In Deltic/ HST days, we'd cope with any engineering/ accidents by diverting trains via Ely, via Lincoln, via Leeds, via Hartlepool, via Carlisle etc if there were diversions needed between London and Edinburgh.

Now, with 225s, as none of these alternative lines are wired, there's no decent "plan B", so we end up with 225s running London to York with HSTs doing the York - Edinburgh bit (or similar, depending on where the work is).

I'd hope that if they wire the MML they'll not just do the bare minimum like they did on the ECML... Do it properly or don't bother!
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,864
Location
East Anglia
Its all about cost though. Whats the point of doing the Erewash Valley at a cost of Millions of pounds just for the very few occasions the Derby-Chesterfield section is closed. If there was frequent electrified freight then yes but this is just not the case. Even the passenger trains on the Norwich-Liverpool & Nottingham-Leeds have to be diesel.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
It wont happen but an electric Peterborough-Spalding-Sleaford-Lincoln-Doncaster line would be a benefit :D

I'm sure WAGN were in talks with Railtrack a few years ago about running stopping services to Doncaster which would have seen the GNERs run non stop to Doncaster I think.

It fell though but still having that line electrified would be a good move as 91s could then use it on diversions should there be trouble on the route via Grantham.

It would also bring much needed investment into services in the area, okay the whole area won't get done but with a decent clockface service running along the line with feeder services from the diesel lines, it could very well be the beginning of the next chapter in the history of the railways in that area.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,773
Location
Central Belt
Agreed!

In Deltic/ HST days, we'd cope with any engineering/ accidents by diverting trains via Ely, via Lincoln, via Leeds, via Hartlepool, via Carlisle etc if there were diversions needed between London and Edinburgh.

Now, with 225s, as none of these alternative lines are wired, there's no decent "plan B", so we end up with 225s running London to York with HSTs doing the York - Edinburgh bit (or similar, depending on where the work is).

I'd hope that if they wire the MML they'll not just do the bare minimum like they did on the ECML... Do it properly or don't bother!

The other problem is the lack of route knowledge, I have been on a HST after a dewirement, we waited to use the mainline when we could have easily gone via Lincoln. The driver doesn't know the route and they can't just grab the first person to sit with said driver at Doncaster / Peterborough anymore.
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
Going back to Voyagers/Meridians, there's also a piece in RailNews about fitting them with a pan to make them bi-modal. Bombardier say it's never been done, but there's no technical reason why it couldn't.

This would be ideal, and i'd love to see it happen.

They could even make use of them currently between St Pancras and Bedford :D.
 